Loading...
Duke Lesley-LR070725 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Tes1 Report No.: 292493 Project No.: 0612510 Date of Service: 07/17/2007 Report Date: 07/25/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring sampleE back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Concrete Supplier: LMC Plant: 3 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 1701 Placement Date: 07/17/2007 Weather Conditions: Hot, clear Time Sampled: 03:40pm Temperature - Air: 1020F Truck No: 1111 Air Content: NA Overall Placement Location: Y Inlet, Station 0+38.04 Batch time: 02:43pm Concrete: 980F Ticket No: 3233497 Unit Weight (pet): NA Measured Slump (inches) 4.5 Sample Location: Station 0+38.04 REPORT OF TESTS Cylinder Marked Date Set No. Tested - 1 1 07/24/2007 1 2 08/14/2007 1 3 08/14/2007 1 4 09/11/2007 Age (days) 7 Diameter (in) 6.00 28 28 56 Technician: Cedric Derrett Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 96,350 Compressive Strength (psi) 3,410 Area (in2) 28.27 Fracture Type Unbonded Cap Started: 01 :45pm Finished: 04:45pm Rone Engineering P-~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specifiC samples provided for testing. We assume no responsibility for variation in quality (composition, appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 1 of 1