Loading...
Shake & Shingle-CS070810 THE.CITY.OF COPPELL ~~~:''''r~,\..~*....fj ro" l' ~:~(" -, . ...)~ I:' -~, 3......... -\' ~", I'> II 0 \ August 1 0,2007 Tracy Owens Ratcliff Constructors 14901Quorum Dr., Suite 715 Dallas, Texas 75254 Fax: 972/432-9943 RE: Shake & Shingle, Lot 1 R Block A Dear Ms. Owens: A pre-construction conference on the referenced project has been scheduled for August 14, 2007 at 9 a.m. in the 2d floor, Lobby conference room in Town Center at 255 Parkway Blvd. Please notify the franchised utility companies, contractors, sub-contractors, testing lab and any other interested parties so that they may have a representative present. If you have any questions concerning this project prior to the scheduled meeting, feel free to contact me at (972) 304-3684. Sincerely, ~~/~ Larry Davis, Construction Inspector Office Phone: 972-304-3684 Fax: 972-304-3570 cc: Ken Griffin, P.E., Dir. of Engineering & Public Works Glenn Hollowell, P.E., Asst. Dir. of Public Works Lee Stone, Commercial Building Inspector Tim Oates, Fire Marshal Kathy Ingle, 972/462-9518 Pete Hennessey, 972/245-7087 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/4620022 * FAX 972/304 3673 2 RESPONSIBILITY FOR PRE-CONSTRUCTION MEETING NOTIFICATION The owner I owner's representative will be notified of the date, time and place of the pre-construction meeting once it is scheduled by the Construction Inspector assigned to the project. It is the owner / owner representative's responsibility to notify the following parties: . Franchise Utilities (including but not limited to electric, gas, cable, & telephone providers) . Geotechnical firm . Project Engineer . Contractors or subcontractors for excavation, utility, & paving operations . SWPPP representative