Lost Creek TH-CS070813
THE.CiTY.OF
COPPELL
~~* I.
A 0
August 13,2007
Matthew P. Kostial, P .E.
Oracle Engineering
7012 Lindsley Avenue
Dallas, TX 75223
RE: Lost Creek Townhomes
Fee Assessment Letter
Dear Mr. Kostial:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the
Development Fee calculations for the referenced development.
Please make payment for the Impact Fees to the City of Coppell in the amount of $48,025.00 and forward
to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of
the assessed fees that need to be paid prior to filing of the final plat. Please note that the Water and Sewer
Impact Fees are due and payable at the issuance of a Building Permit. Also, please provide a copy of the
Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified.
The construction inspection fees must be paid prior to scheduling a pre-construction meeting.
The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by
separate check at the Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when
those fees are paid.
Appropriate payment of the required fees will help insure a successful beginning of this project. We look
forward to working with you on this project. If you have any questions, please contact me.
Sincerely,
~
Michael Garza, EIT
Graduate Engineer
cc: Jennifer Miller, Finance Director
Mary Beth Spletzer, Administrative Secretary, Building Inspections
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Brad Reid, Director of Parks and Recreation
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
DEVELOPMENT FEE TABLE
Project: Lost Creek Townhomes
Date: 4/25/2007 rev. (8/10/2007)
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
FILING
PLAT
Water Impact Fee $24,003.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $1,300.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $630.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $65.36
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $750.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $22,500.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $1,250.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $1,250.00
(100% due at Issuance of Building Permit)
Park Fee $32,125.00 $32,125.00
(100% due prior to Filing Plat)
Roadway Impact Fee $15,900.00 $15,900.00
(100% due prior to Filing Plat)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project) II
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project) II
Construction Inspection Fee Information not Available
(100% due prior to Start of Construction)
ITOT AL II $99,803.361
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $48,025.00
DEVELOPMENT FEE WORKSHEET
PROJECT:
DATE:
Lost Creek Townhomes
4/25/2007 rev. (8/10/2007)
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
25 - 5/8 inch X 3/4 inch =
1 - 1 inch =
o =
o =
Fireline Meter(s):
Total #: 26.67 ESU's @ $900.00 ea.
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #:
25
1.67
o
o
26 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 25 Domestic Meter(s) @ $25.20
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: 0 Fireline Meter(s) @
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 25 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
$65.36
$0.00
$0.00
ESU's
ESU's
ESU's
ESU's
Wastewater Impact Fee:
Total Domestic Meters ESU's: 25 @ $900.00 ea.
(Due prior to issuance of building permit)
Wastewater Tap Inspection Fee:
Total #: 25 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 25 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
Park Fee (For Residential Developments Only):
Page 1
$24,003.00
$1,300.00
$630.00
$65.36
$0.00
meter provided by developer
$750.00
$30.00
$22,500.00
$1,250.00
$1,250.00
DEVELOPMENT FEE WORKSHEET
* Preliminary plat approved: After October 26, 1993
Park Development Zone :
25 Single-family @ $1,285.00 per lot
o Multi-family @ $1,285.00 per unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
Zone 1
$32,125.00
$0.00
$15,900.00
Information not Available
Information not Available
Information not Available
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Lost Creek Townhomes
4/25/2007 rev. (8/10/2007)
ROADWAY IMPACT FEE:
1
Residential
Residential Medium/Low
25
25.00
4.24
$150
* (Figure 4.1 - Roadway Impact Fee Study)
** (Table 4.10 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - The Master Fee Schedule)
~:. .HAMo'U.1VtPU.it~~::::: ~..:::~:$)$;9,@~~Q~
THE.CITY.OF
COPPELL
~~*~~
eJ{ ~ q
A... . \ ~
P.O. Box 9478
255 Parkway Blvd
Coppell, TX 75019
Phone: (972)304-3686
Fax: (972) 304-7041
ENGINEERING DEPARTMENT
FAX COVER SHEET
To:
Matt Kostial, P.E
From: Michael Garza
Fax: 214-853-9381
Date: 8/14/07
Phone: 214-321-1436
Pages:
6 (including cover sheet)
Re:
Lost Creek Townhomes
cc:
o Urgent DFor Review
o Please Comment 0 Please Reply
o As Requested
-Comments:
Attached are the impact fees that need to be paid prior to filing the
plat and prior to the pre-construction meeting. The construction
permit application and inspection fees must also be paid prior to
scheduling a pre-con meeting. If you have any other questions feel
free to contact this office.
IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304-3686
"City of Coppell Engineering - Excellence By Design"