Loading...
Duke Lesley-LR070503 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Tes1 Report No.: 283256 Project No.: 0612510 Date of Service: 03/29/2007 Report Date: 05/03/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring sample~ back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Concrete Supplier: Lattimore Plant: 7 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): NA Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 1701 Placement Date: 03/29/2007 Weather Conditions: Overcast, humid Time Sampled: 01 :45pm Batch time: 11 :34am Temperature - Air: 670F Concrete: 830F Truck No: 1122 Ticket No: 7177041 Air Content: 1.6% Unit Weight (pct): NA Overall Placement Location: Manhole Station 13 Measured Slump (inches) 1.75 Sample Location: Manhole Station 13 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type - 1 1 04/05/2007 7 6.00 28.27 107,970 3,820 Unbonded Cap 1 2 04/26/2007 28 6.00 28.27 131,500 4,650 Unbonded Cap 1 3 04/26/2007 28 6.00 28.27 130,500 4,620 Unbonded Cap Average 4,630 1 4 HOLD Remarks: Water Added at Site: 10 gallons Technician: Bruce Eberts Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-cc copy) Started: 01:15pm Finished: 02:45pm Rone Engineering p~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 1 of 1