Loading...
Duke Lesley-LR070525 (3) ~~G. 2:~. 2887 ~ ~ : (:~AV Client: Duke Construction, LP 14241 DaHas Pkwy, Ste 1000 Darlas, TX 75254-2936 ~" n ~:. ~ i \\J. '; J I .,. 8908 AmbllSSador Row, Dalla.s. TX 75247 7701 W LIttiG York, Stet 600, Houston, TX 77040 4421 Freldrieh. 5te 195. Austin, TX 78744 Corporate Phone: (214) 630.9745 Report of Concrete Compressive Strength Tes1 Report No.: 283981 Project No.: 0612510 Date of Service: 04/06/2007 Report Date: OS/25/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations. perform required testing, cast compressive strength samples and bril1g sampre~ baclo; to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier; Custom Crete Plant: Dallas Specification Requirements Strength; 3,000 psi @ 28 days Slump (in.): 6.0" Air (%): 4.5% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: TX 10753A Placement Date: 04/06/2007 Weather Conditions: Cloudy/Cool Time Sampled: 1 0:30am Bat~h time: Temperature - Air: 560F Concrete: 720F Truck No; 397 TicKet No: 361758 Air Content: 4.8%) Unit Weight (pet): NA Overall Placement location: Manhole - Slab at station 0+00 at sanitary sewer #1 Measured Slump (inches) 62 Sample location: Same as above REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture - Set No. Tested (day!>, (in) (in') (lbS) (psi) Type 1 1 04/09/2007 3 6.00 28.27 161,630 5,720 Unbonded Cap I 2 04/13/2007 l 6.00 28.27 184,770 ~o ~nbonded Cap ~j 05/04/2007 28 6.00 28.27 214,050 7,570 Unbonded Cap 1 4 HOLD Bltl ,~~ LIMITATiONS: Th!; test resufts presented herein were prepared bastd upon the ISpecific lIarnples provided for testing, We assume no responEibrhty for variation ill quality :comPOsltl,ii'l. "pre~rsnce, ~t:.) or any other feature of lSirrilar subject matter provided by persons or conditions over which we hav~ no <;:/;lntrol Our r~tters and reports are ~o' t:le ,excJu.,ve u;?e of tile clients to whom they a~ addressed and shaH not be reproduced exeept in full without the written approval 0' Rone En~iMering Services, Ltd l\.8IKG! P:lge 1 of:2 6, '.' .'.~. 2:. 2 i. :: 7 ~. :i S t. \l~ '. ''-'. ,. I ~ ......J . .J Rone Engineering . 8906 Ambas'iador Row, Dallas, TX 75Z47 7701 W Little York, StG 600. HOuston, LX 7704lJ 44~1 Frerc:irieh, S~C 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Concrete Compressive Strength Test Report No.: 283981 Project No,: 0612510 Date of Service: 04/06/2007 Report Date: OS/25/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring sample~ back to the laboratory for curing and testing in aCCOrdance with applicable standards. Remarks: Note: Batched on Site Note: Keith Flower GC-Duke Construction wants the three day break results phoned directly to him at 214-878-6115 TechnIcian: David Best Report Distribution: Ori9 Duke Construction, lP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-cc COpy') Started: 0830am FiniShed: 12;OOpm Rone Engineering P-~~ K. Scott Watson, AET Project Manager I ,MirA TiONS The !e!>t reSult~ presented here!~ were .o~pared bas~ upon the specific samples provided for testing. We aSSume no re$pOtIS1billty for van~tiorl In auallty (compOSition. appearoll'1ce. B1c l or anI' ol,'1er feature of Similar subject matter Provid~d by pet50ns or ooncMions over which we have no control Our le~ers and reports are ler the B""clus,vd uSe Of the Clrel1ts to whom tl1ey a~ ao'd~ssed and Shalf not be reproduced except il1 full without the wriUel1 apProval Of Ronl! Engint~ering Se'\Iices. ltd. (L.B/KG) Pago 2 of 2