Loading...
Duke Lesley-LR070430 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 In-Place Density Testing Report No.: 282227 Project No.: 0612510 Date of Service: 03/20/2007 Report Date: 04/30/2007 Project: Lesley Infrastructure Services: Perform In-Place Density Testing PROJECT DATA Contractor: Test Method: ASTM D-2922 ASTM D-3017 Gauge: Troxler 3430 Gauge Serial No: 35518 Test Mode: DT Standard Counts Moisture Density Current: 742 Current: 2644 Previous: 738 Previous: 2636 MOISTURE DENSITY RELATIONS Maximum Moisture Density Project Requirements MID No. Description % (pet) Moisture Density 272998 Brown I Silty Clay wI Organics 22.5 96.5 Optimum +4 95 min FIELD DENSITY TESTS Test Probe MID Moisture Wet Density Dry Density Density No Test Location Depth No. % (pet) (pef) (% maxI Utility back fill 12" sanitary sewer, station # 12+00 9' below 6" 272998 23.8 116.0 93.7 97 grade Utility back fill 2 12" sanitary sewer, station # 12+00 8' below 6" 272998 24.3 116.3 93.6 97 grade Utility back fill 3 12" sanitary sewer, station # 12+00 7' below 6" 272998 24.5 115.9 93.1 97 grade Utility back fill 4 12" sanitary sewer, station # 12+00 6' below 6" 272998 23.8 116.0 93.7 97 grade Utility back fill 5 12" sanitary sewer,station # 12+00 5' below 6" 272998 24.8 114.9 92.1 95 grade Utility back fill 6 12" sanitary sewer,station # 12+004' below 6" 272998 24.1 116.4 93.8 97 grade LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 1 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 In-Place Density Testing Report No.: 282227 Project No.: 0612510 Date of Service: 03/20/2007 Report Date: 04/30/2007 Project: Lesley Infrastructure Services: Perform In-Place Density Testing FIELD DENSITY TESTS Test Probe MID Moisture Wet Density Dry Density Density No Test Location Depth No. % (pet) (pet) (%max) Utility back fill 7 12" sanitary sewer, station # 12+00 3' below 6" 272998 22.6 116.1 94.7 98 grade Utility back fill 8 12" sanitary sewer,station # 12+00 2' below 6" 272998 25.8 116.2 92.4 96 grade Utility back fill 9 12" sanitary sewer, station # 12+00 l' below 6" 272998 24.5 116.8 93.8 97 grade Utility back fill 10 12" sanitary sewer,station # 12+00 final 6" 272998 24.7 116.0 93.0 96 Technician: Joe Jernigan Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-cc copy) Started: 07:45am Finished: 10:15am Rone Engineering p~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd. (LB/LB) Page 2 of 2