Bethel BP-CS070829
THE.CITY.OF
corrELL
August 29, 2007
Daniel M. Goodwin, P.E.
Goodwin & Marshall Inc.
2405 Mustang Drive
Grapevine, TX 7605]
RE: Bethel Business ParklCreekview Drive
Construction Plan Review Comments (2nd Review)
Dear Mr. Goodwin:
The City of Coppell has reviewed the revised plans for the referenced addition and they have been
approved.
The City of Coppell requires three sets of final construction plans for its use; your office should submit as
many additional sets for stamping as is necessary for construction operations. All contractors and
subcontractors on site must have a copy of the plans approved by the City of Coppell along with a copy of
the City's standard construction details.
All fees must be paid prior to release of this project for construction. The City charges a 2% inspection
fee for all private construction outside the building's footprint. This includes dirt work, paving, storm
drains, water lines, sewer lines, drainage pipes, etc. that are private. For all installations in the public
right-of-way or easement, the City charges a 4% fee. A check for inspection fees made to the City of
Coppell should be submitted to this office along with the Construction Development Permit Application
and a copy of the Construction Site Notice. For your convenience a spreadsheet is attached to the permit
application for use in calculating the inspection fees. A copy of the contract(s) should be attached for
verification purposes. If you have any questions, please contact me at your convenience.
~~f
Michael Garza, E.I.T ~
Graduate Engineer
Office Phone: (972) 304-3679
Fax: (972) 304-73570
E-mail mgarza@ci.coppell.tx.us
255 PARKWAY * P,Q.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673