Loading...
Duke Lesley-LR070816 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of In-Place Density Testing Report No.: 294334 Project No.: 0612510 Date of Service: 08/0212007 Report Date: 08/16/2007 Project: Lesley Infrastructure Services: Perform In-Place Density Testing PROJECT DATA Contractor: Test Method: ASTM 0-2922 ASTM 0-3017 Gauge: Troxler 3430 Gauge Serial No: 35518 Test Mode: DT Standard Counts Moisture Density Current: 734 Current: 2527 Previous: 732 Previous: 2523 MOISTURE DENSITY RELATIONS 34.4 30.3 22.5 Maximum Density (pet) 82.2 88.4 96.5 Project Requirements Moisture Density Optimum +4 95 min Optimum +4 95 min Optimum +4 95 min MID No. 293844 293899 272998 Description Lime Treated Medium Brown / Sandy Clay Lime Treated Brown I Sandy Clay Brown I Silty Clay wI Organics Moisture % FIELD DENSITY TESTS Test Probe MID Moisture Wet Density Dry Density Density No Test Location Depth No. % (pef) (pet) (% max) Paving subgrade Dividend westbound lane, Station 15+00 6" 293844 37.9 109.9 79.7 97 Paving subgrade 2 Dividend westbound lane I Station 18+00 6" 293844 36.2 109.9 80.7 98 Paving subgrade 3 Dividend westbound lane, Station 21 +00 6" 293844 37.2 109.9 80.1 97 Paving s.ubgrade 4 Dividend westbound lane, Station 24+00 6" 293844 35.9 109.8 80.8 98 Paving subgrade 5 Dividend westbound lane, Station 27+00 6" 293899 32.5 115.0 86.8 98 Paving subgrade 6 Dividend westbound lane, Station 30+00 6" 293899 30.6 115.3 88.3 100 Paving subgrade 7 Dividend westbound lane, Station 33+00 6" 293899 32.1 114.4 86.6 98 LIMITATIONS: The test results presented herein were prepared based upon the specifIC samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMlKW) Page 1 of 4 Rone Engineering 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 . Corporate Phone: (214) 630-9745 Report of In-Place Density Testing Client: Duke Construction, LP Report No.: 294334 14241 Dallas Pkwy, Ste 1000 Project No.: 0612510 Dallas, TX 75254-2936 Date of Service: 08/0212007 Report Date: 08/16/2007 Project: Lesley Infrastructure Services: Perform In-Place Density Testing FIELD DENSITY TESTS Test Probe MID Moisture Wet Density Dry Density Density No Test Location Depth No. % (pet) (pet) (% maxI Paving subgrade 8 Dividend westbound lane, Station 36+00 6" 293899 32.9 114.8 86.4 98 Paving subgrade 9 Dividend westbound lane, Station 39+00 6" 293899 32.6 114.6 86.4 98 Paving subgrade 10 Dividend westbound lane, 42+00 6" 293899 31.5 115.2 87.6 99 Paving subgrade 11 Dividend westbound lane, 45+00 6" 293899 33.3 113.7 85.3 97 Paving subgrade 12 Dividend westbound lane, 48+00 6" 293899 31.9 113.8 86.3 98 Paving subgrade 13 Point West, Station 1 +00 6" 293899 32.9 114.7 86.3 98 Paving subgrade 14 Point West, Station 4+00 6" 293899 33.4 115.7 86.7 98 Paving subgrade 15 Point West, Station 7+00 6" 293899 32.4 114.9 86.8 98 Paving subgrade 16 Point West, Station 10+00 6" 293899 32.6 114.4 86.3 98 Paving subgrade 17 Point West, Station 13+00 6" 293899 33.4 114.7 86.0 97 Paving subgrade 18 Southbound tum lane, 60' from north end 6" 293899 33.3 114.5 85.9 97 Paving subgrade 19 Southbound tum lane, 60' from north end 6" 293899 31.9 114.2 86.6 98 Paving subgrade 20 Northbound turn lane, 60' from north end 6" 293899 32.3 115.0 86.9 98 Paving subgrade 21 Northbound tum lane, 60' from south end 6" 293899 31.5 114.9 87.4 99 Utility back fill 22 Gas and electric, Station 13+05, 2' below grade 6" 272998 22.6 116.6 95.1 99 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMfKW) Page 2 of 4 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of In-Place Density Testing Report No.: 294334 Project No.: 0612510 Date of Service: 08/0212007 Report Date: 08/16/2007 Project: Lesley Infrastructure Services: Perform In-Place Density Testing FIELD DENSITY TESTS Test Probe MID Moisture Wet Density Dry Density Density No Test Location Depth No. % (pet) (pet) (%max) Utility back fill 23 Gas and electric, Station 13+05, final 6" 272998 24.1 116.4 93.8 97 Utility back fill 24 Gas and electric, Station 10+50,2' below grade 6" 272998 23.7 116.3 94.0 97 Utility back fill 25 Gas and electric, Station 10+50, final 6" 272998 22.9 116.4 94.7 98 Utility back fill 26 Gas and electric, Station 7+50, 2' below grade 6" 272998 23.0 117.5 95.5 99 Utility back fill 27 Gas and electric, Station 7+50, final 6" 272998 23.1 117.1 95.1 99 Utility back fill 28 Gas and electric, Station 4+50, 2' below grade 6" 272998 23.7 116.8 94.4 98 Utility back fill 29 Gas and electric, Station 4+50, final 6" 272998 23.7 116.3 94.0 97 Utility back fill 30 Gas and electric, Station 1 +50,2' below grade 6" 272998 23.9 116.6 94.1 98 Utility back fill 31 Gas and electric, Station 1 +50, final 6" 272998 24.9 116.8 93.5 97 Utility back fill 32 Electric crossing, Station 2+75, 2' below grade 6" 272998 24.2 116.4 93.7 97 Utility back fill 33 Electric crossing, Station 2+75, final 6" 272998 24.8 115.3 92.4 96 Utility back fill 34 Irrigation sleeves, Station 17+50, 2' below 6" 272998 25.5 115.8 92.3 96 grade Utility back fill 35 Irrigation sleeves, Station 17+50, final 6" 272998 22.8 115.7 94.2 98 Utility back fill 36 Irrigation sleeves, Station 14+00, 2' below 6" 272998 24.7 115.2 92.4 96 grade LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMlKW) Page 3 of 4 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of In-Place Density Testing Report No.: 294334 Project No.: 0612510 Date of Service: 08/02/2007 Report Date: 08/16/2007 Project: Lesley Infrastructure Services: Perform In-Place Density Testing FIELD DENSITY TESTS Test Probe MID Moisture Wet Density Dry Density Density No Test Location Depth No. % (pet) (pct) (%max) Utility back fill 37 Irrigation sleeves, Station 14+00, final 6" 272998 24.1 114.8 92.5 96 Utility back fill 38 Irrigation sleeves, Station 11 +00, 2' below 6" 272998 24.8 115.2 92.3 96 grade Utility back fill 39 Irrigation sleeves, Station 11+00, final 6" 272998 26.0 115.2 91.4 95 Technician: Joe Jernigan Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Started: 07:15am Finished: 03:15pm Rone Engineering Vad~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 4 of 4 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Concrete Compressive Strength Tes1 Report No.: 292493 Project No.: 0612510 Date of Service: 07/17/2007 Report Date: 08/16/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Mix Design I.D.: 1701 Placement Date: 07/17/2007 Weather Conditions: Hot, clear Time Sampled: 03:40pm Temperature - Air: 1020F Truck No: 1111 Air Content: NA Overall Placement Location: Y Inlet, Station 0+38.04 Batch time: 02:43pm Concrete: 980F Ticket No: 3233497 Unit Weight (pet): NA Measured Slump (inches) 4.5 Contractor: Concrete Supplier: LMC Plant: 3 Specification Requirements Strength: 4,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Sample Location: Station 0+38.04 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 07/24/2007 7 6.00 28.27 96,350 3,410 Unbonded Cap 1 2 08/14/2007 28 6.00 28.27 122,590 4,340 Unbonded Cap 1 3 08/14/2007 28 6.00 28.27 130,580 4,620 Unbonded Cap Average 4,480 1 4 09/11/2007 56 Technician: Cedric Derrett Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Started: 01 :45pm Finished: 04:45pm Rone Engineering p~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/KW) Page 1 of 1