Loading...
Lost Creek TH-CS070614 Rone Engineering .. . GEOTECHNICAL ENGINEERING . CONSTRUCTION MATER IALS TESTING . ENVIRotIMENTAL CONSULTING . FORENSIC ENGINEERING DALLASIFORT WORTH 8908 AMBASSADOR ROW DALLAS, TEXAS 75247 TELEPHONE 214-630-9745 TELEPHONE B17~Z84-1318 FACSIMILE 214-630-9819 HOUSTON 7701 WEST LITTLE YORK SUITE 600 HOUSTON, TEXAS 77040 TELEPHONE 7 I 3-996-9979 FACSIMILE 713-996-9972 AUSTIN 422' FREIORICH LANE SUITE 195 AUSTIN, TEXAS 78744 TELEPHONE 512-462-2733 FACSIMILE 512-462-1155 June 14, 2007 Mr. Jason Rose JR Development Companies 1207 Bethel School Court Coppell, Texas 75019 Re: Geotechnical Engineering Report Proposed Lost Creek Townhomes Coppell, Texas Rone Project No. 07-12989 Dear Mr. Rose: Submitted herewith are the results of a geotechnical investigation conducted for the referenced project. This investigation was performed in accordance with our proposal 07-11444 dated April 19, 2007. This report presents engineering analyses and recommendations for site grading and foundations. Results of our field and laboratory investigation are submitted in detail in the Appendix section of the report. We appreciate the opportunity to be of service to you on this project. Please contact us if you have any questions or need any additional services. Respectfully Submitted, tJ;:Jt.~ ---............."'" -- ~~ OF r \\\ - f~.:~............~..tl ~, '" c,.' * '. U\ Qt Mark L. McKay, P.E. ;' * ," ". * 'A . .' ,,*. .*v" Senior Geotechnical Engineer ~"":",,,,,,,,,,,,,,,,;,,,"l ~ MARK L. McKAY ~ ~ \~':~~~ON"~~~.::,J .. :;.c.... .' r~ "" fen ~ "...."& ...... ~\,J -0 \,\ 8/0NAL \::.'~/~ ISl tal Mr. ray, t".c. """,,--- r Vice President trenches should be free of any loose or soft material prior to the placement of the concrete. All grade beams and floor slabs should be adequately reinforced with steel to minimize cracking as normal movements occur in the foundation soils. According to the Post-Tension Institute (PTI) the design parameters for design of foundations at this site are as follows: Edge Moisture Variation Distance Center Lift 5.1 feet Edge Lift 4.1 feet Differential Swell Center Lift Edge Lift 2.4 inches 1.4 inches A moisture barrier should be used beneath the slab foundation in areas where floor coverings will be utilized (such as, but not limited to, wood flooring, tile, linoleum, and carpeting). Pavement Design Recommendations The fottowing pavement sections are a minimum recommended for this project based on a 2D-year life design. They are based on our engineering judgment and experience with environmental factors, including temperature, humidity, rainfall and swell characteristics of the soils. We recommend a 5-inch section of Portland cement concrete (PCG) for automobile parking areas and a 6-inch section for drive lanes receiving medium volume truck traffic. A minimum 7 -inch section is recommended in areas receiving frequent heavy trucks and dumpsters. Concrete with a minimum 28-day compressive strength of 3,500 pounds per square inch is recommended. All topsoil, existing pavement and structures, vegetation, and any unsuitable materials should be removed. The pavement subgrade should be proofrolled with a fully loaded tandem axle dump truck or similar pneumatic-tire equipment to locate areas of loose subgrade. In areas to be cut, the proofroll should be performed after the final grade is established. In areas to be filled, the proofroll should be performed prior to placement of engineered fill and after the pavement subgrade is established. Areas of loose or soft subgrade encountered in the proofroll should be removed and replaced with engineered fill, or moisture conditioned (dried or wetted, as needed) and compacted in place. Project No. 01-12989 Page 4 The clay soils are plastic and can undergo some volume change when subjected to moisture variations. If the moisture contents of these upper soils reduce, they may shrink and cracks may develop. If the moisture content of these materials increase, they could swell and lose strength. Shrinkage, swelling, or strength loss could be detrimental to the proper function of the pavement. Lime treatment of clay subgrade is recommended in areas receiving heavy truck traffic to provide more uniform subgrade support and improve these soil's strength characteristics. Lime treatment is not necessary in areas subject to light vehicular traffic. we l'='\.iUnll'ft::TI~hrn,~,I_"um-0t8 ~Cdllt lime' (by dry soif weight)' to a depltt of & inches:' Lime stabilization should be performed in accordance with Item 260, current Standard Specifications for Construction of Highways, Streets, and Bridges, Texas Department of Transportation (TxDOT) or applicable standards. The final grades must be such that drainage is facilitated, and access of surface water to the subgrade materials is prevented. Water can be introduced beneath the pavement through granular materials used for aggregate bases and utility line embedment, and this water can cause differential movement in the pavement. Aggregate base or a granular leveling course should not be used beneath pavements, and all utilities should have clay plugs substituted for granular embedment material at the edges of the pavement to reduce the risk of moisture access and possible swelling. General All grade supported slabs, outward swinging doors, outside stairs, etc. should be designed to accommodate anticipated potential movements as presented in the section titled "Potential Vertical Soil Movements" earlier in this report. Every attempt should be made to limit the extreme wetting or drying of the subsurface soils because swelling and shrinkage of these soils will result. Standard construction practices of providing good surface water drainage should be used. A positive slope of the ground away from any foundation should be provided. Also, ditches or swales should be provided to carry the run-off water both during and after construction. Lawn areas should be watered moderately, without allowing the clay soils to become too dry or too wet. Roof runoff should be collected by gutters and downspouts, and should discharge away from the building. Backfill for utility lines or along the perimeter beams should consist of site-excavated soil. If the backfill is too dense or too dry, it will swell and a mound will form along the trench line. If the backfill is too loose or too wet, it will settle and a sink will form along the trench line. Backfill should be Project No. 07-12989 Page 5