Loading...
Duke Lesley-LR070723 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Tesf Report No.: 292351 Project No.: 0612510 Date of Service: 07/16/2007 Report Date: 07/23/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring sample~ back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: LMC Plant: 3 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 1701 Placement Date: 07/16/2007 Weather Conditions: Hot, clear Time Sampled: 03:15pm Temperature - Air: 1000F Truck No: 7021 Air Content: NA Overall Placement Location: Curb inlets Measured Slump (inches) 4.0 Batch time: 02:25pm Concrete: 950F Ticket No: 3233408 Unit Weight (pct): NA Sample Location: Station 0+13.40 at H-5, Station 0+04.70 at H-3 REPORT OF TESTS Cylinder Marked Date Set No. Tested 1 1 07/23/2007 1 2 08/13/2007 1 3 08/13/2007 1 4 09/10/2007 Age (days) 7 Diameter (in) 6.00 28 28 56 Technician: Cedric Derrett Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 100,870 Compressive Strength (psi) 3,570 Area (in") 28.27 Fracture Type Un bonded Cap Started: 02:00pm Finished: 04:45pm Rone Engineering P-~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, ltd. (lB/lB) Page 1 of 1 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W l irtle York, St.. 600, Hou~ton, TX 77040 4421 f,,,idrich. Stl> 195, Austin, TX 78744 CorpO(<lto;, Phone: (214) 630.9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 DaJ!as, TX 75254-2936 Report of Concrete Compressive Strength TeS1 Report No.: 292046 Project No.: 0612510 Date of Service: 07/12J2007 Report Date: 07/23/2007 Project; L.esley Infrastructure Services: Obtain samples of fresh concrete at thB placement locations, perfoml required testing, cast COmoreSSlve slf8nglh s<lmples and bring s8mple~ back to the laboratory (or curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: lMC Plant; 3 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 4" - 6" Air (%): NA Test Method: ASTM C-172 ASTM C31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C39 Mix Design 1.0.: 1701 Placement Date: 07/12/2007 Weather Conditions: Sunny Time Sampled: 03:45pm Temperature - Air: 980F Truck No; 5005 Air Content: NA Overall Placement Location: 6'xS' Junction box walls Batch time: 03: 11 pm Concrete: 960F Ticket No; 3233229 Unit Weight (pet): NA Measured Slump (inches) 35 Sample Location: Grid line H-1, Station 0+7036 REPORT OF TESTS Cylinder Maximum Compressive ___M<!~ked _ Date Age Diameter Area Load Strength Fracture Sat No. Tested ____L~~~ (in) (in') (Ibs) ______jpsi)~_ _ Type --- ---- -.----. 1 07/19/2007 ! 600 28.27 115,550 4.090 Unbonded Cap Concr~te Compressive Cylinder 6" x 12" 'J 'j ..., .:. 08/09/2007 U8/09/200/ 28 28 ,3 4. 09/06/2007 56 Technir;all: Den'-,y Harris Report Distribution: Dlig: Duke Construction, LP (Dallas, TX) /\ttr /Ar Alex Bennett PE (:€c copy) Rone Engineering See R,port291957 foe '"ho;"," "m'~~ K Scott vVatsQr1,ClET Froject Manago;r ~IM!T."'T!O'J3 Th;> te~;i results Ore3ente:J hGre'n were prepared based upon the specific samples p~OV,dE>d for testing. We ">~L1me r" r,;q::.:n<,;:b:lity br '{~na[ic'n In ~lJ:l1>t1 i.;''''mp)~!i''~':.f iJ~'P€':if"':<,. elC ) 1r an, oiher f~dture of slr:1lfa( ~ubJect mat""r prOlilded by persons or condit,ons over \','i:ld'i WE> hav<c II.:: ,~.:>r"',:.1 OUt 'etters ~nd reports Jre t, ,,' ~hE-' >':':.:'.!':>>', ,O,f'> Vi rr!e r!ic,,'c, i~ .,',;- :rr: :!'o, ~r".' ,jd~'ur,?,j "ne' "':,;, not b", r<:produ':9d exct:pt in fUll w,[hou: the '.vrilten .,ppro,~: ,)f F':vr,~ [,-'gfC,eer1ng SerJioes. Ltj. (:"'G!Le~ P~g" 1 of 1