ST9904-CS070824 Page 1 of2 Rhonda Adloo - New Construction Projects From: Ken Griffin To: g_ann_marie@yahoo.com Date: 8/24/2007 8:55 AM Subject: New Construction Projects CC: Keith Marvin; Rhonda Adloo Ms. Bradfield After I received your email, I sent the following underlined email to the state. The SH 121 project is designed and constructed by the Texas Department of Transportation (TxDOT). As my email shows, we do not have a set of construction plans, the timetable is one year and the work will be seven days a week. When, or if, I receive some traffic information, it will be shared with the citizens via our web site, Coppell Clips, and local newspapers. In regards to the railroad crossing on Royal, the work is being performed by DART (they own the track). The only traffic control will be diverting all traffic to one side of the road while the other side is being repaired. Once that side is completed, the traffic will switch to that side and the other side will be repaired. In essence, during the construction there will only be one lane in each direction, not two. Construction should take about one month, with good weather. Hopefully this information has been helpful. If you have any other questions, please contact me at the phone number or email address listed. Ken Griffin, P. E. Director of Engineering/Public Works 972-304-3686 kgriffin@ci.coppell.tx. us Maurice Thanks for the update. After vour email, we provided the general timetable to our Council and citizens. The main question now is: how will traffic be handled? The onlv plan I have is a schematic from 2005 with CSJ#'s - CSJ:0364-02-017 & CSJ:0364-03- 064. Is there an actual construction set that will be sent to the city? Also, is there a traffic control plan we can provide to our citizens? Thanks for vour help. Ken Griffin, P. E. Director of Engineering/Public Works 972-304-3686 kgriffin~i. coppell. tx. us >>> "Maurice Pittman" <MPITTMA@dot.state.tx.us> 8/15/2007 12:06 PM>>> file:/ /C: \Documents and Settings\rbrother\Local Settings\ Temp \XPgrpwise\46CE9CEECit... 9/10/2007 Page 2 of2 Ken, I want to let vou know that the project to grade separate SH 121 @ Sandv Lake and Freeport let last week. The Contractor is JD Abrams. The bid was around $ 24 million. The project is set up to be completed in one vear. It's a seven dav calendar project. Thanks! >>> Gloria Bradfield <g ann marie@yahoo.com> 8/23/2007 10:47 PM >>> Afternoon, reading Coppell Clips I see two new construction projects that will impact myself and my co-workers getting to work on time without some preplanning. I work at the North Texas Postal facility located at Royal and Bethel. I'm wondering if some notice of alternate routes will be given to us? In the past I have helped co-workers figure out new routes when 635 was backed up. We could use a heads up on this info since some of these drivers are older and also foreign and don't know the streets in Coppell. I believe the number of our Human Resources department is 972-393-6309. We have a digital information system in the entrance lobby. Appreciate your help with this. Thank you, Gloria Bradfield file:/ /C: \Documents and Settings\rbrother\Local Settings\ Temp \XPgrpwise\46CE9CEECit... 9/10/2007