Loading...
ST9902-CS070213 (8/10/2007) Ken Griffin - RE: SH 121 Sandy Lake TXU Transmission Line Pa From: To: Date: Subject: "Mat Galliton" <mat@seitexas.com> "'Ken Griffin'" <kgriffin@ci.coppell.tx.us> 2/13/2007 7:41 AM RE: SH 121 @ Sandy Lake TXU Transmission Line Thank you sir, I'll let you know if we need anything else. Thank you and have a great day, Mat Galliton Scarborough Engineering, Inc. 3129 Handley Dr. Ft. Worth, TX 76112 Office: (817) 451-6687 Fax: (817) 451-0476 Cell: (817) 694-4387 E-Mail: mat@seitexas.com -----Original Message----- From: Ken Griffin [mailto:kgriffin@ci.coppell.tx.us] Sent: Monday, February 12, 2007 10: 11 PM To: mat@seitexas.com Subject: Re: SH 121 @ Sandy Lake TXU Transmission Line Mr. Galliton The section of Sandy Lake from SH 121 to North Coppell Road has been constructed and the transmission towers on the north side were avoided. We intentionally shifted the road south to miss them. TXU has wooden transmission poles on the south side of Sandy Lake from North Coppell Road to Denton Tap Road. That project has not started yet, but some of them may need to be relocated. That project is scheduled to begin in 2008. If you have any other questions or need additional information, feel free to contact me. Ken Griffin, P. E. Director of Engineering/Public Works 972-304-3686 >>> "Mat Galliton" <mat@seitexas.com> 02/12/07 11 :57 AM >>> Ken, We are working on the relocation of TXU Transmission structures at SH 121 @ Sandy Lake. I have had a few conversations with Matt Atkins at Teague Nail & Perkins concerning Sandy Lake and the TXU Transmission line running parallel to the road. He gave me your name for a contact concerning the utility adjustments for th is project. (8/10/2007) Ken Griffin - RE: SH 121 Sandy Lake TXU Transmission Line Pa He informed me Sandy Lake changes are complete and it is already in operation. Therefore, the TXU transmission line parallel to Sandy Lake will not need to be adjusted. Is this correct? If this is correct, I would like to see if we could get a letter from you stating we would not need to relocate the transmission structures for that project. I am aware we will need to move a structure or two with the widening and changes being made for the TxDOT SH 121 project. Please keep in mind this is for TXU Transmission only, not TXU distribution. . If you have any questions or concerns please feel free to give me a call. Thank you and have a great day, Mat Galliton Scarborough Engineering, Inc. 3129 Handley Dr. Ft. Worth, TX 76112 Office: (817) 451-6687 Fax: (817) 451-0476 Cell: (817) 694-4387 E-Mail: <mailto:mat@seitexas.com>mat@seitexas.com