Loading...
Duke Lesley 1A-CS070815 THE.CITY.OF - COPPELL August 15,2007 C. Jack Evans, P.E. Pacheco Koch Consulting Engineers 8350 N. Central Expressway, Suite 1000 Dallas, TX 75206 RE: Point West VI, Lot 1 Block AI D~ ~..~ Construction Plan Review Comments (1 st submittal) Dear Mr. Evans: The City of Coppell has reviewed the referenced plans and has the following comments to offer: General - 1. Include the title "Duke Lesley Addition" on the cover page Plat - 2. All utility easements should by 20' per the city ordinance. Label the size ofthe easements on the plat. Storm sewer - 3. Storm line A on sheet C3.2 shows a 21", the profile shows an 18". Review the calculations for the 18" on the profile sheet. Water and Sewer- 4. The three fire hydrants and the vault on the north side of the property should be placed on a landscaped island. S. Is there enough information on the sanitary sewer for the contractor to build? If not, profiles may need to be provided. 6. Has there been a utility maintenance agreement provided for the maintenance of the private utilities that cross lot lines? If you are going to request a waiver of lime beneath the pavement, a letter should be provided to our office for approval. For any additional clarification or discussion concerning the engineering comments, please feel free to contact this office. 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 2 Once these comments have been addressed, please resubmit this marked up copy along with two additional sets for a second review. Sincerely, ~za E.I.T. Graduate Engineer Office Phone: (972) 304-3679 Fax: (972) 304-3570 mgarza@ci.coppell.tx.us