Loading...
Duke Lesley 2A-LR070830 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 296266 Project No.: 0712932 Date of Service: 08/21/2007 Report Date: 08/30/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): NA Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 . /""'\0 I fv1 8-23i ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7751 PW Placement Date: 08/21/2007 Weather Conditions: Partly cloudy, windy Time Sampled: 08:56am Batch time: 08:19am Temperature - Air: 840F Concrete: 910F Truck No: 141 Ticket No: 13096 Air Content: 1.9% Unit Weight (pet): NA Overall Placement Location: Building piers D, E, F, I, H/3, H, I, J/4, J/2, I, H, G/5, G, F/4 Measured Slump (inches) 6.25 Sample Location: Pier D/3 10' from bottom REPORT OF TESTS Cylinder Marked Date Set No. Tested 1 1 08/28/2007 2 09/18/2007 ... 09/18/2007 .~ 1 4 10/16/2007 Age (days) 7 Diameter (in) 6.00 28 28 56 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 98,350 Compressive Strength (psi) 3,480 Fracture Type Unbonded Cap Area (inZ) 28.27 Remarks: Pier J/2 placed, but will not be load-bearing due to incident during removal of case. Rone Engineering SOORep'rt296265f"teohOlci,"ttmep ~ ~ K. Scott Watson, AET Project Manager Technician: Chris Harbour Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Brian Pierce (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston. TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 296402 Project No.: 0712932 Date of Service: 08/22/2007 Report Date: 08/30/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3.000 psi @ 28 days Slump (in.): NA Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 - ----------- A-STM-C-.?31 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7751 PW Placement Date: 08/22/2007 Weather Conditions: Overcast Time Sampled: 01 :25pm Temperature - Air: 980F Truck No: 142 Air Content: 1.8% Overall Placement Location: Piers (see report #296401) Batch time: 12:54pm Concrete: 930F Ticket No: 13125 Unit Weight (pcf): NA Measured Slump (inches) 5.5 Sample Location: Pier B/5 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 08/29/2007 7 6.00 28.27 99,160 3,510 Unbonded Cap 1 2 09/19/2007 28 1 3 09/19/2007 28 4 10/17/2007 56 Technician: Chris Harbour Rone Engineering See Report 296401 for technician time'p ~ Report Distribution: .' ~ ----... Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne . . .. ....... . ..' .' ~ (1-ec copy) . . 1-cc Potter Concrete Attn: Mr. Ryan Skelly K Scott Watson AET 1-cc City of Coppell Attn: Mr. Lee Stone . p . t M . 1-cc City of Coppell AUn: Mr. Larry Davis roJec anager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd. (TM/LB) Page 1 of 1 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Pulverization/Gradation Testing Report No.: 296654 Project No.: 0712932 Date of Service: 08/23/2007 Report Date: 08/30/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Pulverization/Gradation Testing Report of Tests Specifications: passing passing 1/2" sieve #4 sieve 100% 60% A B C D E W e ig h t Percent We ig h t Percent Sam pie Retained Passing Retained Passing Location W e ig h t 1 1 /2 " S ie v e 1 1 /2 " S ie v e #4 S ie v e #4 S ie v e 1 Building pad, grid Ii n e A .5/27 1 1 .7 0 1 00% 4 .2 64.1 % ! 2 IBuolding PdQ,grlU lin e B .5/27 1 1 .9 l) 1 00% ".4 .. 63.0 % 3 Building pad,grid Ii n e c. 5/2 7 1 1 .3 0 1 00% 4.2 62.8 % 4 Building pad,grid Ii n e D .5127 1 1 .8 0 1 00% 4.3 63.5 % 5 Building pad, grid Ii n e E .5127 1 1 .5 0 1 00% 4.2 63.4 % 6 Building pad,grid Ii n e F .5/27 1 1 .5 0 1 00% 4.3 62.6 % 7 Building pad, grid line G .5/27 1 1 .0 0 100% 4.1 62.7% 8 Building pad,grid Ii n e H .5127 1 1 .0 0 100% 4.2 61.8% 9 Building pad,grid Ii n e 1.5/27 1 1 .1 0 1 00% 4.3 61.2 % 1 0 Building pad, grid lin e J.5/27 1 1 .4 0 1 00% 4.2 63.1 % Technician: Joe Jernigan Rone Engineering S"Report296653fOne'h"i'i,"lime~. ~~""" ". '.' Paul Byrne K. Scott Watson, AET Project Manager ~ Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Altn: Mr. (1-ec copy) 1-cc City of Coppell Altn: Mr. Lee Stone 1-cc City of Coppell Altn: Mr. Larry Davis LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/LB) Page 1 of 1