Loading...
Duke Lesley-LR070615 (2) Project: Lesley Infrastructure Services: Obtain samples of fres/l concrete at the placernenllocatfons, perform required testfng, cast compressive strength samples and bring sample~ back to the laboratory for curing and testing in accordance with applicable standards PROJECT DATA Mix Design J.D.: 342M1504 Placement Date: 04/09/2007 Weather Conditions: Clear Time Sampled: 02:00pm Temperature - Air: 58 of Truck No: 1031 Air Content: NA Overall Placement Location: Junction box footing AJG. 2-, 20.:;7 ~ ~ :(:6AV Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Contractor: Concrete Supplier: Redi-Mix Plant: 136 Specification Requirements Strength: 4,200 psi @ 28 days Slump (in.): 3.0" - 6.0" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 \C. :;: 3; r I) 8908 Ambassador Row, Dallas, rx 75247 7701 W Little York. Ste 600. Houston, TX 77043 4421 I=reidrich, Ste 19S. A\lstin. TX 78744 Corporate Phone: (214) 6J0--9745 Report of Concrete Compressive Strength Tes1 Report No.: 284202 Project No.: 0612510 Date of Service: 04/09/2007 Report Date: 06/15/2007 Batch time: 12:41 pm Concrete: 640F Ticket No: 13684466 Unit Weight (pet): NA Measured Slump (inches) 4.0 Sample Location: "Une E" - Station # O+OD; "Line 8" - Station #'s 12+93.72. 11 +37.85, 8+50 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (lbs) (pSi) Type 1 1 04/16/2007 7 6.00 28.27 135,150 4,780 Unbonded Cap 1 2 05/07/2007 28 6.00 28.27 172,310 6,090 Unbonded Cap 1 3 05/07/2007 28 6.00 28.27 173,390 6,130 Unbanded Cap Average 6,110 4 HOLD Technician: Denny Harris Report Distribution: Orig Duke Constn.Jction, LP (D;;.;flas, TX) ANn Mr Alex 6ennett PE (1-cc copy) Started: 0130pm Firlished: 03;OOpm Rone Engineering P-~~ K. Scott Watson, AET Project Manager llMJr A TIONS, The test re~ults pres~nted herein were pre~red ba~eo' upon :he speCific samples piOVided for testing. We assume no responsibility for verialion In Cjuality {compoSitio1, sppearancs. at!;.) or an)' other fe",ture of similar Subject matter provided by persons or eonoitions over which we have no o:In(rol. Our letters and reports are ~t :he exclUSive use of the clients to whom they are addressed an:;! shall not be reproduced except itl full without the ',witter, appro"al 01 Rone Engineering Servlcas, ltd. (lB/KG) Page 1 of 1 Project: Lesley Infrastructure Services: Obtain samples oUrash concrete <It thl? placement locations. perform required testing, cast compressive strength samples and bring s~mple~ back to the laboratory for curing and testing in accordance with applicable standards PROJECT DATA Mix Design I.D.: 345M1501 Placement Date: 04/11/2007 Weather Conditions: Sunny Time Sampled: 02:30pm Temperature - Air: 770F Truck No: 1321 Air Content: NA Overall Placement Location: Junction box footing I walls '-" j r- .. L L Ran.e Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Contractor: Concrete Supplier: Redi-Mrx Plant: 136 Specification Requirements Strength: 4,200 psi @ 28 days Slump (in.): 4.0" - 6.0" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 ',r-' .' ^ ~ \ 'w:' '. ~ 8908 Ambassador Ro.... Dallas, TX 75247 7701 W little York, Stc 600, Houston. TX 77040 4421 f'reidric:h. Ste 1!l!i, Austill, TX 78744 Corporate Phone: (214) 630.9745 Report of Concrete Compressive Strength Tes1 Report No.: 284532 Project No.: 0612510 Date of Service: 04/11/2007 Report Date: 06/15/2007 Batch time: 01 :40pm Concrete: 750F Ticket No: 13684725 Unit Weight (pet); NA Measured Slump (inches) 5.0 Sample Location: Line E / 0+00 (walls); Line B I station # 8+40 (bottom) REPORT OF TESTS Concrete Compressive Cylinder 6" X 12" Cylinder Maximum Compressive Marked Date Age Diameter Area load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 04/18/2007 7 6.00 28.27 130,640 4,620 Unbonded Cap 1 2 05/09/2007 28 6.00 28.27 162,020 5,730 Unbonded Cap 1 3 05/09/2007 28 6.00 28.27 159,690 5,650 Unbonded Cap Average 5,690 1 4 HOLD Remarks: Water Added at Site: 10 gallons lechnician: Denny Harris Report Distribution: Orig' Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Sennett PE (1-cc copy) Started: 0200pm Finished: 03:45pm Rone Engineering ~~_J K. Scott Watson, AET Project Manager W..liT'HIONS. TM ~e9t results present.-d hemin were prepared based upOn the specific ~amples provided for testing. We assume no respon,>ibility for variation In quality (<.Xlm~s'tlon, appearance, etc.) or any other feature of similOlr subject matter provided by persons 0; ~nd]t.'on!> over whiCh we have no control. Our letters and reports are t0r tM i;'XclU5IVe use Of the clients to whom they are addressed and Shall not be reproduced except in full witho,,! th~ written approval of Ror,e Engineering Services. Ltd. (lB/KG) Page 1 of 1