Loading...
Duke Lesley 3C-LR070816 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-29V Project: Point West Office', Lo -t 3 B / oc I:: C Services: Perform In-Place Density Testing Report of In-Place Density Testing Report No.: 294347 Project No.: 0711530 Date of Service: 08/02/2007 Report Date: 08/16/2007 PROJECT DATA Contractor: Test Method: ASTM 0-2922 ASTM D-3017 Gauge: Troxler 3430 Gauge Serial No: 35518 Test Mode: DT Standard Counts Moisture Density Current: 734 Current: 2527 Previous: 732 Previous: 2523 MOISTURE DENSITY RELATIONS MID No. 272998 Description Brown I Silty Clay wi Organics Moisture % Maximum Density (pet) 96.5 Project Requirements Moisture Density Optimum +4 95 min 22.5 FIELD DENSITY TESTS Test Probe MID Moisture Wet Density Dry Density Density No Test Location Depth No. % (pet) (pet) (maxi Utility backfill Storm drain 0-2, Station 1+00,2' below grade 6" 272998 25.2 115.4 92.2 96 . Utility backfill 2 Storm drain 0-2, Station 1 +00, final 6" 272998 25.3 114.8 Utility backfill 3 Storm drain 0-2, Station 4+00, 2' below grade 6" 272998 22.9 117.1 Utility backfill 4 Storm drain 0-2, Station 4+00, final 6" 272998 24.1 117.3 Technician: Joe Jernigan Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Brian Pierce (1-cc copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis 11 / ~~d' 02:30pm Finished: ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the dients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMlKW) Page 1 of 1