Loading...
Duke Lesley-LR070525 (2) Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Tes1 Report No.: 283981 Project No.: 0612510 Date of Service: 04/06/2007 Report Date: OS/25/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring sample~ back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Concrete Supplier: Custom Crete Plant: Dallas Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 6.0" Air (%): 4.5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: TX 10753A Placement Date: 04/06/2007 Weather Conditions: Cloudy/Cool Time Sampled: 10:30am Batch time: Temperature - Air: 560F Concrete: 720F Truck No: 397 Ticket No: 361758 Air Content: 4.8% Unit Weight (pet): NA Overall Placement Location: Manhole - Slab at station 0+00 at sanitary sewer #1 Measured Slump (inches) 6.2 Sample Location: Same as above REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type - 1 1 04/09/2007 3 6.00 28.27 161,630 5,720 Unbonded Cap 1 2 04/13/2007 7 6.00 28.27 184,770 6,530 Unbonded Cap 1 3 05/04/2007 28 6.00 28.27 214,050 7,570 Unbonded Cap 1 4 HOLD LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/KG) Page 1 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Concrete Compressive Strength Tes1 Report No.: 283981 Project No.: 0612510 Date of Service: 04/06/2007 Report Date: OS/25/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring sample~ back to the laboratory for curing and testing in accordance with applicable standards. Remarks: Note: Batched on Site Note: Keith Flower GC-Duke Construction wants the three day break results phoned directly to him at 214-878-6115 Technician: David Best Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr Alex Bennett PE (1-cc copy) Started: 08:30am Finished: 12:00pm Rone Engineering V~J K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the speCific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/KG) Page 2 of 2