Loading...
Coppell CC 1R2-CS070830 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: CODDell Commerce Center. Phase I. Block 1 R2. Site Plan, to allow the development of a fourth office warehouse building, containing 37,800 square-feet on 18.92 acres of property, located along the west side of Hammond Drive, 400 feet south of Bethel Road, at the request of Lincoln Property Company, being represented by Trey Braswell, Kimley- Horn and Associates, Inc. STAFF REP.: Matt Steer PROJECT 10# SPA-07-0068 DRC DATE: August 30,2007 and September 6, 2007 CONTACT: Kenneth M. Griffin, P.E., Dir.of EnJ!ineerinJ!/Public Works 972/304-3686 COMMENT STATUS: '/PRELIMINARY Flf\.TAL REVISED fL"C.TER P&Z 1. The paving section should have a minimum compressive strength of 3600 psi. 2. Is the existing water line private? If so, the proposed water line should be private and include a vault with a double detector check in an easement. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: CODDell Commerce Center. Phase I. Block 1 R2. ReDial. being a replat of Block 1 R of the Coppell Commerce Center Phase I, to establish fire lanes and easements to allow for the fourth office warehouse on 18.92 acres of property, located along the west side of Hammond Drive, 400 feet south of Bethel Road, at the request of Lincoln Property Company, being represented by Trey Braswell, Kimley-Horn and Associates, Inc. STAFF REP.: Matt Steer PROJECT 10# RP-07 -0069 DRC DA TE: August 30, 2007 and September 6, 2007 CONTACT: Kenneth M. Griffin, P.E., Dir.of Engineerim!lPublic Works 972/304-3686 COMMENT STATUS: '/PRELIMINARY FINAL REVISED ~1FTER P&Z 1. If the water line is private, no easements are necessary for the fire hydrants and meters. 2. A 20' X 20' easement will be required for the vault.