Loading...
WA9601B-CS01032883127/2881 11:48 214-361-0204 BAqBAR~ LOWE PaG~ 82/82 '"~" '~ ' -0204 Phon,{[214) 361-7900 City of Coppell Date: January 3, 2000 Post Office Box 478 Coppell, Texas 750H9-0478 Attention: Mr. Kenneth N, Griffin, P.E. StatementNo. 96150 (AR) SPECIAL SERVICES - REDESIGN OF SANDY LAKE ROAD WATERLINE Time of Personnel: Engineer 37.0 Hrs. $ 3.$21.84 Engineer in Training 15.0 Hrs. 1,086.44 AutoCAD Technician I 17.5 Hrs. 1,363.59 AuToCAD Technician II 57.0 Hrs. 3,284.20 Draftsman 3.0 Hrs. 51.7S Word Processor 3.0 Hrs. i24.23 Survey 39.0 Hrs. 2,iII.?l S-rvey 36.s ~rs. i. OOS.S9 os.o Hr,.S ,S4g.6S Special Supplies 6.93 Total Billed - 100% Complete $13,010.05/ Less Previous Payments _6,~00.O0v Total Amount Due $ 6,510.O5 214-361-0~0,4 SHIMEK, JACOBS & FINK. LEA, L.L.P. CONSULTING ENGINEERS 8333 Doughs Avenue, #820 Dallas, Texas ?-~225-5516 Fax (214) 361-020-4, Phone (.214) 361-7900 FAX TRANSMISSION COVER SHEET Fax Number: From: Gary C. Hendricks, P.E. ] Date: March 28, 2001 Number of Pages Transmitted (including this one) 2 To: Mr. genneth M. Griffin, P.E. Director of Engineering & Public 14'orks Cit~ of Coppell P. O. Box 478 Coppell, Texas 75019 Ken Attached the unpaad invmce in the amount of $6,510.05, dated January 3, 2000 for the re-design of the Sandy Lake Road Water Line. Please review your records to see xf we have misplaced the City's payment. If you have any questions, p~ do not hesitate to give me a call.