Loading...
DR8801-LR 881220 (5)REPORT NO. JOS ~o. 181'71 HAYNES. HOLLON & ASSOCIATES, INCORPOI~ATED Testing, Inspection & Materials Engineers 7800 8rookhollow Road , P O Box 35481 Dallas, Texas 75235. [214) 631-4372 O^TE ~8~ _ PROJECT: Drainage Improvements Bethel Road Coppell, Texas TESTEOFOR City of Coppell P. O. Box 478 Coppell, Texas 75019 Attn: Mr. Steve Morton FIELD MOISTURE-DENSITY TEST RESULTS Test Date Local i on Un i t Dry Ho i s tu re Reference Percent No. Weight (pcf) Content (~;) Curve Comp. 1 11/23/88 Sta, 0+50 @ Box Culvert Bottom 101.5 20.9 114.0 @ 14.2 88.9* Waterline Backfill: 2 12/5/88 Sra. 1+00 @ 3' Above Pipe at Drop- 100.3 24.1 104.4 @ 19.2 96.1 down 3 12/5/88 Sta. 1+30 @ 3' Above Pipe 99.5 25.3 109.2 @ 16.7#' 91.1' 4*, 12/6/88 Sta. 1+30 @ 3' Above Pipe 100.2 21.7 104.4 @ 19.2 96.0 Remarks: * Does not meet the density specifications. Average of two Standard Proctor Curves. Retake of previously tested area after reworking. Distribution: Buckelew Construction Submitted By: ~ ~.~~~_~