Loading...
ST9902-CS060120 Page 1 of 1 Ken Griffin - West Sandy Lake Road - Phase 2 From: To: Date: Subject: CC: "Matt Atkins" <matkins@tnp-online.com> "Ken Griffin (E-mail)..<kgriffin@ci.coppell.tx.us> 1/20/2006 3:15 PM West Sandy Lake Road - Phase 2 "Suzan Taylor (E-mail)..<staylor@ci.coppell.tx.us>. "Mike Jones" <mjones@tnp- online.com>, "Mark Holliday" <mholliday@tnp-online.com> Memo - KenPhase2Federal011306.doc Attachments: Good Afternoon Ken, Attached, please find a memo regarding the federal funding issues and the second phase of West Sandy Lake Road. Thanks and have a good weekend. Matt Atkins, P.E. Teague Nail and Perkins, Inc 12160 North Abrams Road, Ste. 508 Dallas, Texas 75243 Ph: 214-461-9867 Fax: 214-461-9864 The Information contained in this message is intended to be legally privileged and confidential for the use of the named recipient. If the reader is not the named recipient, you are hereby notified that any dissemination or copying of this message is strictly prohibited. If you are not the named recipient, please immediately notify the sender and destroy the message and all copies. file:/ /C: \Documents and Settings\rbrother\Local Settings\ Temp \XPgrpwise\4 3 DOFE8CCity... 8/10/2007 ~~ TEAGUE NALL AND PERKINS UIIJINC ENGINEERS. SURVEYORS . CONSULTANTS Memorandum To: Ken Griffin, P.E. From: Matt Atkins, P.E. cc: Suzan Taylor, Mike Jones, P.E., Mark Holliday, P.E. Date: January 20, 2006 Re: Federal Funding for West Sandy Lake Road - Phase 2 Per our conversation on January 10, 2006, I want to confirm the direction you would like us to proeceed regarding the remaining portion of West Sandy Lake Road. It is my understanding that the City has secured approximately $1 million in federal funding to aid in the construction of this project. However, in order to obtain the funds, the portion of the project constructed with the federal money would need to be designed to federal standards. For this reason, you are anticipating separating the project into two phases, and constructing the section between the intersections of the Coppel! Roads, including the bridge over Cottonwood Creek, with the federal funds. As you know, we have been working on the preliminary design plans for West Sandy Lake Road from Coppel! Road North to Denton Tap Road, and we are approximately fifty percent complete with these plans. Based upon our understanding of the recent developments regarding the federal funding, there are a couple of options for proceeding with our design. The first option would be to temporarily suspend the remaining design completely until the details of the impacts of utilizing the federal funding for a portion of this project are finalized. Once the details are finalized, we can proceed under an amended contract to complete the design. However, depending upon the length of the delay, an ammendment may be needed, even if the federal funding is not utilized or does not affect the design. The second option would be to continue work on the preliminary plans. However, as you suggested, we would focus the design efforts on the section from Coppel! Road South to Denton Tap Road. This approach assumes that the effect on the design of the section between the intersection of the Coppel! Roads due to the federal funding does not impact the horizontal and vertical alignments of the current design. If either of these elements change, then the effects could extend over a signifcant portion of the roadway east of Coppel! Road South, resulting in a change to the completed design of that portion. We are open to either option that you believe would make this portion of the project proceed as smooth as possible. Also, if you have any other ideas or options for moving forward with the design, we would be happy to entertain those ideas as well. Please let me know, at your earliest convenience, how you would like us to proceed. 12160 North Abrams Road · Dallas, Texas 75243.214.461.9867 phone. 214.461.9864 fax www.tnp-online.com