Duke Lesley 2A-LR070831
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Report of Concrete Compressive Strength Test
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report No.: 296555
Project No.: 0712932
Date of Service: 08/23/2007
Report Date: 08/31/2007
Project: Hemisphere's at Point West, ::'~t if ej2i}. {1
Coppell, Texas .
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 3,000 psi @ 28 days
Slump (in.): NA
Air (%): NA
Test Method: ASTM C-172
I\STM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 7751 PW
Placement Date: 08/23/2007
Weather Conditions: Partly cloudy
Time Sampled: 04:35pm Batch time: 03:58pm
Temperature - Air: 990F Concrete: 980F
Truck No: 140 Ticket No: 13157
Air Content: NA Unit Weight (pet): NA
Overall Placement Location:
Piers (see repbtt#296554)
Measured
Slump
(inches)
6.5
Sample Location:
Pier Bf7
REPORT OF TESTS
Cylinder
Marked Date
Set No. Tested
2 1 08/30/2007
2 2 09/20/2007
2 3 09/20/2007
2 4 10/18/2007
Age
(days)
7
Diameter
(in)
6.00
28
28
56
Concrete Compressive Cylinder 6" x 12"
Maximum
Load
(Ibs)
85,600
Compressive
Strength
(psi)
3,030
Fracture
Type
Unbonded Cap
Area
(in2)
28.27
Technician: Chris Harbour Rone Engineering
See Report 296554 for technician time~ ~
Report Distribution: ~. ~
0",,0 ~":~ :::;;;truct;oo, LP (Oall.., TX) Attoo M< p", By,", " , ' ' .., . '" .' ~
1-cc P~tter Concrete Attn: Mr. Ryan Skelly K. Scott Watson, AET
1-cc City of Coppell Attn: Mr. Lee Stone. Project Manager
1-cc City of Coppell Attn: Mr. Larry DaVIS
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar sUbject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be repnoduced except in full without the written approval of Rone Engineering Services, Ltd.
(TMILB) Page 2 of 2
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 296555
Project No.: 0712932
Date of Service: 08/23/2007
Report Date: 08/31/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: 01
Specification Requirements
Strength: 3,000 psi @ 28 days
Slump (in.): NA
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 7751 PW
Placement Date: 08/23/2007
Weather Conditions: Partly cloudy
Time Sampled: 11 :05am Batch time: 09:53am
Temperature - Air: 930F Concrete: 910F
Truck No: 140 Ticket No: 13140
Air Content: NA Unit Weight (pcf): NA
Overall Placement Location:
Piers (see report #296554)
Measured
Slump
(inches)
6.0
Sample Location:
Pier H/6
REPORT OF TESTS
Cylinder
Marked Date
Set No. Tested
1 1 08/30/2007
1 2 09/20/2007
1 3 09/20/2007
1 4 10/18/2007
Age
(days)
7
Diameter
(in)
6.00
28
28
56
Concrete Compressive Cylinder 6" x 12"
Maximum
Load
(Ibs)
71,750
Compressive
Strength
(psi)
2,540
Fracture
Type
Unbonded Cap
Area
(in2)
28.27
LIMITATION S: The test results presented herein were prepared based upDn the specific samples provided for testing. We assume nD responsibility for variation in quality
(composition, appearance, etc.) or any Dther feature of similar subject matter prDvided by persons Dr conditions Dver which we have no control. Our letters and reports are
for the exclusive use of the clients tD whom they are addressed and shall nDt be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TMlLB) Page 1 of 2
Rone Engineering
.
B90B Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich. Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Reinforcing Steel Inspection
Report No.: 297356
Project No.: 0712932
Date of Service: 08/29/2007
Report Date: 08/31/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Reinforcing Steel Inspection
Report of Inspection
Locations and Items Inspected:
Pier cap, grid lines 8.9/1.2-0.8
Item s Inspected Co nfo rm ing Non Items Inspected Co nfo rm ing Non Item s Inspected: Co nfo rm ing Non
Conforming Conforming Conforming
P lacing Drawings Bar Length Column Ties Properly
Approved x and Shape x Tied and Spaced NA
Bar Size x --~~- Proper Bar P I~cem ent x Stirrup Spacing - __x. ..- _._--:._~~-~
-- .-- .,---
Bar Grade x Pro perly Tied x Stirrup Type x
Bars Clean x Dowel Bars in Place x Lapped Splices x
Form Clean x Proper Bar Suppa rts x CornerBars NA
NumberofBars x ProperCover x Mechanical Splices NA
Discrepancies / Comments:
No apparent discrepancies were noted at the locations listed above.
Technician: Chris Harbour Rone Engineering
See Report 297227 for technician time.~~
Report Distribution: . . . . . . . .
DOg. ~":~ ;;,op~'ruct;Oo. LP (D'''''. TX) Atlo. Me. Poo' Bym. . . .. ... .-:..-
1-cc City of Coppell Attn: Mr Lee Stone K. Scott Watson, AET
1-cc City of Coppell Attn: Mr Larry Davis Project Manager
~
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons Dr conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/LB) Page 1 of 1
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Project: Hemisphere's at Point West
Coppell, Texas
Services: Straight Shaft Pier Inspection
Report of Inspection
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, 8te 600, Houston, TX 77040
4421 Freidrich, 8te 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Drilled Pier Inspection
Report No.: 296401
Project No.: 0712932
Date of Service: 08/22/2007
Report Date: 08/31/2007
D rille r: A UQ e r
Pie r Id e ntifica tio n E /4 F/5 E /5 D /5 D /4
Pier Diameter (in) 24 24 24 24 24
Depth of Pier From Surface 1ft) 42.30 41.70 42.90 42.90 43.20
Depth ofBearinQ Stratum Fro m Surface(ft) 36.20 36.50 37.00 37.50 38.00
Required Penetration (ft) 5.00 5.00 5.00 5.00 5.00
A ctua I P e ne tra tio n (ft)- 6.10 5.20 5.90 5.40 5.20
Condition of Bottom (wet/dry) Dry Dry Dry Dry D rv
Plumb Within Tolerance (ves / no) Yes Yes Yes Yes Yes
CasinQ Diameter(in)/CasinQ LenQth (ft) 2 6/3 6 26/36.3 2 6 /3 7 26/37 26/36.9
NumberofBars /ReinforcinQ BarSize 6 / # 6 6 / # 6 6 / #6 6 / #6 6 / # 6
Length of Reinforcing Steel (ft) 41.20 40.50 41 .70 41.70 42.10
Time Drilling was Completed (am /pm) 7 :4 1 AM 8:12 AM 8:54 AM 9:15 AM 10:00 AM
Time Concrete was Placed (am /pm) 8:20 AM 9 :0 0 A M 9 :5 0 AM 10:40 AM 11:30AM
Depth of Pier From Top of Concrete (ft) 41.80 41 .20 42.40 42.40 42.70
Elevation: Surface (ft)** 99.50 99.50 99.50 99.50 99.50
Elevation: Top of Pier (ft)-- 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft)** 57.20 57.80 56.60 56.60 56.30
Elevation: Top of BearinQ Stratum (ft.) ** 63.30 63.00 62.50 62.00 61.50
Bearing Stratum (description) Blue shale
Note: See re port # N A fo reo m pre s s ive S tre n g th T est S p e c i men s.
- Additional Penetration not requested unless noted. **Elevation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/LB) Page 1 of 3
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 296401
Project No.: 0712932
Date of Service: 08/22/2007
Report Date: 08/31/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: Auger
Pier Identification C 14 C 15 B 14 B 15 B /6
PierDiameter(in\ 24 24 24 24 24
De p th 0 f Pie r Fro m S urfa ce (ft) 42.50 42.40 41.60 43.00 43.60
Depth of Bearing Stratum Fro m Surface (ft) 37.00 36.60 36.40 37.40 37.70
R e qui re d P e ne tra tio n (ft) 5.00 5.00 5.00 5.00 5.00
A ctua I P e ne tra tio n (ft). 5.50 5.80 5.20 5.60 5.90
Condition of Bottom (wet I dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes Ino) Yes Yes Yes Yes Yes
Casing D i a mete r (i n) I Cas in g Len g th (ft) 26/36.9 26/36.6 2 6 13 6 .2 26 26
NumberofBars IReinforcing BarSize 6 1#6 6 1#6 6 1#6 6 / #6 6 1#6
Length of Reinforcing Steel (ft) 41 .50 41 .40 40.60 41 .90 42.60
Time Drilling was Completed (am I pm) 10:39AM 11:14AM 1 1 :49 A M 12:15 PM 1 :00 P M
Time Concrete was Placed (am I pm) 1 2 :0 0 P M 12:15 PM 1 :40 P M 2 :2 5 P M 2 :5 0 PM
De p th 0 f P ie r Fro m Top 0 f Con c re te (ft) 42.1 0 42.00 41 .20 42.60 43.20
Elevation: Surface (ft).. 99.50 99.50 99.50 99.50 99.50
E leva tio n: To p of P ie r (ft)** 99.1 0 99.10 99.10 99.1 0 99.1 0
Elevation: Bottom of Pier (ft)** 57.00 57.1 0 57.90 56.50 55.90
E Ie va ti 0 n : Top 0 f B e a ri n g S tra tu m (ft. ) ** 62.50 62.90 63.1 0 62.1 0 61 .80
Bearing Stratum (d e scrip tio n) Blue sha Ie
Note' See re port # NA for Com pressive Strength Test S pecim ens.
* Additional Penetration not requested unless noted HE levation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar SUbject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/LB) Page 2 of 3
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 296401
Project No.: 0712932
Date of Service: 08/22/2007
Report Date: 08/31/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: AUQer
Pier Identification C 16 D 16 E 16 J 12 E a s t J 12 We s t
PierDiameter(in) 24 24 24 24 24
D e p th 0 f Pie r Fro m Surface(ft\ 40.30 43.00 42.70 42.40 40.80
Depth of Bear in a Stratum Fro m Surface(ft) 35.30 37.30 37.00 38.20 37.30
Required Penetration (ft) 5.00 5.00 5.00 2.00 2.00
A ctua I P e ne tra tio n (ft)" 5.00 5.70 5.70 4.20 3.50
Condition of Bottom (wet I dry) Dry Dry Dry Dry D rv
Plumb Within Tolerance (ves Ino) Yes Yes Yes Yes Yes
C asinQ D iam eter (in) I C asina Length (ft) 2613 9 26/37.3 26/37 2 6/3 7 26/37
NumberofBars IReinforcing BarSize 6 1#6 6 1#6 6 1#6 6 1#6 6 1#6
Length of Reinforcing Steel (ft) 3 9.3 0 42.00 3 9 .70 40.10 38.80
Time DrillinQ was Completed (am Ipm) 1 :45 P M 2:15 PM 2 :3 8 PM 3 :28 PM 4 :26 P M
Tim e Con c re te was P la c e d (a m I pm) 3 :2 0 PM 3:50 PM 4 :20 PM 5:00 PM 5 :30 PM
Depth of Pier From Top of Concrete (ft) 3 9.8 0 42.50 42.20 41 .g 0 40.30
Elevation: Surface (ft)" 9 9 .50 9 9.5 0 9 9 .50 9 9.5 0 9 9.5 0
E leva tio n: To p of Pie r (ft)" 9 9 .00 9 g.O 0 9 9 .00 9 g.O 0 9 9 .00
Elevation: Bottom of Pier (ft).. 5 9.2 0 56.50 56.80 57.1 0 58.70
Elevation: Top of Bearina Stratum (ft.).. 64.20 62.20 62.50 61 .30 62.20
B e a ri n Q S tra tu m (descriotion) B lu e s h a Ie
Not e: See re port # for Com pressive Strength Test S pecim ens
"Additional Penetration not requested unless noted. "E levation by others
Remarks: Refer to sheet X 101 for strattle pier details; 5' East and West of centerline C5/2
Technician: Chris Harbour Started: 05:45am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Finished: 06:45pm Rone Engineering
P-~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/LB) Page 3 of 3
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 296554
Project No.: 0712932
Date of Service: 08/23/2007
Report Date: 08/31/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Straight Shaft Pier Inspection
Report of Inspection
D rille r: Auaer
Pie r Id e ntifica tio n B 13 F/6 G /6 H /6 1/6
PierDiameter(in) 24 24 24 24 24
DepthofPierFrom Surface (ft) 42.30 43.30 43.70 43.30 42.00
Deoth of Bear in a Stratum Fro m Surface(ft) 36.30 37.30 37.50 37.20 36.00
Required Penetration (ft) 5.00 5.00 5.00 5.00 5.00
Actual Penetration (ft)- 6.00 6.00 6.20 6.10 6.00
Condition of Bolt om (wet/dry) Dry Dry Dry Dry Dry
Plum b Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter(in)/Casina Lenath(ft) 2 6/3 6 26/37 2 6 13 7 26/36.8 26/36
NumberofBars IReinforcing l3arSize 6 1 #6 6 ! #6 6 ! #6 6 1#6 6 1#0
Lenath of Reinforcing Steel (ft) 40.50 41.70 41.90 42.60 40.50
Time Drillina was Completed (am Ipm) 7:40AM 8:20 AM 8:49 AM 9:17 AM 9 :5 1 AM
Time Concrete was Placed (am Ipm) 9:00 AM 9:49 AM 1 0 :4 9 AM 1 1 :25 AM 12 :00 PM
D eo th 0 f Pie r Fro m Top 0 f Con c re te (ft) 41.80 42.80 43.20 42.80 41.50
Elevation: Surface (ft)** 99.50 99.50 99.50 99.50 99.50
Elevation: Top of Pier (ft)-- 99.00 99.00 99.00 99.00 99.00
E Ie va tio n: B 0 t10 m 0 f P ie r (ft)** 57.20 56.20 55.80 56.20 57.50
Elevation: Top of Bearing Stratum (ft.) ** 63.20 62.20 62.00 62.30 63.50
Bearing Stratum (description) Blue shale
Note: See re port # 296555 fo r Com pre s s ive S tre ng th T est S p e c im ens.
- Additional Penetration not requested unless noted. **Elevation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/LB) Page 1 of 4
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 296554
Project No.: 0712932
Date of Service: 08/23/2007
Report Date: 08/31/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Straight Shaft Pier Inspection
I
Driller: A ug e r
Pier Identification J/6 J/7 1/7 H/7 G/7
Pier Diameter (in) 24 24 24 24 24
De p th 0 f Pie r Fro m S u rfa c e (ft) 41.00 42.00 42.40 42.00 40.90
D e p th 0 f B e a ri n aStra tu m F ro m S u rfa c e (ft) 36.00 36.30 36.70 36.50 35.40
Reo uire d P e netra tio n (ft) 5.00 5.00 5.00 5.00 5.00
Actual Penetration (ft)* 5.00 5.70 5.70 5.50 5.50
Condition of Bottom (wet/dry) D rv D rv D rv D rv D rv
Plumb Within Tolerance (yes I no) Yes Yes Yes Yes Yes
Casino Diameter (in) ICasina Lenath (ft) 2 6/3 6 2 6/3 6 26/36.5 2 613 6 2 6/3 5 .4
N u m b e r 0 f Bar s / Rei n fo r c i n 0 Bar S i z e 6 1#6 6/#6 6/#6 6 1#6 6 1#6
Lenath of Reinforcina Steel (ft) 39.50 40.80 41.00 39.80 39.50
~~..J2..~j~!2...cL~us ('.0 m p Ie ~e d (a m I pm) 10:30AM 11-:00 AM 1 1-;30- AcM, , .".." non,.._ 1--boa-5-P M
- -
Time Concrete was Placed (am 10m) 12:55 PM 1 :30 PM 1:40PM 1 :55 PM 2 :15 PM
DepthofPierFrom Top of Concrete (ft) 40.50 41.50 41.90 41.50 40.40
E levatio n: Surface (ft)** 99.50 99.50 99.50 99.50 99.50
E levatio n: To 0 of Pie r (ft)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft)** 58.50 57.50 57.10 57.50 58.60
Elevation: Too of Bearina Stratum (ft.)** 63.50 63.20 62.80 63.00 64.10
Bearina Stratum (descriotion) Blue shale
Note: See re port # 296555 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted. **Elevation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CHfLB) Page 2 of 4
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 296554
Project No.: 0712932
Date of Service: 08/23/2007
Report Date: 08/31/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Straight Shaft Pier Inspection
---i-I
D ri lie r: A ua e r
Pier Identification F /7 E /7 D /7 C 17 B 17
Pie r D i a mete r (i n) 24 24 24 24 24
De p th 0 f P ie r Fro m S urfa ce (f1) 42.00 41.50 41.30 42.00 41.80
Depth of Bear in a Stratum Fro m S u rfa ce (f1) 35.90 35.50 35.60 37.00 36.40
Required Penetration (f1) 5.00 5.00 5.00 5.00 5.00
A ctua I P e netra tio n (f1)* 6.10 6.00 5.70 5.00 5.40
Con d i ti 0 n 0 f Botto m (wet 1 dry) Dry Dry D rv D rv Dry
Plumb Within Tolerance (ves Ino) Yes Yes Yes Yes Yes
C asina D iam eter (in) 1 C asina Lenath (f1) 26/35.8 26/3 5 .5 26/35.6 2 6 13 7 26/36.4
Number of Bars IReinforcing BarSize 6 1 #6 6 1 #6 6 1 #6 6 1 #6 6 1 #6
LenQth of ReinforcinQ Steel (ft) 40.70 40.30 40.00 40.60 40.50
~.i.m...e. n r~ 1J!u.g.~w.as .g..E~F:-I~~AJ~~ In.} ..._-- 1 :11 PM .L2Z-E-M-- 1 A-5-P-.M- ...2;.O..().....j;l M -~~--
- -------.
Tim e Con c re te was Pia c e d (am 1 pm) 2 :5 5 PM 3: 15 PM 3 :3 5 PM 3:55 PM 4 :2 3 PM
Depth of Pier From Top of Concrete (ft) 41 .50 41.00 40.80 41 .50 41.30
Elevation: Surface (ft)** 99.50 99.50 99.50 99.50 99.50
Elevation:Top of Pier (f1)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pie r (f1)** 57.50 58.00 58.20 57.50 57.70
E Ie va ti 0 n : Top ofBearinQ Stratum (f1.)** 63.60 64.00 63.90 62.50 63.10
Bearing Stratum (description) B lu e s h a Ie
Note: See report # 296555 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted "E levation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/LB) Page 3 of 4
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 296554
Project No.: 0712932
Date of Service: 08/23/2007
Report Date: 08/31/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: Auoer
Pie rid e nlifica lio n B 18 C 18 D 18
PierDiameter(in) 24 24 24
De p th 0 f P ie r Fro m Surface(ft) 42.80 43.90 41.50
Depth ofBearino Slratum From S u rfa c e (ft) 37.40 37.50 35.70
Required P e ne tra tio n (ft) 5.00 5.00 5.00
Aclual Penetration (ft)* 5.40 6.40 5.80
Co nd itio n of Bottom (wet I dry) Dry Dry D rv
Plumb Within Tolerance (ves Ino) Yes Yes Yes
Casino Diameler(in)/Casina Lenath (ft) 26/37.4 2 6/37 .1 26/33.7
NumberofBars/Reinforcina BarSize 6 1#6 6 1#6 6 1#6
Length of Reinforcina Steel (ft) 41.60 42.70 40.30
Tlme -9:~!lio.f!.-::I::L_<l';:;.c ~rr~ F:8 1_'2.~~_r~~) .c3 :~c~_ ----321LE.M ~:3.:4 O~- -- -- --
---'-----
Tim e Concrete was Placed (am 1 pm) 4:35 PM 5: 10 PM 5 :2 0 P M
De p th 0 f P ie r Fro m Top of Concrete (ft) 42.30 43.40 41.00
Elevation: Surface (ft)** 99.50 99.50 99.50
Elevation:Top of Pier (ft)** 99.00 99.00 99.00
E Ie va tio n: B 0 t10 m of Pier (fl)** 56.70 55.60 58.00
Elevation: Top of BearinQ Slratum (ft.)** 62.10 62.00 63.80
Bearino Stratum (d e s criptio n) Blue shale
Not e: See re port # 296555 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted. **E levation by others
Technician: Chris Harbour Started: 05:45am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Finished: 06:30pm Rone Engineering
pdd~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, elc.) or any other feature of similar subject matter provided by persons or conditions over which we have no conlrol. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/LB) Page 4 of 4
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of In-Place Density Testing
Report No.: 296652
Project No.: 0712932
Date of Service: 08/23/2007
Report Date: 08/31/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Perform In-Place Density Testing
PROJECT DATA
Contractor: Duke Construction, LP
Test Method: ASTM D-6938
Gauge: Troxler 3430
Gauge Serial No: 35518
Test Mode: DT
Standard Counts
Moisture Density
Current: 729 Current: 2515
Previous: 728 Previous: 2501
MOISTURE DENSITY RELATIONS
MID No.
280733
Description
Medium Brown I Silty Clay wI Trace Sand
Moisture
%
Maximum
Density
(pet)
99.5
Project Requirements
Moisture Density
Minimum +4 92-96
20.5
FIELD DENSITY TESTS
Test Probe MID Moisture Wet Density Dry Density Density
No Test Location Depth No. % (pet) (pet) (% maxI
-
Utility backfill
6" Sanitary sewer line-west end, 500' from north 6" 280733 25.9 118.2 93.9 94
end, 5' below grade
Utility backfill
2 6" Sanitary sewer line-west end, 500' from north 6" 280733 24.8 117.9 94.5 95
end, 4' below grade
Utility backfill
3 6" Sanitary sewer line-west end, 500' from north 6" 280733 26.9 117.8 92.8 93
end, 3' below grade
Utility backfill
4 6" Sanitary sewer line-west end, 500' from north 6" 280733 25.4 117.4 93.6 94
end, 2' below grade
Utility backfill
5 6" Sanitary sewer line-west end, 500' from north 6" 280733 26.1 117.9 93.5 94
end, l' below grade
Utility backfill
6 6" Sanitary sewer line-west end, 500' from north 6" 280733 24.6 117.6 94.4 95
end, final
Technician: Joe Jernigan Started: 10:30am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) AUn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Finished: 01 :OOpm Rone Engineering
P-~~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(LB/LB) Page 1 of 1
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of In-Place Density Testing
Report No.: 296653
Project No.: 0712932
Date of Service: 08/23/2007
Report Date: 08/31/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Perform In-Place Density Testing
PROJECT DATA
Contractor: Duke Construction, LP
Test Method: ASTM D-6938
Gauge: Troxler 3430
Gauge Serial No: 35518
Test Mode: DT
Standard Counts
Moisture Density
Current: 729 Current: 2515
Previous: 728 Previous: 2501
MOISTURE DENSITY RELATIONS
Maximum
Moisture Density Project Requirements
MID No. Description % (pet) Moisture Density
294619 Lime Treated Brown 1 Silty Sandy Clay 32.7 87.0 Optimum +4 95 min
FIELD DENSITY TESTS
Test Probe MID Moisture Wet Density Dry Density Density
No Test Location Depth No. % (pet) (pet) (%max)
Cap
Building pad at grid line A.5/27 6" 294619 33.6 112.6 84.3 97
Cap
2 Building pad at grid line B.5/27 6" 294619 34.0 113.5 84.7 97
Cap
3 Building pad at grid line C.5/27 6" 294619 34.9 113.7 84.3 97
Cap
4 Building pad at grid line D.5/27 6" 294619 36.5 113.8 83.4 96
Cap
5 Building pad at grid line E.5/27 6" 294619 35.4 113.7 84.0 97
Cap
6 Building pad at grid line F.5/27 6" 294619 33.4 114.7 86.0 99
Cap
7 Building pad at grid line G.5/27 6" 294619 33.3 114.5 85.9 99
Cap
8 Building pad at grid line H.5/27 6" 294619 33.0 111.7 84.0 97
Cap
9 Building pad at grid line 1.5/27 6" 294619 34.0 111.9 83.5 96
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. LId
(LB/LB) Page 1 of 2
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of In-Place Density Testing
Report No.: 296653
Project No.: 0712932
Date of Service: 08/23/2007
Report Date: 08/31/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Perform In-Place Density Testing
FIELD DENSITY TESTS
Test Probe MID Moisture Wet Density Dry Density Density
No Test Location Depth No. % (pet) (pet) (%max)
Cap
10 Building pad at grid line J.5/27 6" 294619 33.2 114.3 85.8 99
Technician: Joe Jernigan Started: 01 :30pm
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Finished: 04:30pm Rone Engineering
~$~
K. Scott Watson, AET
Project Manager
LIMITATIONS The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(lB/lB) Page 2 of 2
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Reinforcing Steel Inspection
Report No.: 297356
Project No.: 0712932
Date of Service: 08/29/2007
Report Date: 08/31/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Reinforcing Steel Inspection
Report of Inspection
Locations and Items Inspected:
Pier cap, grid lines 8.9/1.2-0.8
Item s Inspected: Conforming Non Item s Inspected: Conforming Non Iltems Inspected: Co nfo rm Ing Non
Co nfo rm Ing Conforming Co nto rm ing
Ip lacing 0 rawlngs Bar Length Column Ties Properly
Appro ved x and Shape x T led and Spaced NA
BArSize y P ra per B ar Placement x Stirrup Spacing x
Bar Grade x Pro perly Tied x Stirrup Type x
Bars Clean x Dowel Bars in Place x Lapped Splices x
Form Clean x ProperBarSupports x Comer Bars NA
N urn ber of Bars x ProperCover x Mechanical Splices NA
Discrepancies / Comments:
No apparent discrepancies were noted at the locations listed above.
Technician: Chris Harbour Rone Engineering
See Report 297227 for technician time~~
Report Distribution:---""""
0"" ~":~ ;;,op~~t'"'"OO' LP (0,11." TX) Attn' M'. p", Byme .' ..' . · .. ~
1-cc City of Coppell Attn: Mr Lee Stone K. Scott Watson, AET
1-cc CIty of Coppell Attn: Mr Larry Davis p 'eel M
roJ anager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/LB) Page 1 of 1
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 296909
Project No.: 0712932
Date of Service: 08/27/2007
Report Date: 08/31/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Straight Shaft Pier Inspection
Report of Inspection
D ri lie r: Auger
Pie rid e ntifica tio n B 11 1 C 111 D 11 1 E /1 1 F /1 1
PierDiameter(in) 24 24 24 24 24
Depth of Pier From Surface (ft) 43.20 42.60 43.10 42.80 44.1 0
Depth of Bear in a Stratum Fro m Surface(ft) 37.20 37.00 36.20 36.20 37.60
Required Penetration (ft) 5.00 5.00 5.00 5.00 5.00
Actual Penetration (ft)* 6.00 5.60 6.90 6.60 6.50
Condition of Bottom (wet 1 dry) Dry Dry D rv Dry Dry
Plumb Within Tolerance (ves Ino) Yes Yes Yes Yes Yes
Casing Diameter(in)/Casina Lenoth (ft) 26/37 26/37 2 6 13 6 2 6/3 6 .1 2 6/3 7
tNiJ- ({i-b ~ f (; j b d ~"ti i f~ e i 111'-' I L: i I j 9 - B ti r &'I-z-e 6 1 # 6 6 i ira 61 #b -fj f# 0 . 6 ; #6
--~_.-
Length of Reinforcing Steel (ft) 42.1 0 41 .50 39.90 41.60 43.00
Time Drilling was Completed (am Ipm) 8 :08 AM 7:47AM 8 :28 AM 8 :5 6 AM 9 :2 2 AM
Tim e Con c re te was P la c e d (a m 1 pm) 8 :45 AM 9:10 AM 9 :55 AM 1 0 :2 7 AM 10:54AM
De p th 0 f P ie r Fro m Top of Concrete (ft) 42.70 42.10 42.60 42.30 43.60
Elevation: Surface (ft)** 98.50 98.50 98.50 98.50 98.50
E Ie va ti 0 n: Top 0 f Pie r (ft) ** 98.00 98.00 98.00 98.00 98.00
Elevation: Bottom of Pier (ft)** 55.30 55.90 55.40 55.70 54.40
Elevation: Top of Bearing Stratum (ft. ) ** 61.30 61.50 62.30 62.30 60.90
Bearing Stratum (description) Blue shale
Note: See repo rt # 296910 for Com pressive S tre ngth Test S pecim ens.
* Add itio na I P e netratio n not re q ue ste d unle s s noted. HE Ie va tio n by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/JB) Page 1 of 4
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 296909
Project No.: 0712932
Date of Service: 08/27/2007
Report Date: 08/31/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: Auger
Pie rid e ntifica tio n G /1 1 H /1 1 1/1 1 J /1 1 J /1 2
Pier Diameter (in) 24 24 24 24 24
Depth of Pier From S urfa ce If 0 43.20 44.10 43.80 42.30 42.60
Depth of Bearino Stratum Fro m Surface(ft) 37.20 37.60 37.30 36.20 37.10
Required P e ne tra tio n 1ft) 5.00 5.00 5.00 5.00 5.00
Actual Penetration (ft)- 6.00 6.50 6.50 6.10 5.50
Condition of Bottom (wet/drv) D rv D rv D rv D rv D rv
Plumb Within Tolerance (ves /no) Yes Yes Yes Yes Yes
Casina Diameter(in)/Casina Lenath (ft) 2 6 /3 7 26/37 26/37 26/36 26/37
N u m be r 0 f Bars / Rei n fo rc i naB a r Size 6 / # 6 6 / #6 6 / #6 6 / #6 6 / #6
Lenath of Reinforcina Steel (ft) 42.00 43.60 42.70 41 .1 0 41.50
, TiiTI_~~1 r.!.i!J~9 _oN-2-?2<)~.:Y.!.~:e d (a 1I'/.2...!!1...) 9:50 AM 10:09 AM 10:31 AM 1-0 :4 9 A-M-- H:l 9A M
Tim e Con c re te was Placed (am / pm) 11:10AM 11:25AM 12 :09 AM 1 :10 AM 1 :30 AM
De p th 0 f Pie r Fro m Ton of Concrete (ft) 42.70 43.60 43.30 41.80 42.1 0
E Ie va ti 0 n : S u rfa c e (ft) ** 98.50 98.50 98.50 98.50 98.50
E Ie va ti 0 n : Too ofPier(ft)** 98.00 98.00 98.00 98.00 98.00
E Ie va ti 0 n : B 0 t10 m ofPier(ft)** 55.30 54.40 54.70 56.20 55.90
Elevation: Top of Bearina Stratum (f!.)** 61 .30 60.90 61 .20 62.30 61.40
BearinQ Stratum (descriotion) B lu e s h a Ie
Note' See report # 296910 for Compressive Strength Test S pecim ens.
* Additional Penetration not requested unless noted. **E levation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/JB) Page 2 of 4
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 296909
Project No.: 0712932
Date of Service: 08/27/2007
Report Date: 08/31/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: Auger
Pier Identification 1/12 H 112 G 112 F 112 E 112
Pie r D i a mete r (i n) 24 24 24 24 24
De 0 th 0 f P ie r Fro m Surface(ft) 43.30 46.30 44.40 42.60 42.80
Deoth ofBearino Stratum Fro m S urfa ce (ft) 36.70 39.10 37.20 36.00 37.00
Reo uire d P e netra tio n (ft) 5.00 5.00 9.00 5.00 5.00
A ctua I P e ne tra tio n (ft)- 6.60 7.20 7.20 6.60 5.80
Condition of Bottom (wet/drv) D rv Dry D rv D rv Dry
Plumb Within Tolerance (ves Ino) Yes Yes Yes Yes Yes
Casina Diameter(in)/Casina Lenath(ft) 26/36.7 26/38.5 26/37 2 6 13 6 2 6 13 6 .5
NumberofBars IReinforcino BarSize 6 1#6 6 1#6 6 1#6 6 1#6 6 1#6
Lenath of Reinforcino Steel (ft) 42.10 45.00 43.20 41.40 41.60
!-I~':::"!.~illil\H w<>-&..G-Jt!npleted (am ~p-m) "" 1 1 .42" AM 12 :06 PM 1 :4::4-:P-M- ". "- - 'l-:-3-9.FM" . f 2:09 -f3"M--
Time Concrete was Placed (am 10m) 1 :59 PM 2 :30 PM 3:05 PM 3:35 PM 4 :0 5 P M
D eo th 0 f P ie r F ro m Too of Concrete (ft) 42.80 45.80 43.90 42.10 42.30
Elevation: Surface (ft).. 98.50 98.50 98.50 98.50 98.50
Elevation: Too of Pier (ft).. 98.00 98.00 98.00 98.00 98.00
Elevation: Bottom of Pier (ft).. 55.20 52.20 54.10 55.90 55.70
Elevation: Too of Bear in a Stratum (ft.)" 61 .80 59.40 61.30 62.50 61.50
Bearino Stratum (descriotion) Blue sha Ie
No Ie: See re porI # 296910 for Com pressive Strength Tesl Specimens.
* Additional Penetration not requested unless noted HE levation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/JB) Page 3 of 4
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 296909
Project No.: 0712932
Date of Service: 08/27/2007
Report Date: 08/31/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: Auaer
Pie r Id e n ti fi c a ti 0 n D /1 2 C /1 2 B /12
Pier Diameter (in) 24 24 24
D e p th 0 f Pie r Fro m S u rfa c e (ft) 43.20 43.70 43.00
Depth of Bear in a Stratum Fro m S u rfa c e (ft) 37.50 38.00 36.50
R e qui re d P e ne tra tio n (ft) 5.00 5.00 5.00
A ctua I P enetra tio n (ft)' 5.70 5.70 6.50
Condition of Bottom (wet / dry) Dry Dry D rv
Plumb Within Tolerance (ves/no) Yes Yes Yes
Casing Diameter (in) / C asina Length (ft) 26/37 26/38 26/36.5
N urn b e r 0 f Bars / Rei n fo r c i n 9 BarSize 6 / #6 6 / # 6 6 / #6
Length of Reinforcing S te e 1 (ft) 42.00 42.50 41.80
~..:!:.J.m-e.-P_:Til~n~w~ ~-..C. ~ .'~2!::! lL~_Ja m Lp.m..)...:..::.:--=-_ ~2 :2~9_ ~_M--,- -.2.~5.0-I2M 3:2~. PM .--.--- ---~.._--- --- I--.
Tim e Con c re te was P la c e d (am / pm) 4:20 PM 4:45 PM 5:20 PM
D e p th 0 f Pie r Fro m Top of Concrete (ft) 42.70 43.20 42.50
Elevation: Surface (ft).. 98.50 98.50 98.50
E Ie va Ii 0 n: Top of Pier (ft).. 98.00 98.00 98.00
Elevation: Bottom of Pier (ft).. 55.30 54.80 55.50
Elevation: Top ofBearinCl Stratum (ft.)' , 61 .00 60.50 62.00
Bearina Stratum (description) Blue shale
Note See report # 296910 for Compressive Strength Test Specimens.
... Additional Penetration not requested unless noted HE levation by others
Technician: Chris Harbour Started: 05:45am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppeil Attn: Mr. Lee Stone
1-cc City of Coppeil Attn: Mr. Larry Davis
Finished: 06:15pm Rone Engineering
p~~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/JB) Page 4 of 4
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 296709
Project No.: 0712932
Date of Service: 08/24/2007
Report Date: 08/31/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Straight Shaft Pier Inspection
Report of Inspection
Driller: Auaer
Pie r ld e ntifica tio n E/8 F/8 G 18 H/8 1/8
PierDiameter(in) 24 24 24 24 24
Depth of Pier From Surface (ft) 43.70 43.40 44.00 44.00 38.00
Depth of Bear in a Stratum From S u rfa c e (ft) 38.00 37.50 37.20 37.60 31 .50
Reauired Penetration (ft) 5.00 5.00 5.00 5.00 5.00
Actual Penetration (ft)' 5.70 5.90 6.80 6.40 6.50
Condition of Bottom (wet/dry) Dry Dry Dry D rv Dry
Plumb Within Tolerance (ves I no) Yes Yes Yes Yes Yes
Casinq Diameter(in)/Casina Length (ft) 26/3 8 26/37.5 2 6 13 7 2 6 13 7 .5 26/31.5
'Nltmbe, LlfB-ar:. IReifibr<;I,;o BarSize 6 1#6 6 1#3 G / #6 6 / #6 6-1 #6
Length of Reinforcing Steel (ft) 41 .70 42.50 42.20 42.80 37.00
Time DrillinCl was Completed (am Ipm) 7 :40 A M 8:15 AM 9 :4 8 AM 10:03 AM 10:24 AM
Time Concrete was Placed (am I pm) 8:30 AM 9:55 AM 1 0 :4 9 A M 11:15AM 12:00 PM
Depth of Pier From Top of Concrete (ft) 43.20 42.90 43.50 43.50 37.50
E Ie va tio n: S urfa ce (ft).. 98.50 98.50 98.50 98.50 98.50
Elevation: Top of Pier (ft)" 98.00 98.00 98.00 98.00 98.00
Elevation: Bottom of Pier (ft).. 54.80 55.10 54.50 54.50 60.50
Elevation: Top of Bearina Stratum (ft.)" 60.50 61.00 61 .30 60.90 67.00
Bearinq Stratum (descriotion) Blue shale
Note: See re port # 29671 0 fo r Com pre s s ive S tre ng th T est S p e c i mens.
'Additional Penetration not requested unless noted. "Elevation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/JB) Page 1 of 4
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 296709
Project No.: 0712932
Date of Service: 08/24/2007
Report Date: 08/31/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Straight Shaft Pier Inspection
D ri lie r: A ug e r
Pie r Id e n Ii fi cat ion J/8 1/9 H /9 G /9 F /9
Pie r D i a mete r (i n) 24 24 24 24 24
Deoth of Pier From Surfacelft\ 42.00 42.40 42.10 42.60 43.50
D eoth of Bearina Stratum Fro m Surface(ft) 36.20 36.40 36.40 37.50 37.60
Reauired P e ne tra tio n (ft) 5.00 5.00 5.00 5.00 5.00
A ctua I P e ne tra tio n Ift\' 5.80 6.00 5.70 5.10 5.90
Condition of Bottom Iwet/drv\ D rv Dry D rv D rv D rv
Plumb Within Tolerance Ives /no) Yes Yes Yes Yes Yes
Casina Diameterlin)/Casina Length 1ft) 26/36.2 26/36.4 26/36.2 26/37.5 26/37.2
NumberofBars /Reinforcina BarSize 6 / # 6 6 / #6 6 / #6 6 / #6 6/#6
Lenath of Reinforcina Steel (ft) 41 .00 41.20 40.70 41.20 41.30
~.-!2..:.jJ.;L~..a..i~.4::; C (, In P;€ if.: J_ (a HI .' pm ; 10:49AM 11:05AM 1121 A~_ ~!..:!~6_A M..-: ~2 i5 F M :
--
Tim e Con c re te was P la c e d I am/om) 12:35 PM 1:10PM 1 :45 PM 2 :2 0 PM 2:47 PM
Depth of Pier From Too of Concrete 1ft) 41 .50 41 .90 41 .60 42.10 43.00
Elevation: Surface Ift)** 98.50 98.50 98.50 98.50 98.50
Elevation:Too ofPier(ft)** 98.00 98.00 98.00 98.00 98.00
Elevation: Bottom of P ie r 1ft) ** 56.50 56.10 56.40 55.90 55.00
Elevation: Too of Bearina Stratum (ft.)** 62.30 62.10 62.1 0 61.00 60.90
Bearina Stratum (descriotion) Blue sha Ie
Not e: See re port # 296710 for Compressive Strength Test Specimens.
.,. Additional Penetration not requested unless noted HE levation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/JB) Page 2 of 4
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 296709
Project No.: 0712932
Date of Service: 08/24/2007
Report Date: 08/31/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: A ua e r
Pier Identification E /9 D /9 C /9 J/9 J /1 0
PierDiameter(in) 24 24 24 24 24
D e p th 0 f Pie r Fro m S u rfa c e (ft) 43.00 42.90 43.00 42.20 42.00
Depth of Bear in a Stratum Fro m Surface(ft) 37.60 37.00 37.20 37.00 36.80
Required P e netra tio n (ft) 5.00 5.00 5.00 5.00 5.00
Actual Penetration (ft)' 5.40 5.90 5.80 5.20 5.20
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (ves/no) Yes Yes Yes Yes Yes
Casing Diameter(in)/Casina Lenath (ft) 26/37 26/37 2 6/3 7 2 6 /3 7 26/36.8
NumberofBars /Reinforcing BarSize 6 / # 6 6 / #6 6 / #6 6 / # 6 6 / #6
Length of Reinforcing S te e I (ft) 41.40 41.10 41 .50 40.90 40.70
~me ~Ei:ll~ll~~~ C ~I'}ii~ ~e<! Ji3 m / pm) .. 1 :00 PM 1:15.PM J :4 fiE..M.. ~.. 2 '2.0 ~;::- .=.:.3.: Q 0 M '0-
Tim e Con c re te was P la c e d (am / pm) 3:1 5 PM 3 :45 P M 4:10 PM 4:33 PM 5 :0 0 P M
Depth of Pier From Top 0 f Con c re te (ft) 42.50 42.40 42.50 41 .70 41.50
Elevation: Surface (ft).. 98.50 98.50 98.50 98.50 98.50
Elevation: Top of Pier (ft)" 9 8.00 98.00 98.00 98.00 98.00
Elevation: Bottom of Pier (ft).. 55.50 55.60 55.50 56.30 56.50
Elevation: Top of Bear in a Stratum (ft.) .. 60.90 61 .50 61.30 61.50 61.70
Bearing Stratum (description) Blue shale
Note: See report # 296710 for Com pressive Strength Test S pecim ens
'Additional Penetration not requested unless noted. uE levation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/JB) Page 3 of 4
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 296709
Project No.: 0712932
Date of Service: 08/24/2007
Report Date: 08/31/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Straight Shaft Pier Inspection
D rille r: Auaer
Pie r Id e ntifica tio n 1/10 H 110
Pie r D i a mete r (i n) 24 24
Depth of Pier From Surface (ft) 42.30 42.70
Depth of Bear in a Stratum From Surface (ft) 36.00 36.70
Required P e ne tra tio n (ft) 5.00 5.00
Actual Penetration (ft)' 6.30 6.00
Condition of Boll om (wet 1 d rv) D rv Dry
Plumb Within Tolerance (ves Ino) Yes Ves
Casing Diameter(in)/Casina Length (ft) 2 6/3 3 26/36.2
NumberofBars IReinforcing BarSize 6 1 #6 6 1 # 6
Length of Reinforcing S te e I (ft) 41.00 41.40
_L:rlm-e D.rilling was c...orno.leted (am Lpm) . . -.- _.3 : 15?~ 3:4 5.P M '-:" ~----~ --:: _-cc..---cc-:- -= b:;;;_:::::-~.: -:.=-... ::=
~._.. - -.- ~ --._---_._----~---- ____ __,,_ ~~__"~___r
Tim e Con c re te was Pia c e d (am 1 pm) 5: 15 PM 5:25 PM
Depth of Pier From Top of Concrete (ft) 41.80 42.20
Elevation: Surface (ft).. 98.50 98.50
Elevation:Top of Pier (ft).. 98.00 98.00
Elevation: Bottom of Pier (ft).. 56.20 55.80
Elevation: Top of Bear in a Stratum (ft.)" 62.50 61 .80
Bearing Stratum (description) Blue sha Ie
Note: See report # 296710 for Compressive Strength Test Specimens.
'Additional Penetration not requested unless no Ie d. HE levation by others
Technician: Chris Harbour Started: 06:00am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) AlIn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell AlIn: Mr. Lee Stone
1-cc City of Coppell Alln: Mr. Larry Davis
Finished: 06:15pm Rone Engineering
P-~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(CH/JB) Page 4 of 4
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of In-Place Density Testing
Report No.: 296744
Project No.: 0712932
Date of Service: 08/24/2007
Report Date: 08/31/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Perform In-Place Density Testing
PROJECT DATA
Contractor: Duke Construction, LP
Test Method: ASTM D-6938
Gauge: Troxler 3430
Gauge Serial No: 35518
Test Mode: DT
Standard Counts
Moisture Density
Current: 731 Current: 2509
Previous: 729 Previous: 2515
MOISTURE DENSITY RELATIONS
Maximum
Moisture Density Project Requirements
MID No. Description % (pet) Moisture Density
294619 Lime Treated Brown 1 Silty Sandy Clay 32.7 87.0 Optimum +4 95 min
FIELD DENSITY TESTS
Test Probe MID Moisture Wet Density Dry Density Density
No Test Location Depth No. % (pet) (pet) (%max)
Cap
Building pad at grid line A.5/29 6" 294619 33.0 110.5 83.1 96
Cap
2 Building pad at grid line B.5/29 6" 294619 32.7 110.8 83.5 96
Cap
3 Building pad at grid line C.5/29 6" 294619 35.7 110.2 81.2 93*
Cap
4 Building pad at grid line D.5/29 6" 294619 35.0 112.6 83.4 96
Cap
5 Building pad at grid line E.5/29 6" 294619 35.1 113.2 83.8 96
Cap
6 Building pad at grid line F.5/29 6" 294619 35.1 109.7 81.2 93*
Cap
7 Building pad at grid line G.5/29 6" 294619 34.3 111.5 83.0 95
Cap
8 Building pad at grid line H.5/29 6" 294619 32.7 110.4 83.2 96
Cap
9 Building pad at grid line 1.5/29 6" 294619 33.5 110.5 82.8 95
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd.
(CH/LB) Page 1 of 2
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of In-Place Density Testing
Report No.: 296744
Project No.: 0712932
Date of Service: 08/24/2007
Report Date: 08/31/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Perform In-Place Density Testing
FIELD DENSITY TESTS
Test Probe MID Moisture Wet Density Dry Density Density
No Test Location Depth No. % (pct) (pct) (%max)
Cap
10 Building pad at grid line J.5/29 6" 294619 32.8 111.4 83.9 96
Cap
11 Retest of test 3 6" 294619 33.1 111.0 83.4 96
Cap
12 Retest of test 6 6" 294619 33.5 112.7 84.4 97
Cap
13 Retest of test 8 6" 294619 36.2 112.8 82.8 95
Ai1 ast::risk n appears next to results which do NOT meet the project specifications. ._.._-~~
Technician: Joe Jernigan
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Started: 09:30am Finished: 12:30pm
Rone Engineering
p~~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd
(CH/LB) Page 2 of 2