Alexander Ct-CS070817 (3)T H E C I T Y - O F
COPPELL
9
August 17, 2007
Tim Bennett
Tim Bennett Engineering
203 Jackson Street
Wylie, Texas 75098
RE: Alexander Court
Fee Assessment Letter (revision of meter)
Dear Mr. Bennett
Enclosed is a revision of a copy of the City of Coppell Development Fee Assessment table, along with a
copy of the Development Fee calculations for the referenced development. The water meters have been
reduced from a 1" to a 5/8 ". The fee assessment table reflects the change in the meter sizes and the
impact fees associated with them.
The fees for water and sewer taps, and for the final utility inspection need to be paid by check at the
Public Works Service Center, 816 S. Coppell Road. Fees for the water meters and meter deposits should
be paid by separate check to the Building Inspections Department, 500 Southwestern Blvd. Meters will
be ordered when those fees are paid.
Appropriate payment of the required fees will help insure a successful beginning of this project. We look
forward to working with you on this project. If you have any questions, please contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Director of Engineering/Public Works
cc: Jennifer Miller, Finance Director
Mary Beth Spletzer, Administrative Secretary, Building Inspections
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Brad Reid, Director of Parks and Recreation
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
DEVELOPMENT FEE TABLE
Project: Alexander Court
Date: 61812007 rev(811712007)
TOTAL
AMOUNT DUE
FEES DUE
PRIOR TO
FILING
PLA
Water Impact Fee
$26,100.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee
$1,450.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic)
$730.80
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline)
$0.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic)
$870.00
100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit
$0.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee
$26,100.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee
$1,450.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee
$1,450.00
(100% due at Issuance of Building Permit)
Park Fee
$37,265.00
$37,265.00
(100% due prior to Filing Plat)
Roadway Impact Fee
$0.00
$0.00
(100% due prior to Filing Plat)
Street Light Fee
Information not Available
(100% due prior to Acceptance of Project)
Street Sign Fee
Information not Available
(100% due prior to Acceptance of Project)
Construction Inspection Fee
Information not Available
(100% due prior to Start of Construction)
TOTAL
$95,415.80
$37,265.00
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT
DEVELOPMENT FEE WORKSHEET
PROJECT: Alexander Court
DATE: 6/8/2007 rev(811712007)
Water Impact Fee:
Domestic Meter(s): 29 - 5/8 inch X 3/4 inch = 29 ESU's
Irrigation Meter(s): 0 = ESU's
0 = 0 ESU's
Fireline Meter(s): 0 = 0 ESU's
Total #: 29 ESU's @ $900.00 ea. $26,100.00
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #: 29 Connections @ $50.00 ea. $1,450.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 29 Domestic Meter(s) @ $25.20 $730.80
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 0 Irrigation Meter(s) @ $0.00 $0.00
Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00
Total #: n/a Fireline Meter(s) @ $0.00 meter provided by developer
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 29 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 0 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 29
(Due prior to issuance of building permit)
@ $900.00 ea.
Wastewater Tap Inspection Fee:
Total #: 29 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 29 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
Park Fee (For Residential Developments Only):
$870.00
$0.00
$26,100.00
$1,450.00
$1,450.00
Page 1
DEVELOPMENT FEE WORKSHEET
* Preliminary plat approved: After October 26, 1993
Park Development Zone :
29 Single- family @ $1,285.00 per lot
0 Multi- family @ $1,285.00 per unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right -of -way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right -of -way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Zone 1
$37,265.00
$0.00
$0.00
Information not Available
Information not Available
Information not Available
Page 2
ROAi. WAY IMPACT FEE CALCULA'T'IONS
PROJECT: Alexander Court
DATE: 6/8/2007 rev(8 11712007)
ROADWAY IMPACT FEE:
Service Area *
1
Category **
Residential
Land Use **
Residential (Medium /Low)
No. Lots /Units
29
Develo ment Units **
29.00
Vehicle Miles per Development Unit **
4.24
Fee per Vehicle Mile * **
$150
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) $18,444.00
* (Figure 4.1 - Roadway Impact Fee Study)
** (Table 4.10 - Roadway Impact Fee Study)
* ** (Schedule 2, Page 3 - The Master Fee Schedule)
6311 Sq. Ft of land to be dedicated as R.O.W by the plat, the property value per the Dallas
County Appraisal District is $3.44 /sq.ft. For a credit of 6311X$3.44 = $21709.84.
Percent of Credit Toward Roadway Impact Fees 100%
Total Credit $18,444.00
AMOUNT DU)1 $fl,fl0
Z )tbg
&:/
4-4 4-
�
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Alexander Court
DATE: 61812007 rev(8 11712007)
ROADWAY IMPACT FEE:
Service Area *
1
Category **
Residential
Land Use **
Residential Medium/Low
No. Lots /Units
29
Develo ment Units **
29.00
Vehicle Miles per Development Unit **
4.24
Fee per Vehicle Mile * **
$150
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit ) x (Fee per Vehicle Mile) $18,444.00
* (Figure 4.1 - Roadway Impact Fee Study)
** (Table 4.10 - Roadway Impact Fee Study)
* ** (Schedule 2, Page 3 - The Master Fee Schedule)
6311 Sq. Ft of land to be dedicated as R.O.W by the plat, the property value per the Dallas
County Appraisal District is $3.44 /sq.ft. For a credit of 6311X$3.44 = $21709.84.
Percent of Credit Toward Roadway Impact Fees 100%
Total Credit $18,444.00
Itll lY1' :D V