Loading...
Duke Lesley-LR070514 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214)630-9745 Report of Concrete Compressive Strength Test Report No.: 284815 Project No.: 0612510 Date of Service: 04/13/2007 Report Date: 05/14/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring sampleE back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Concrete Supplier: Lattimore Materials Plant: 7 Specification Requirements Strength: 4,200 psi @ 28 days Slump (in.): 4"-6" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 1851 Placement Date: 04/13/2007 Weather Conditions: Cloudy Time Sampled: 02:15pm Temperature - Air: 690F Truck No: 997 Air Content: NA Overall Placement Location: Curb Inlet Batch time: 01 :26pm Concrete: 740F Ticket No: 7177462 Unit Weight (pet): NA Measured Slump (inches) 5.0 Sample Location: Station # 20+44 Line S, Station # 25+45 east REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 04/20/2007 7 6.00 28.27 113,850 4,030 Unbonded Cap 1 2 05/11/2007 28 6.00 28.27 143,130 5,060 Unbonded Cap 1 3 05/11/2007 28 6.00 28.27 138,640 4,900 Unbonded Cap Average 4,980 1 4 HOLD Remarks: Water Added at Site: 10 gallons Technician: Denny Harris Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) Started: 01 :45pm Finished: 03:30pm Rone Engineering p~-~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (JB/KW) Page 1 of 1 , i Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 . /. 6908 Ambassador Row. Callas, rx 7524i~ 7701 W Little York, Stc 600, Houston, TX 77040 4421 Frnidrich, Ste 195, Austin, TX 7B744 Corpol'lltQ Phone; (214) 630.9745 Report of Concrete Compressive Strength Tes1 Report No.: 286285 Project No.: 0612510 Date of Service: 04/30/2007 Report Date: 05/14/2007 Project: Lesley Infrastructure Services: Obtain samples or fresh concrete at the placement locations, perfonn required testing, cast compnOl~sive strength samples and bring sample~ back to the l!lboratory fOf cUring and testing In accordance with applicable standards PROJECT DATA Contractor: Concrete Supplier: Lattimore Plant: 03 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): NA Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 1701 Placement Date: 04/30/2007 Weather Conditions: Warm, cloudy Time Sampled: 01 :12pm Batch time: Temperature - Air: 780F Concrete: 780P Truck No: 1124 Ticket No: 3230173 Air Content: 40% Unit Weight (pet): NA Overall Placement Location: Junction Sox Walls Measured Slump (inches) 4.0 Sample Location: Station 0+00, Line C REPORT OF TESTS ..~-~.~----------_.. Concrete Compressive Cylinder 6" X 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested _~~ys) __ (in) (in') (Ibs) (psi) Type 1 1 05/07/2007 ... 600 28.27 114,050 4,030 Un bonded Cap l 1 2 OS/28/2007 28 6.00 2827 148,090 5,240 Unbonded Cap 1 3 OS/28/2007 28 6.00 26.27 143,280 0,070 Unbonded Cap Average 5,150 4 06/25/2007 56 Remarks; Water Added at Site 5-10 gallons Technician: Gerry Graham Report Distribution: Orig Duke Construction. LP (Dallas. TX) Altli: Mr Alex Bennett PE (1-ec copy) Slartl;'d: 1030am Finished: 02:00pm Rone Engineering ~~-J K. Scott Watson, AET Project Manager l: MilA IICtJS T h", (';51 results presented herein w.;re prepare<:! based upon :he ~paClfic samples provided for testing We assume no respor"iCllity for v<lrialion in Duality (,;omposltlvl'l. appearance, et~.) or any other faalu,e of ",i'TlIlar subject mafter provided by persons or conoltions over which we ha~e no CGntrol Our letters and reports a~e 'or Ir.e exclJsive lJse of the clienls 10 wl10m :hey :3~e addressed and shall not be rapr'Odueed eXCi;'ol in fullwilhout t:1<< w~itter-l appro'.'a! of Rorce Engineering Services. Ltd (JE/n'vI Page 1 of 1 I~, . ", . -: ~. L'_ '. :~ ,-, ~. ~ i .'-\ "-" ",., . '. .J ,"\ 'j Rone Engineering . 8908 Amhas,.~dor Row, Dallas. TX 75Z47 7701 W L.rttlc YOrk, Ste 600. Houston, TX 77040 4421 Frcidrich, Ste 195, Austin, TX 78744 Corpor~te Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Concrete Compressive Strength Tes1 Report No.: 286114 Project No.: 0612510 Date of Service: 04/27/2007 Report Date: 05/14/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform requin~d testing, cast compressive strength samples and bring sample, back to the laboratory for curing and testing in accordance with applicable standards PROJECT DATA Contractor: Concrete Supplier: LMC Plant; 3 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3"-5" Air (%): 3-6% Test Method: ASTM C.'l72 ASTM C-31 (except 10.12) ASTM C-143 ASTM C-231 ASTM C.1 064 ASTM C.138 ASTM C-39 Mix Design 1.0.: 1701 Placement Date: 04/27/2007 Weather Conditions: Partly cloudy, warm Time Sampled: 03:33pm Batch time: 01 :59pm Temperature - Air: 760F Concrete: 780F Truck No: 966 Ticket No: 3230097 Air Content: 2.2% Unit Weight (pef): NA Overall Placement Location: Junction Box Measured Slump (inches) 3.5 Sample Location: Station 12+93.72 line B northeast corner of wall. REPORT OF TESTS _._--_.."--~--- Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength F ractu re Set No. Tested (days) (in) (in') (Ibs) (psi) Type .---- 1 1 05/04/2007 T 6.00 28.27 109,190 3,860 Un bonded Cap 1 2 OS/25/2007 28 6.00 28.27 141,520 5,010 Un bonded Cap 1 ., OS/25/2007 28 6.00 28.27 135,800 4,800 Un bonded Cap J Average 4,900 1 4 06/22/2007 56 Technician: VVilJi<Jm Porter Report Distribution: OriQ: Duke CGnstruction, L.P (Dallas, TX) AtM, !vir Alex Bennett PE (1-0:; copy) Started: 0130pm Finished: 04:30pm Rone Engineering P-akP~ K. Scott Watson, An Project Manager UMITA TIONS The test results pres€nwrJ herein were prepared based u;lon the Spe<;:iflc samples provided for testing. We ~ssvme no responslbilfty for v"riallon in qU'3llty (cc,mposlt/on, 8PP8arence. etc) or any otner feature of Similar subject m:;ltter provided oy persons or conditions over whleh we have no eont"ol Our 1(lltGrS and reports are h.' the exc:us.ve use of In" Clients to whom they are 3ddressed 8M shall nor be reproduced except in full w,:hout the W.:t:en approval of Ror;", Engineering Servl::es. ltd. ,'/<V/!;..,w} Pago 1 of 1