Loading...
Duke Lesley-LR070705 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of In-Place Density Testing Report No.: 290841 Project No.: 0612510 Date of Service: 06/22/2007 Report Date: 07/05/2007 Project: Lesley Infrastructure Services: Perform In-Place Density Testing FIELD DENSITY TESTS Test Probe MID Moisture Wet Density Dry Density Density No Test Location Depth No. % (pcf) ( pct) (%max) Utility trench back fill 9 4" Gas line, Station 41+00, l' below grade 6" 272996 25.5 120.4 95.9 98 Utility trench back fill 10 4" Gas line, Station 41+00, grade 6" 272996 25.9 118.0 93.7 96 Utility trench back fill 11 Lateral, Station 41 +50, 2' below grade 6" 272996 26.1 116.8 92.6 95 Utility trench back fill 12 Lateral, Station 41 +50, l' below grade 6" 272996 25.4 118.6 94.6 97 Utility trench back fill 13 Lateral, Station 41 +50, grade 6" 272996 23.3 115.9 94.0 96 An asterisk (*) appears next to results which do NOT meet the project specifications. Technician: Dan Rogers Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) Started: 11 :30am Finished: 03:00pm Rone Engineering P-~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 2 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of In-Place Density Testing Report No.: 290841 Project No.: 0612510 Date of Service: 06/22/2007 Report Date: 07/05/2007 Project: Lesley Infrastructure Services: Perform In-Place Density Testing PROJECT DATA Contractor: Test Method: ASTM 0-2922 ASTM 0-3017 Gauge: Troxler 3430 Gauge Serial No: 35558 Test Mode: DT Standard Counts Moisture Density Current: 604 Current: 2340 Previous: 609 Previous: 2375 MOISTURE DENSITY RELATIONS Maximum Moisture Density Project Requirements MID No. Description % (pef) Moisture Density 272996 Reddish Brown Tan I Shaley Clay 22.5 97.5 Optimum +4 95 min FIELD DENSITY TESTS Test Probe MID Moisture Wet Density Dry Density Density No Test Location Depth No. % (pet) (pet) (% max) Utility trench back fill 4"Gas line, Station 47+00,2' below grade 6" 272996 29.1 * 119.2 92.3 95 Utility trench back fill 2 4" Gas line, Station 47+00,2' below grade, 6" 272996 26.1 116.1 92.1 95 RETEST #1 this report Utility trench back fill 3 4" Gas line, Station 47+00, l' below grade 6" 272996 23.1 115.0 93.4 96 Utility trench back fill 4 4" Gas line, Station 47+00, grade 6" 272996 24.8 121.2 97.1 100 Utility trench back fill 5 4" Gas line, Station 44+00,2' below grade 6" 272996 25.2 120.7 96.4 99 Utility trench back fill 6 4" Gas line, Station 44+00, l' below grade 6" 272996 25.6 117.8 93.8 96 Utility trench back fill 7 4" Gas line, Station 44+00, grade 6" 272996 25.4 120.3 95.9 98 Utility trench back fill 8 4" Gas line, Station 41 +00, 2' below grade 6" 272996 26.0 116.3 92.3 95 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (lB/lB) Page 1 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of In-Place Density Testing Cancellatior Report No.: 290314 Project No.: 0612510 Date of Service: 06/15/2007 Report Date: 07/05/2007 Project: Lesley Infrastructure Services: Perform In-Place Density Testing Report of Cancellation On this date a Rone Engineering Services, Ltd. representative arrived on site as scheduled. Upon arrival, our representative was informed that testing/inspection was cancelled for the day. Technician: Joe Jernigan Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) Started: 09:45am Finished: 11:15am Rone Engineering P-~ ;:::> K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd. (SS/LB) Page 1 of 1 ,..--.---. Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W LitUe York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Lime Series Testing Report No.: 288079 Project No.: 0612510 Date of Service: OS/21/2007 Report Date: 07/05/2007 Project: Lesley Infrastructure Services: Lime Series Testing Report of Tests Location: Dividend Road, station 1+00 Soil Description: Brow n and Tan Sandy Clay LL PL PI 0% Lim e Added 59 23 36 3% 59 30 29 6% 58 38 20 9% 56 45 1 1 Recom m endation: 8 % I im e is r e com men d e d wit h the follow in g 0 p t ion s : 6" d e p t h, 36 I b s Is q Y d 8" depth, 48 Ibs/sq yd Using a soil dry unit weight of 100 Ibs/cubic foot Started: ~Ii=-l Finished: 10:30am ..........~ .............~'\., ..:-- -<.,'C. OF 7/2 '\, f 0-\:....*........}~/<5' 1" ;' * :' , - ". * ., :*: "*~ I................ . .. .. .... .... .'1, ~ MARK L. McKAY ~ ~. .. . . .. .. .. .. . .. .. '. .. . , .. .. . "1 'I ~ ", 91067 .: 65 ,1 '.,O~"~ :9n~ S?'J.~~!f:/ ~ '~'J')'" ~.s' ...... v".#; 1'.IJv LIMITATIONS: The test results presented herein were prepared @Nl}l.tt. ~~mp"s ovided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subj ~~by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW) Page 1 of 1 Technician: Jeremy Watts Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) Rone Engineering ~M~ 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Lime Series Testing Report No.: 288080 Project No.: 0612510 Date of Service: OS/21/2007 Report Date: 07/05/2007 Project: Lesley Infrastructure Services: Lime Series Testing Report of Tests Location: Dividend Road, station 10+00 Soil Description: Brow n and Tan Clay LL PL PI 0% Lim e Added 66 25 41 3% 63 32 31 6% 61 40 21 9% 59 49 10 Recom m endation: 8% lim e is recom mended with the follow ing options: 6" de p t h , 36 I b s Is q Y d 8" depth, 48 Ibs/sq yd Using a soil dry unit weight of 100 Ibs/cubic foot ----........""'-, ..:- ::5.'(:.. 0 F r~ '\ ,?:.es:. \R.e~*olt 28B&f!/,,~"chnician time ~*0... ....*" ~~ ~. ~ . *'" ~ *: ...............;.....~ 7. ~.....~;ARK L. McKAY ~ . 'I, ............. ".. . .. .. ..... . .. . . fI: ~ Mark , PE Ij -Q. '. 91067 : lJ.J / 'I ~ '. f. <:),' k; ~ 1.0,<-, ...ICENSX::.... ,ff- 't~ ,_ <''& ......... ~0 .;0; {J ) . \\\ SIGNAL -e __..:' LIMITATIONS: The test results presented herein were prepared bas~ll-~fic samples provided for testing. We assume no responsibility for variation in quality (composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (DC) Page 1 of 1 Technician: Jeremy Watts Rone Engineering Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) ~ Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214)630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Lime Series Testing Report No.: 288081 Project No.: 0612510 Date of Service: OS/21/2007 Report Date: 07/05/2007 Project: Lesley Infrastructure Services: Lime Series Testing Report of Tests Location: Dividend Road, station 20+00 Soil Description: Tan Silty Clay LL PL PI 0% Lim e Added 68 24 44 3% 64 32 32 6% 62 40 22 9% 61 51 10 Recom m endation: 8% Iim e is recom mended with the follow ing options: 6" depth, 36 Ibs/sq yd 8" de p t h , 48 I b s Is q Y d Us in gas 0 il dry unit w e ig h t 0 f 100 Ib s Ic u b ic fo 0 t ---..............'....", f":~'\t:-.~:. T~-t~'.\'.a.. Rone Engineering ~~pott)\~9 ~u'r.ician time %*... ~ ...* 'I ~ * f"~'~'A'RK'L'.'M~K'A~'~"~ 1 ~i''i'':'"''9i'6"67''' '/iif Mark McKay, 't. O^,"'~~CENS~~"'~ f , ~.s ........ 0' - t '\\, SiGNAL <{;..~ :i/sj ) \ ~- I LIMITATIONS The test results presented herein were prepared based ~~~ifiC samp es provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW) Page 1 of 1 Technician: Jeremy Watts Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) -- ~--,......---... Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Lime Series Testing Report No.: 288082 Project No.: 0612510 Date of Service: OS/21/2007 Report Date: 07/05/2007 Project: Lesley Infrastructure Services: Lime Series Testing Report of Tests Location: Dividend Road, station 30+00 Soil Description: Light Brow n Silty Clay LL PL PI 0% Lirn e Added 70 27 43 3% 68 35 33 6% 66 43 23 9% 63 54 9 Recorn rn endation: 8% lirn e is recorn rn ended with the follow ing options: 6 II de p t h , 36 I b s Is q Y d 8 II de p t h , 48 I b s Is q Y d Using a soil dry unit weight of 100 Ibs/cubic foot --"""'" --'""::-<;t:. OF I '" ;- c,"'\ p-......... $'~ ~\. Rone Engineering ~~~p6rt 2~82'f€l-,:"~~cian time U.. ..,~~ ,....:. '. * I ~ MAR...I...........:..?':.~ ~""" K ~. McKAY ~ ~ r. ...... ' ~ r~o"" 91067' ...:...../ Mark McK y, PE 'I . (;, . 0:: , t ~ ...~E:NS'2-'?... t:./ ~ " \5'& ........ ..ff- - ~J.. '\\:ONAL E.~r:::..-:1Jr ., LIMITATIONS: The test results presented herein were prepared based ~~\'ii1;;-~~fic samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW) Page 1 of 1 Technician: Jeremy Watts Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Lime Series Testing Report No.: 288083 Project No.: 0612510 Date of Service: OS/21/2007 Report Date: 07/05/2007 Project: Lesley Infrastructure Services: Lime Series Testing Report of Tests Location: Dividend Road, station 40+00 Soil Description: Dark Brow n Sandy Clay LL PL PI 0% Lim e Added 41 18 23 3% 40 24 16 6% 40 31 9 9% 40 39 1 Recom m endation: 6% Iim e is recom mended with the follow ing options: 6" de p t h , 27 I b s Is q Y d 8" de p t h, 36 I b s Is q Y d Using a soil dry unit weight of 100 Ibs/cubic foot --...........'..."''- ~;--'\s OF rf:"}'\~ Rone Engineering ~","_79"'" h";dao to,,, ~ ;'0.,*,.,". I mz ' *' .,' ". * " 1 * : '. * , ~""~A'FlK'L"M~V.'AY''''~ I- ~.. . ..... ... ............... ., . iI. Mark c , PE ~, ~ ". 9106-Z-, ,,: l5 J 't 0 . (/ G'" .~, I ~~....9ENS:--.~'0~ ~Jd. -,\\ SSiO~~~'(;.~_../)rr ) LIMITATIONS: The test results presented herein were prepared baS~l!I~~(!IfiC samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW) Page 1 of 1 Technician: Jeremy Watts Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) -