ST9905-CS070322Page 1 of 1
Ken Griffin - RE: Bethel Road Retaining Walls 1 thru 6
From: <gdkraus@transystems.com>
To: <Johngay8(c~aol.com>
Date: 3/22/2007 4:52 PM
Subject: RE: Bethel Road Retaining Walls 1 thru 6
CC: <kgriffin@ci.coppell.tx.us>, <lsmith(c~TiseoPaving.com>, <chanson(c~iowabridge.com>
John,
Per our conversation earliertoday, I have double checked the plans and the retaining wall sketch in section A-A
(and B-B) are reversed. The TxDOT detail on Sheet No. 88 is correct. Thanks,
Garry
From: Johngay8~aol.com [mailto:Johngay8~aol.com]
Sent: Thursday, March 22, 2007 4:02 PM
To: DL-Garry Kraus
Cc: kgriffin@ci.coppell.tx.us; Ismith~TiseoPaving.com; chanson~iowabridge.com
Subject: Bethel Road Retaining Walls 1 thru 6
Gary,
As we discussed on the phone, Tiseo paving will construct the retaining walls as per the TxDot detail RW 1(L)
A plan sheet No. 88, and disregard Section A-A on plan sheet 81, 82, & 83 as it pertains to the Tw & Hw being
reversed on that drawing. Any questions give me a call.
Thanks, John
AOL now offers free email to everyone. Find out more aboutwhat's free from AOL atAOL.com.
file://C:1Documents and SettingslradloolLocal SettingslTemplXPgrpwise14602B45ECity_... 9/14/2009
Page 1 of 1
Ken Griffin - Bethel Road Retaining Walls 1 thru 6
From: <Johngay8@aol.com>
To: <gdkraus@transystems.com>
Date: 3/22/2007 3:06 PM
Subject: Bethel Road Retaining Walls 1 thru 6
CC: <kgriffin@ci.coppell.tx.us>, <lsmith@TiseoPaving.com>, <chanson@iowabridge.com>
Gary,
As we discussed on the phone, Tiseo paving will construct the retaining walls as per the TxDot detail RW 1 (L)
A plan sheet No. 88, and disregard Section A-A on plan sheet 81, 82, & 83 as it pertains to the Tw & Hw being
reversed on that drawing. Any questions give me a call.
Thanks, John
AOL now offers free email to everyone. Find out more about what's free fromAOL at AOL.com.
file:IIC: \Documents and Settings\rbrother\Local Settings\ Temp \XPgrpwise\4602A984City... 8/10/2007