Gateway BP(3.1)-LR070817
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Transwestern Commercial Services
5001 Spring Valley
Dallas, TX 75244
Report of Reinforcing Steel Inspection
Report No.: 295446
Project No.: 0712786
Date of Service: 08/13/2007
Report Date: 08/17/2007
Project: Gateway Business Center
Coppell, Texas
Services: Reinforcing Steel Inspection
Report of Inspection
Locations and Items Inspected:
Steel for paving in area G
ltem s Inspected: Conform ing Non Item s Inspected" Co nfo rm ing Non nem s Inspected Conforming Non
Conforming Conforming Conforming
P lacing Drawings Bar Length Column Ties Properly
Approved x and Shape x Tied and Spaced NA
Bar Size x Pro per B ar Placement x Stirrup Spacing NA
Bar Grade x Pro perly Tied x Stirrup Type NA
Bars Clean x Dowel Bars In Place x Lapped Splices x
Form Clean x Pro per B ar Supports x Corner Bars NA
Numberof Bars x Proper Cover x Mechanical Splices NA
Discrepancies I Comments:
No apparent discrepancies were noted at the locations listed above.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd
(TM/KW) Page 1 of 3
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Transwestern Commercial Services
5001 Spring Valley
Dallas, TX 75244
Report of Reinforcing Steel Inspection
Report No.: 295446
Project No.: 0712786
Date of Service: 08/13/2007
Report Date: 08/17/2007
Project: Gateway Business Center
Coppell, Texas
Services: Reinforcing Steel Inspection
Locations and Items Inspected:
Grade beam steel, building 1, grid lines 7.5/E-10/E and building 2, steel
for grade beam, grid lines 6.5/E-9.8/E
ttems Inspected Conform ing Non Item s Inspected: Co nfo rm ing Non Items Inspected' Conforming Non
Conforming Conforming Conforming
Placing Drawings Bar Length Column Ties Properly
Approved x and Shape x Tied and Spaced NA
Bar Size x Proper B ar Placement x Stirrup Spacing NA
Bar Grade x Properly Tied x Stirrup Type NA
Bars Clean x Dowel Bars in Place x Lapped Splices x
Form Clean x Pro per B ar Suppo rts x Corner Bars x
Numberof Bars x Proper Cover x Mechanical Splices NA
Discrepancies / Comments:
1. Steel not tied properly or loose in 2 areas.
Discrepancies noted above were corrected prior to concrete placement.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TMfKW) Page 2 of 3
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Transwestern Commercial Services
5001 Spring Valley
Dallas, TX 75244
Report of Structural Steel Inspection
Report No.: 606694
Project No.: 0712786
Date of Service: 08/13/2007
Report Date: 08/17/2007
Project: Gateway Business Center
Coppell, Texas
Services: Structural Steel Inspection
Report of Inspection
Service: Perform Structural Steel Inspection as detailed below:
Drawings Utilized: Structural
Locations and Items Inspected: Building 1, bar joist, girder to column and girder to tilt wall panel pocket weld
verification, grid lines 1-19/A-E
Discrepancies / Comments:
The following discrepancies were noted:
1. Joist welds missing at various locations.
2. Girder to column not welded.
3. Girder to tilt wall panel pocket welds missing.
4. Perimeter angle not welded at all required locations.
Notes:
1. Need RFI documentation for torch cutting and oversize bolt holes.
2. Slag needs to be removed on torch cut bolt holes prior to bolt installation.
3. Bolts not tensioned in roof framing prior to the deck being placed and welded out.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/KW) Page 1 of 2
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Transwestern Commercial Services
5001 Spring Valley
Dallas, TX 75244
Report of Reinforcing Steel Inspection
Report No.: 295115
Project No.: 0712786
Date of Service: 08/09/2007
Report Date: 08/17/2007
Project: Gateway Business Center
Coppell, Texas
Services: Reinforcing Steel Inspection
Report of Inspection
Locations and Items Inspected:
Pour G, west of building 1
~ems Inspected Conform ing Non Item S Inspected Conforming Non Item s Inspected: Co nfo rm ing Non
Conforming Confo rm ing Conforming
Placing 0 rawings Bar Length Column Ties Properly
Approved x and Shape x Tied and Spaced NA
Bar Size x Proper B ar P lacem ent x Stirrup Spacing NA
Bar Grade x Properly Tied x Stirrup Type NA
Bars Clean x DowelBars in Place x Lapped Splices NA
Form Clean x Proper B ar Suppo rts x Corner Bars x
Num ber of Bars x P roper Cover x Mechanical Splices NA
Discrepancies / Comments: 1. Soil covering bars in some areas. 2. Debris/trash present. 3. Bars missing at
curb line and nottied. 4. Chairs not placed.
Discrepancies noted above were corrected prior to concrete placement.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing We assume no responsibility for variation in quality
(composition. appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd.
(TM/KW) Page 1 of 2
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Transwestern Commercial Services
5001 Spring Valley
Dallas, TX 75244
Report of Reinforcing Steel Inspection
Report No.: 294956
Project No.: 0712786
Date of Service: 08/08/2007
Report Date: 08/17/2007
Project: Gateway Business Center
Coppell, Texas
Services: Reinforcing Steel Inspection
Report of Inspection
Locations and Items Inspected:
Northwest paving/parking area, northwest from building 1
nem s Ins peeled: Co nform ing Non Item s Inspected Co nfo rm ing Non Item s Ins peeled: Conform ing Non
Conforming Conforming Conforming
Placing Drawings Bar Length Colum n Ties Properly
Approved x and Shape x Tied and Spaced NA
8 ar Size x Pro per B ar P lacem enl x Stirrup Spacing NA
Bar Grade x Pro perly Tied x Stirrup Type NA
8 ars Clean x Dowel Bars In Place x Lapped Splices x
Form Clean x Pro per Bar Suppa rls x Corner Bars x
Number of Bars x Proper Cover x Mechanical Splices NA
Discrepancies / Comments: 1, Bars at edge of forms at far west side of paving area, 2. Reinforcing was buried/covered with
soil/mud in overall form area, 3, Clean debris from placement area, 4. Bottom bars at curb line for islands at parking area,
westside, were notin place ortied, 5, Extra reinforcing scattered throughout area, 6, Chairs notin place.
Discrepancies noted above were corrected prior to concrete placement.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc,) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd,
(TM/KW) Page 1 of 2
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Transwestern Commercial Services
5001 Spring Valley
Dallas, TX 75244
Report of Reinforcing Steel Inspection
Report No.: 294654
Project No.: 0712786
Date of Service: 08/06/2007
Report Date: 08/17/2007
Project: Gateway Business Center
Coppell, Texas
Services: Reinforcing Steel Inspection
Report of Inspection
Locations and Items Inspected:
Paving, northwest parking lot from northwest corner of building 1
~em s Ins peeled Conforming Non ~em s Inspected Co nform ing Non ~em s Inspected: Co nfo rm ing Non
Co nfo rm ing Conform Ing Confo rm ing
Placing Drawings Bar Length Co lum n Ties Properly
Appro ved x and Shape x Tied and Spaced NA
Bar Size x P fO per Bar P laeem ent x Stirrup Spacing NA
Bar Grade x P ro perly Tied x Stirrup Type NA
Bars Clean x Dowel Bars In Place x Lapped Splices x
Form Clean x Proper B ar Suppa rts x Corner Bars NA
Numberof Bars x Proper Cover x Mechanical Splices NA
Discrepancies / Comments: 1. Remove loose debris from placement area. 2. Tie down reinforcing steel at various
locations. 3. Missing dowel bars in one area. 4. Missing chairs
Discrepancies noted above were corrected priorto concrete placement.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/KW) Page 1 of 2