Loading...
Duke Lesley-LR070724 L L ;; .~, 'J Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 . .'-'. . J 6906 Amt>assador Ro....., Dallas, TX 75247 7701 W Uttlt;: York, Ste 600, Houston, TX 77040 4421 F=reidrlch. Stg 195, Austin, TX 787JA Corporate PhOM: (214) 630.9745 Report of Concrete Compressive Strength Tes1 Report No.: 291053 Project No.: 0612510 Date of Service: 06/25/2007 Report Date: 07/24/2007 Project: Lesley Infrastructure Services: Qbt<wl samples of fresh concro:te at the placement locations, perform required testing, cast compressive strength samples and brrng samples back te the laboratory fer cunng and testing In accordance with applicable standards. Contractor: Concrete Supplier; LMC Plant: 7 Specification Requirements strength; 4,200 psi @ 28 days Slump (in.): 4" - 6" Air (%): NA Test MethOd: ASH/! C-172 ASTM C~31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 1701 Placement Date: 06/25/2007 Weather Conditions; Cloudy Time Sampled: 11 :15am Temperature - Air: 800F Truck No: 1093 Air Content: NA Overall Placement Location: Junction box walls Batch time: 10: 16am Concrete: 920F Ticket No: 7179439 Unit Weight (pet): NA Measured Slump (inches) 4.0 Sample Location: Line F, Station 0+46 76 REPORT OF TESTS ....~--_._----~.~ ~..- Concrete Compressive Cylinder 6" X 12" Cylinder Maximum Compressive ~l!1al1ed__ Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type _.,-.~ 1 1 07/02/2007 7 6.00 2827 106,460 3,770 Unoonded Cap 1 2 07/23/2007 28 6.00 28.27 144,490 5,110 Unbonded Cap 1 3 07/23/2007 28 600 2827 134,050 4,740 Unbonded Cap Average 4,930 4 08/20/2007 56 Remarks: Water added at site: 15 gallons Technjciiln: De"ln, Harris Rone Engineering See R.pcrt2.09BS ''''technici., tim'p-~ K Scott Watson, l~ET Project Manager Report Dlstnbution: Orig Duk.e COr'\5truction, LP (Dallas, TX) AlII' '~lIA.ie.x 5er.r1'~n PE: (lee co;:;y) L1MIl P.TiONS The lase results P~:';Mted herein were prep~red based upon (he specific samples provided for testing. We assume no n;:~pon310IlJ~y for vanatlon In quality (comp-c~:k),-" appear,m.:e. ele.) or any oth8r f",..Iure of simller ~LJbJect matter prov.de<:J by persons or conditions over wh'ch we ha,'1' no con~r,)I, Our leHers :!Ind reports il:e '0' th" ",xd'_>:"',;,~S8 ,.,~ the i;:1:ents t,~ whom they are ilddre5s.;'d .~nrj Sh311 I'1ot be reproduCGCl e)(eep: In full wlthoullhe ....,ittt'n approval of Ro"e Engineering Servi~s LId f' FJif\\V) Page 1 of 1 - .-, '~,' Rone Engineering . Client Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX. 75254-2936 . t\ 5908 Ambassador Row, Dallas, iX 75247 7701 W Llttl(> York, Ste 600, Houston. TX 77040 4421 Freldrlch, Ste 195, Austin, TX 78744 COrpOflltC Phone: (214) 630.9745 Report of Concrete Compressive Strength Tes1 Report No.: 290641 Project No.: 0612510 Date of Service: 06/20/2007 Report Date: 07/24/2007 Project: Lesley Infrastructure Services: Obtain sampi8s of fresh concrete at the placement locations, perform r<i!quired testing. ca.st compressive strength samples ..no bring samplo:o back to the laboratorf for CUring and testing in accordance with applicable standards PROJECT DATA Concrete Compressive Cyhnder 6" x 12" Maximum Load (Ibs) 112,690 Contractor: Concrf'te Supplier: LMC Plant: 7 Specification Requirements Strength: 4,200 psi @ 28 days Slump (in.): 3" - 5" Air (%): 3%, - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 f\STM C-138 ASTM C-39 _'_'~__'_.___"'__."______"_'_~.....oo...oOo-___ Cylinder Marked Date Age .._----------~ Set No. Tested (days) -.- -- 1 1 06/27/2007 7 , 2 07/18/2007 28 i .\ 3 07/18/2007 28 I 1 4 08/15/2007 56 Diameter (in) 600 Remarks: Water added at site: 5 gallons Mix: Design 1.0.: 1701 Placement Date: 06/20/2007 Weather Conditions; Cloudy Time Sampled: 04:05pm Temperature - Air: 910F Truck No: 7024 Air Content: 3.2% Overall Placement Location: Junction box, Ime F, Station 10+5250 Sample Location: Same as above REPORT OF TESTS Area (in') 28.27 6.00 600 28.27 28.27 147,960 145,400 Average Batch time: 02:58pm Concrete: 930F Ticket No: 7179307 Unit Weight (pet); NA Measured Slump (inches) 2.75 Compressive Strength (psi) 3,990 Fracture Type Unbonded Cap 5,230 5,140 5,190 Unbonded Cap Un bonded Cap Technician: Danny Howard Report Distribution: Orig Duke Construction. LP (Dallas, TX) Attn Mr Alex Flennert PC (1-ec copy) Started: 02:00pm Finlsh8d: 05:30pm Rone Engineering P-~~ K Scott 'Natson AET Project Manager U~iIIT A '!'il'JN,s. The test results pre~et.tM herein ',yer.. prep~rM baSed upell" the specific samples provl:Jed for testing. We "SSl,Jme no resDonSlbliHy for ....anation in qu~l1ly (wrripuSili(.Jn, ap;;>eaT':9n:;e, etc.) or any other fealure of Similar subject maner provided by person~ or cor,dition~ over which we h~','e no ::aMral Our !ellers 3nd reports ~J~2 for the exdu51ve use of the clients to whom thei are 3ddressed an:J shall no~ be reproduced excepllfl fvll wilhou: the wTltten approval of Rone Eng'Mllring S..r,-ices. LId (S:;/K.V'/) P<lg!l1 of 1