Loading...
Duke Lesley-LR070625 Rone Engineering .... Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214)630-9745 Report of Concrete Compressive Strength Tes1 Report No.: 287827 Project No.: 0612510 Date of Service: 05/17/2007 Report Date: 06/25/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring sample~ back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Concrete Supplier: LMC Plant: 3 Specification Requirements Strength: 4,200 psi @ 28 days Slump (in.): 4" - 6" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 1701 Placement Date: 05/17/2007 Weather Conditions: Sunny Time Sampled: 03:45pm Temperature - Air: 820F Truck No: 1111 Air Content: NA Overall Placement Location: Curb inlet, V-inlet Batch time: 02:52pm Concrete: 820F Ticket No: 3231077 Unit Weight (pet): NA Measured Slump (inches) 5.0 Sample Location: Station tfs 0+13.25 at Lateral N2, 0+61.96 at Lateral AJ1, 12+83.38 at Lateral N3, V-inlet at station 0+93.01 at Lateral B/1 REPORT OF TESTS . Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type - - 1 1 OS/24/2007 7 6.00 28.27 115,310 4,080 Unbonded Cap 1 2 06/14/2007 28 6.00 28.27 149,160 5,280 Unbonded Cap 1 3 06/14/2007 28 6.00 28.27 143,950 5,090 Unbonded Cap Average 5,180 1 4 07/12/2007 56 Rone Engineering See Report 287727 fo, tech";." timev~ ~ K. Scott Watson, AET Project Manager Technician: Denny Harris Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (JB/LB) Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich. Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Tes1 Report No.: 286857 Project No.: 0612510 Date of Service: 05/07/2007 Report Date: 06/25/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring sample~ back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Concrete Supplier: LMC Plant: 3 Specification Requirements Strength: 4,200 psi @ 28 days Slump (in.): 4.0" - 6.0" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 1701 Placement Date: 05/07/2007 Weather Conditions: Clear Time Sampled: 03:30pm Temperature - Ai.r: 830F Truck No: 975 Air Content: NA Overall Placement Location: Manhole, junction box lid Batch time: Concrete: 880F Ticket No: 3230490 Unit Weight (pct): NA Measured Slump (inches) 5.0 Sample Location: 15+42.48 line B top and 10+07.17; 6' x 6' manhole, line E. REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type - 1 1 05/14/2007 7 6.00 28.27 103,250 3,650 Unbonded Cap 1 2 06/04/2007 28 6.00 28.27 123,330 4,360 Unbonded Cap 1 3 06/04/2007 28 6.00 28.27 128,260 4,540 Unbonded Cap Average 4,450 1 4 07/02/2007 56 Rone Engineering See Report 286791 ro,teclm;ciao time p~ J K. Scott Watson, AET Project Manager Technician: Denny Harris Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-cc copy) LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (JB/lS) Page 1 of 1 Rone Engineering . CHent: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 , "~'. 8908 Arnb<lssador Row, Dall;)s, TX 75241 7701 W Little York, Ste 600, Houston, rX '17040 4421 Frl'.dnch, Sw 195. Au~tin. TX le74~ Corporate Phone: (214) 630-9'145 Report of Concrete Compressive Strength Test Report No.: 288425 Project No.: 0612510 Date of Service: OS/23/2007 Report Date: 06/25/2007 Project: Lesfoy Infrastructure Services; Obtain samples of fresh concrete at tlw placement locations, perform required testing, cast compressive str<ength samples and bring sample, back to the labor2ltory for curing and testing in accordance with applicable standards. Contractor: Concrete Supplier: LMC Plant: 7 Specification Requirements Strength: 4,200 psi @ 28 days Slump (in.): 4" - 6"' .Air (%): NA Test Method: ASTM C-' n. ASTM C-31 (except 10.1.2) ;\STM C-143 ASTM C-231 ASTM C-1064 ASTrvl C 138 P-STM C-39 PROJECT DATA Mix Design 1.0.: 1701 Placement Date: OS/23/2007 Weather Conditions: Sunny Time Sampled: 03:30pm Temperature - Air: 820F Truck No: 7025 Air Content: NA Overall Placement Location: Footing/headwall Batch time: Concrete: 840F Ticket No: 7178527 Unit Weight (pet): NA Measured Slump (inches) 6.0 Sample Location: Stalion 0+4489, line B REPORT OF TESTS Concrete Compr~ssive Cylinder 6" x ~2" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture ---_.."~._. -- _._..,_.~ Set No. Tested -~~~ (in) (in') (Ibs) (psi) Type ------- -- 1 05/30/2007 7 600 28.27 99,860 3,530 Unbonded Cap ! 06/20/200i' 28 6.00 2827 121,290 4,290 Unbonded Cap 3 06/20/2007 28 6.00 28.27 124,450 4,400 Unbonded Cap Average 4,350 1 4 07/18/2007 56 Technici3n: Denny Harns Rone Engineering 6w Roport '88335 ''''eoholol," lime p~ ~ K, Scctt Watson, AET Project f'/anager Report Distribution: r)rig Duk," ConstructIOn, LP (Dallas TX) i',11,~: Mr AI= Bennett PE (1-ec copy) LIM,TATlCt~5' ;he lest resules presented herein '.'/ere prep;JNd based upon the sp<;>citi" ""mp1es provided for testing W@ ,,5sum~ no r~~por,sibl!ity for ",uiation in q""lily ;o:"f1P05'.,.>"', ~ppea'ance. de) or ~ny other feOilure of ,'mllar ~ubJecl maner proviaed by persons or c:ondillons over ,',hich we have no control Our letters and repo;:s are fur ;:" ,.,",~~:' (: US;; of the cliM'.S to whom they ",re a.jdres5o:;d and shall no~ os rsprOduced e~l;ept In full without the '.vntten approval of Rone En;)ineenc9 Services, Ltd :SS'LH' Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas. TX 75254-2936 8908 Ambllsslldor Row, DOlllas, TX 7524f 7701 W Llttlli York, Ste 600. Hou..ton, TX 77041.) 4421 !"rcidrlch, Sta 195, Austin, T)( 7674-1 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Tes1 Report No.: 287546 Project No.: 0612510 Date of Service: 05/15/2007 Report Date: 06/25/2007 Project: Lesley Infrastructure Services: Obta'r samples ot fresh concrete at the placement locations, perform required testing, c.3St compressive stl ength samples and bring sample~ ::;ack to the laboratory for curing and testing in accordance with applicable standards. Contractor: Concrete Supplier: LMC Plant: 6 Specification Requirements Strength: 4,200 pSI @ 28 days Slump (in.): 4" - G" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10 12) ASTM C-143 ASTM C-231 .~STM C-1 064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 1701 Placement Date: 05/15/2007 Weather Conditions: Sunny Time Sampled: 03:00pm Temperature - Air: 830F Truck No: 7006 Air Content: NA Overall Placement Location: Junction box Batch time: 01 :44pm Concrete: 910F Ticket No: 6304834 Unit Weight (pet): NA Measured Slump (inches) 4.0 Sample Location: Line B, Station 11+3785 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength J::racture Set No. Tested (days) _~l~ (in:) (100) (pSI) Type 1 1 OS/22/2007 7 6.00 28.27 82,870 2,930 Unbonded Cap 1 2 06/12/2007 28 G.OO 28.27 118,490 4,190 Unbonded Cap I 1 3 06/12/2007 28 6.00 28.27 119,750 4,240 Un bonded Cap Average 4,210 4 07/10/2007 56 Rone Engineering See Report 287468 for techniCian time ~. ~ ~_ ~ ~ -----_...-~- .- K. Scott Watson, AET PrOject Manager TechnICIan: Denny Harrrs Report DIstribution: Orig: Duk", Construction. LP (Dalia;;, 1X) Attn Mr. Alex Bennett PE (1.ec copy) LiMITATIONS The [",,1 resuits pr~S9r180 ",ere''1.,':e'e p'CO;'sc based ~pon the specific Sdr.-,ples prOVide:! foe testing We ~:;SUr"nE no 'esf>JP,'Olllty for ....~ri~!ion ill qUOlllly \COlT1p~~lt'O,i. appeal"'''x-. ete) or any O!her fesl~re ot ~Imllar suoject matter provided by persons or condition.. over wh,ch we ha.e M oorteo!. Our !elters aM repocts <Ire t,y t~'e exr,'Js,ve use of the clients 10 whom :hey are addressee: ;nd sh,,1I riot be reproducM eXCeot in fvil with1Ut Ih8 written i'lPP'CV3! of ><or~ E'1g:'leerlng SerJi,..8S, Ltd, :~;E'i IS' Page 1 of 1