Loading...
Duke Lesley-LR070602 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of In-Place Density Testing Report No.: 284340 Project No.: 0612510 Date of Service: 04/10/2007 Report Date: 06/02/2007 Project: Lesley Infrastructure Services: Perform In-Place Density Testing PROJECT DATA Contractor: Test Method: ASTM D-2922 ASTM D-3017 Gauge: Troxler 3430 Gauge Serial No: 35518 Test Mode: DT Standard Counts Moisture Density Current: 741 Current: 2637 Previous: 742 Previous: 2640 MOISTURE DENSITY RELATIONS Maximum Moisture Density Project Requirements MID No. Description % (pet) Moisture Density 272998 Brown I Silty Clay wI Organics 22.5 96.5 Optimum +4 95 min FIELD DENSITY TESTS Test Probe MID Moisture Wet Density Dry Density Density No Test Location Depth No. % (pet) (pet) (%max) Utility backfill Water line W-2, Station 0+50, 3' below grade 6" 272998 22.6 116.6 95.1 99 Utility backfill 2 Water line W-2, Station 0+50, 2' below grade 6" 272998 24.1 116.4 93.8 97 Utility backfill 3 Water line W-2, Station 0+50, l' below grade 6" 272998 24.9 116.8 93.5 97 Utility backfill 4 Water line W-2, Station 0+50, final 6" 272998 23.9 116.6 94.1 98 Utility backfill 5 Water line W-2, Station 3+50,3' below grade 6" 272998 23.7 116.3 94.0 97 Utility backfill 6 Water line W-2, Station 3+50, 2' below grade 6" 272998 23.7 116.8 94.4 98 Utility backfill 7 Water line W-2, Station 3+50, l' below grade 6" 272998 23.1 117.1 95.1 99 Utility backfill 8 Water line W-2, Station 3+50, final 6" 272998 23.0 117.5 95.5 99 LIMIT A nONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 1 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214)630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of In-Place Density Testing Report No.: 284340 Project No.: 0612510 Date of Service: 04/10/2007 Report Date: 06/02/2007 Project: Lesley Infrastructure Services: Perform In-Place Density Testing FIELD DENSITY TESTS Test Probe MID Moisture Wet Density Dry Density Density No Test Location Depth No. % (pef) (pet) (% max) Utility backfill 9 Water line W-2, Station 4+50,3' below grade 6" 272998 22.9 116.4 94.7 98 Utility backfill 10 Water line W-2, Station 4+50, 2' below grade 6" 272998 23.7 116.3 94.0 97 Utility backfill 11 Water line W-2, Station 4+50, l' below grade 6" 272998 24.1 117.5 94.7 98 Utility backfill 12 Water line W-2, Station 4+50, final 6" 272998 22.7 117.4 95.7 99 Technician: Joe Jernigan Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Alln: Mr. Alex Bennett PE (1-ec copy) Started: 09:00am Finished: 12:00pm Rone Engineering P-~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 2 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrieh, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of In-Place Density Testing Report No.: 285660 Project No.: 0612510 Date of Service: 04/23/2007 Report Date: 06/02/2007 Project: Lesley Infrastructure Services: Perform In-Place Density Testing PROJECT DATA Contractor: Test Method: ASTM D-2922 ASTM D-3017 Gauge: Troxler 3430 Gauge Serial No: 35518 Test Mode: DT Standard Counts Moisture Density Current: 732 Current: 2516 Previous: 738 Previous: 2526 MOISTURE DENSITY RELATIONS Maximum Moisture Density Project Requirements MID No. Description % (pet) Moisture Density 272998 Brown / Silty Clay wi Organics 22.5 96.5 Optimum +4 95 min FIELD DENSITY TESTS Test Probe MID Moisture Wet Density Dry Density Density No Test Location Depth No. % (pet) (pet) (% max) Utility backfill Storm drain, line A, Station 0+50, 3' below 6" 272998 24.2 116.4 93.7 97 grade Utility backfill 2 Storm drain, line A, Station 0+50, 2' below 6" 272998 24.8 115.3 92.4 96 grade Utility backfill 3 Storm drain, line A, Station 0+50, l' below 6" 272998 25.5 115.8 92.3 96 grade Utility backfill 4 Storm drain, line A, Station 0+50, final 6" 272998 22.8 115.7 94.2 98 Utility backfill 5 Storm drain, line A, Station 3+50, 3' below 6" 272998 24.7 115.2 92.4 96 grade Utility backfill 6 Storm drain, line A, Station 3+50, 2' below 6" 272998 24.1 114.8 92.5 96 grade LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 1 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of In-Place Density Testing Report No.: 285660 Project No.: 0612510 Date of Service: 04/23/2007 Report Date: 06/02/2007 Project: Lesley Infrastructure Services: Perform In-Place Density Testing FIELD DENSITY TESTS Test Probe MID Moisture Wet Density Dry Density Density No Test Location Depth No. % (pct) (pct) (%max) Utility backfill 7 Storm drain, line A, Station 3+50, l' below 6" 272998 24.8 115.2 92.3 96 grade Utility backfill 8 Storm drain, line A, Station 3+50, final 6" 272998 26.1 115.3 91.4 95 Technician: Joe Jernigan Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr Alex Bennett PE (1-ec copy) Started: 01:15pm Finished: 03:00pm Rone Engineering ,~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 2 of 2