Loading...
Lost Creek TH-CS070806 THE.CiTY.OF COPPELL 1L'"~~"~:~".~.~ *. ~....~.....f~./;;~~:+ l' c.~./. /,,0;~::;P \) C -q~~ / ~' q ..\' II s' . \ ~ August 6, 2007 Matthew P. Kostial, P.E. Oracle Engineering 7012 Lindsley Avenue Dallas, TX 75223 RE: Lost Creek Townhomes Construction Plan Review Comments The City of Coppell has reviewed the referenced plans and has the following comments to offer: Pavine: and Profile Plan 1. We have received your request for the use of a vibratory screed rather than the slip-form paving machine. After careful considerations we have decided to adhere to Standard Detail 2030, Note #7 and require you to use a slip-form paving machine. Gradine: Plan/Drainal!e Plan 2. Separate drainage area B into two sections as previously shown on the 151 submittal. It has been hand drawn in green to depict the two separate areas. 3. Provide spot elevations for the warped concrete that will drain into the inlet. 4. Are roof drains going to be tied into the storm drain? Please submit revised copies for the City Engineer's stamp. The City of Coppell requires three sets for its use; your office should submit as many additional sets as necessary for construction operations. If you have any question you may contact this office at your convenience. Si~erely, ~a,EIT Graduate Engineer Office Phone: (972) 304-3686 Fax: (972) 304-7041 255 PARK\VAY * P.O BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673