Loading...
Duke Lesley 2A-LR070824 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freldrlch, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Pulverization/Gradation Testing Report No.: 296454 Project No.: 0712932 Date of Service: 08/22/2007 Report Date: 08/24/2007 Project: Hemisphere's at Point West Cappell, Texas Services: Pulverization/Gradation Testing Report of Tests Specifications: passing passing 112" sieve #4 sieve 1 00% 60% A B C D E We ig h t Percent Weight Percent Sam pie Retained Passing Retained Passing Location We ig h t 1 1 12 " S ie v e 1 112 " S ie v e #4 S ie v e #4 S ie v e 1 Building pad,grid Ii n e s A .5/2 5 1 0 .6 0 100% 4.0 62.2 % " Building pad,grid Ii n e s B .5125 1 0 .0 0 100% 3 .8 62.0 % 3 Building pad,grid Ii n e S C .5/25 1 1 .0 0 1 00% 4.1 62.7% 4 Building pad, grid I I n e s 0.5/25 1 1 .2 0 1 00% 4.2 62.5 % 5 Building pad,grid Ii n e s E .5/25 1 0 .8 0 1 00% 4.2 61 .1 % 6 Building pad,grid Ii n e s F .5/25 1 0 .5 0 1 00% 4 .1 60.9 % 7 Building pad,grid I in e s G .5/25 1 1 .2 0 1 00% 4.2 62.5 % 8 Building pad,grid lin e s H .5/25 1 1 .5 0 1 00% 4.3 62.6 % 9 Building pad. grid I I n e s I. 5/2 5 1 0 .3 0 1 00% 3.9 62.1 % 1 0 Building pad,grid Ii n e s J .5/2 5 10.5 0 1 00% 4.1 60.9 % Technician: Joe Jernigan Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Brian Pierce (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Started: 01 :30pm Finished: 05:45pm Rone Engineering p~.~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/LB) Page 1 of 1 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Report No.: 296265 Project No.: 0712932 Date of Service: 08/21/2007 Report Date: 08/24/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Straight Shaft Pier Inspection Report of Inspection D rille r: A ua e r Pier Identification D 13 E/3 F 13 H 13 1/3 PierDiameter(in) 24 24 24 24 24 Depth of Pier From Surface (ft) 44.00 46.30 44.70 44.60 45.00 Depth of Bear in a Stratum Fro m S urfa ce (ft) 38.00 40.00 39.00 38.70 39.00 Reauired Penetration (ft) 5.00 5.00 5.00 5.00 5.00 A ctua I P e ne tra tio n (ft)- 6.00 6.30 5.70 5.90 6.00 Con d i ti 0 n 0 f Botto m (wet 1 dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes Ino) Yes Yes Yes Yes Yes .f.~~giameter (in) 1 Casing Length (ft) 26/37 26/39.5 26/37.8 2 6 13 8 2 613 8 .1 Numoer.oTBars) Reinforcing Bar Size 6 Tlfe 6 1 #6 6 1 #6 6/#6 6 1 # 6 Length of Reinforcing Steel (ft) 43.50 45.60 43.50 43.50 43.90 Time DrillinCl was Completed (am 1 pm) 7:53 AM 8:21 AM 8:46 AM 9 :2 7 AM 10:15 AM Time Concrete was Placed (am Ipm) 8:54 AM 9 :5 0 AM 1 0 :4 0 A M 11:25AM 12:50 PM Depth of Pier From Top of Concrete (ft) 41.00 46.00 44.40 44.10 44.40 E Ie va tio n: S urfa ce (ft).. 99.50 99.50 99.50 99.50 99.50 Elevation: Top of Pier (ft)-- 96.50 99.20 99.20 99.00 98.90 Elevation: Bottom of Pier (ft)" 5 5.50 53.20 54.80 54.90 54.50 E Ie va Ii 0 n: Top of BearinCl Stratum (ft.) .. 61 .50 59.50 60.50 60.80 60.50 Bearina Stratum (description) Gray Shale Note: See report# NA for Compressive Strength TestSpecimens. _ Additional Penetration not requested unless noted. "Elevation by others L1Mrr A TIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance. etc.) or any other feature of similar SUbject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exciusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 1 of 3 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Report No.: 296265 Project No.: 0712932 Date of Service: 08/21/2007 Report Date: 08/24/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Straight Shaft Pier Inspection Driller: A ug e r Pier Identification J/4 1/4 H/4 J/2 1/5 Pier Diameter (in) 24 24 24 24 24 Death of Pier From Surface (ft) 42.00 42.30 44.10 43.50 41.30 Deoth of Bear in a Stratum From Surface (ft) 35.70 36.30 37.50 37.00 36.30 Reauired Penetration (ft) 5.00 5.00 5.00 5.00 5.00 A ctua I P e netra tio n (ft)" 6.30 6.00 6.60 6.50 5.00 Condition of Bottom (wet/drv) Dry Drv D rv Drv Drv Plumb Within Tolerance (ves I no) Yes Yes Yes Yes Yes Casino Diameter (in) I Casina Length (ft) 26/35.5 26/36.3 26/37.3 26/36.8 26 Number of Bars I Reinforcina Bar Size 6 1#6 6 1#6 6 1#6 6 1#6 6 1#6 Lenath of Reinforcina Steel (ft) 41.00 40.50 43.10 42.50 40.40 'Time Drillina was Comoleted (am Ipm) 1 0:42 AM 11:26AM 12:20 PM 1 : 1 9 PM n m - - - 2;.0 O.P M Time Concrete was Placed (am 10m) 1 :20 PM 1 :45 PM 2:05 PM cr ., (') (') 'C (') (') 3:50 PM !!. '" '0 ., ;:r ., ~ lJ: ::J '0 0 ., .. 0 Deoth of Pier From Too of Concrete (ft) 0 <0 <0 a ::J ::J :;- CD 5" ::J 41.60 42.00 43.80 ~ CD :;' iil )( '" <0 <0 0. <0 (') 40.90 3 '" CD ., '" 0. !!. ;;0. cr ::J g:. !'! ., ~ :;' 0 '" " Elevation: Surface (ft)"' 99.50 99.50 99.50 0' '< 5' 0 0' 99.50 '" ::J ~% (') a iil 0 <0 0 0 ::J CD ;;; ::J :;' " E leva tio n: To 0 of Pier (fO" 99.10 99.20 99.20 "" 5' 0. '" ::> (') 0 <:: - c: 99.10 '" ~ @. ~ O:! '" CD CD '" (') -< ::J ;:r <> 0. Elevation: Bottom of Pier (m" ., !l ~ 0 1> 0 .. 57.50 57.20 55.40 ., <: <:: 58.20 !l o' cr !; .... !!!. ~ c: !!. g' ::> ~ !!!. ~ g' ::J 0' :;' Elevation: Too ofBearino Stratum (fU"' 63.80 63.20 62.00 CD <0 '" 63.20 Be a rina S tra tum (d e s criptio n) Grav Shale Note: See report # NA for Compressive Strength Test Specimens. " Additional Penetration not requested unless noted. HE levation by others LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 2 of 3 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Drilled Pier Inspection Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report No.: 296265 Project No.: 0712932 Date of Service: 08/21/2007 Report Date: 08/24/2007 Project: Hemisphere's at Paint West Cappell, Texas Services: Straight Shaft Pier Inspection D rille r: Auoer Pie r Id e n ti fi c a ti 0 n H /5 G/5 G /4 F /4 PierDiameter(in) 24 24 24 24 De p th 0 f P ie r Fro m Surface (ft) 43.7.0 43.7.0 43.8.0 41..0 .0 Depth of Bear in a Stratum Fro m Surface(ft) 37.5.0 37..0 .0 37.5.0 35.2.0 Required Penetration (ft) 5..0 .0 5..0 .0 5..0 .0 5..0 .0 A ctua I P e ne tra tio n (ft)" 6.2.0 6.7.0 6.3.0 5.8.0 Condition of Bottom (wet / dry) Dry Dry Dry Dry Plum b Within Tolerance (yes / no) Yes Yes Yes Yes Casino Diameter(in)/Casina Lenath (ft) 26/37.5 2 6 /3 6 .4 26/36.5 26/39.2 NumberofBars IReinforcing BarSize 6 / #6 6 / #6 6 / #6 6 1 # 6 Length of Reinforcing Steel (ft) 42.7.0 42.6.0 42.6.0 4.0..0 .0 .ILm e 0 ril!j_~<\{,9 LG.. 0 m pie te d (a m I p tl'-'-'--__ 2:46 PM 3:18.P~ 4:.0..0 PM 4 ~3 .0 P M ---- _...~ Time Concrete was Placed (am Ipm) 4 :3.0 P M 5:15 PM 6 :3.0 PM 6 :4 5 P M Depth of Pier From Top 0 f Con c re te (ft) 43.4.0 43.3.0 43.5.0 4.0.7.0 Elevation: Surface (ft)-- 99.5.0 99.5.0 99.5.0 99.5.0 Elevation: Top of Pier (ft).. 99.2.0 99.1.0 99.2.0 99.2.0 Elevation: Bottom of Pier (ft).. 55.8.0 55.8.0 55.7.0 58.5.0 Elevation: Top of Bear in a Stratum (ft.)" . 62..0 .0 62.5.0 62..0.0 64.3.0 Bearino Stratum (d e scriptio n) GrayShale Note: See report # NA fo r Com pre s s ive S t re n 9 t h T e s I S pee i men s . * Additional Penetration not requested unless noted. HE levation by others Technician: Chris Harbour Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Alln: Mr. Brian Pierce (1-ec copy) 1-cc City of Coppell Alln: Mr. Lee Stone 1-cc City of Coppell Alln: Mr. Larry Davis K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 3 of 3 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 295534 Project No.: 0712932 Date of Service: 08/14/2007 Report Date: 08/24/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 3,000 psi @28 days Slump (in.): 5" - 7" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 7751 PW Placement Date: 08/14/2007 Weather Conditions: Clear Time Sampled: 12:15pm Temperature - Air: 1000F Truck No: 104 Air Content: NA Overall Placement Location: Drilled piers B12, C12, 0/2, El2, F12, G/2, K/3, H/2, J12, K/2 Measured Slump (inches) 6.0 Batch time: 11:41 am Concrete: 960F Ticket No: 13053 Unit Weight (pcf): NA Sample Location: Grid lines A/1, H/2, GI2 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (inZ) (Ibs) (psi) Type 1 1 08/21/2007 7 6.00 28.27 73,650 2,600 Unbonded Cap 1 2 09/11/2007 28 1 3 09/11/2007 28 4 10/09/2007 56 Technician: Alejandro Avendano Rone Engineering See Report 295533 for technician time~ ~ Report Distribution: ~ Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne . . .. . .. . .. ... (1-ec copy) 1-cc P?tter Concrete Attn: Mr. Ryan Skelly K. Scott Watson, AET 1-cc City of Coppell Attn: Mr. Lee Stone. Pro'ect Mana er 1-cc City of Coppell Attn: Mr. Larry DaVIS j 9 ~ LIMITATIONS: The test results presented herein were prepared based upon the specifIC samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reprodUCed except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 1 of 1 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of In-Place Density Testing Report No.: 296452 Project No.: 0712932 Date of Service: 08/22/2007 Report Date: 08/24/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Perform In-Place Density Testing PROJECT DATA Contractor: Duke Construction, LP Test Method: ASTM 0-6938 Gauge: Troxler 3430 Gauge Serial No: 35518 Test Mode: DT Standard Counts Moisture Density Current: 728 Current: 2501 Previous: 733 Previous: 2509 MOISTURE DENSITY RELATIONS MID No. 294619 272998 Description Lime Treated Brown I Silty Sandy Clay Brown / Silty Clay wI Organics Moisture % Maximum Density (pet) 87.0 96.5 Project Requirements Moisture Density Optimum +4 95 minimum Minimum +4 92-96- 32.7 -22.5 FIELD DENSITY TESTS Test Probe MID Moisture Wet Density Dry Density Density No Test Location Depth No. % (pet) (pet) (%max) Utility backfill 6" Sanitary sewer line, west side, 50' from north 6" 272998 31.1 116.0 88.5 92 end, final Utility backfill 2 6" Sanitary sewer line, west side, 250' from 6" 272998 31.6 115.4 87.7 91* north end, l' below grade Utility backfill 3 6" Sanitary sewer line, west side, 250' from 6" 272998 29.9 116.3 89.5 93 north end, final Utility backfill 4 Retest of test 2 6" 272998 29.5 116.3 89.8 93 Cap 5 Building pad at grid line A.5/25 6" 294619 33.0 110.5 83.1 96 Cap 6 Building pad at grid line B.5/25 6" 294619 32.7 110.8 83.5 96 Cap 7 Building pad at grid line C.5/25 6" 294619 35.0 112.6 83.4 96 Cap 8 Building pad at grid line D.5/25 6" 294619 35.1 113.2 83.8 96 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 1 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of In-Place Density Testing Report No.: 296452 Project No.: 0712932 Date of Service: 08/22/2007 Report Date: 08/24/2007 Project: Hemisphere's at Point West Cappell, Texas Services: Perform In-Place Density Testing FIELD DENSITY TESTS Test Probe MID Moisture Wet Density Dry Density Density No Test Location Depth No. % (pet) (pet) (% max) Cap 9 Building pad at grid line E.5/23 6" 294619 35.1 109.7 81.2 93* Cap 10 Building pad at grid line F .5/23 6" 294619 34.3 111.5 83.0 95 Cap 11 Building pad at grid line 8.5/23 6" 294619 33.5 110.5 82.8 95 Cap 12 Building pad at grid line H.5/23 6" 294619 32.8 111.4 83.9 96 Cap 13 Building pad at grid line 1.5/23 6" 294619 33.1 111.0 83.4 96 Cap 14 Building pad at grid line J.5/23 6" 294619 35.5 113.8 84.0 97 Cap 15 Retest of test 9 6" 294619 33.5 112.7 84.4 97 An asterisk (*) appears next to results which do NOT meet the project specifications. Technician: Joe Jernigan Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Brian Pierce (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Started: 10:00am Finished: 01:15pm Rone Engineering P-ad-..~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LBfLB) Page 2 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of In-Place Density Testing Report No.: 296316 Project No.: 0712932 Date of Service: 08/21/2007 Report Date: 08/24/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Perform In-Place Density Testing PROJECT DATA Contractor: Duke Construction, LP Test Method: ASTM D-6938 Gauge: Troxler 3430 Gauge Serial No: 35518 Test Mode: DT Standard Counts Moisture Density Current: 732 Current: 2512 Previous: 736 Previous: 2508 MOISTURE DENSITY RELATIONS Maximum Moisture Density Project Requirements MID No. Description % (pet) Moisture Density 294619 Lime Treated Brown I Silty Sandy Clay 32.7 87.0 Optimum +4 95 min FIELD DENSITY TESTS Test Probe MID Moisture Wet Density Dry Density Density No Test Location Depth No. % (pet) (pet) (%max) Cap Building pad at grid line A.5/23 6" 294619 32.8 114.6 86.3 99 Cap 2 Building pad at grid line B.5/23 6" 294619 32.9 114.2 85.9 99 Cap 3 Building pad at grid line C.5/23 6" 294619 33.8 114.4 85.5 98 Cap 4 Building pad at grid line D.5/23 6" 294619 33.9 114.6 85.6 98 Cap 5 Building pad at grid line E.5/23 6" 294619 33.1 114.9 86.3 99 Cap 6 Building pad at grid line F.5/23 6" 294619 33.8 114.3 85.4 98 Cap 7 Building pad at grid line G.5/23 6" 294619 32.9 114.8 86.4 99 Cap 8 Building pad at grid line H.5/23 6" 294619 33.3 113.7 85.3 98 Cap 9 Building pad at grid line 1.5/23 6" 294619 32.9 114.7 86.3 99 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 1 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of In-Place Density Testing Report No.: 296316 Project No.: 0712932 Date of Service: 08/21/2007 Report Date: 08/24/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Perform In-Place Density Testing FIELD DENSITY TESTS Test Probe MID Moisture Wet Density Dry Density Density No Test Location Depth No. % (pcf) (pcf) (%max) Cap 10 Building pad at grid line J.5/23 6" 294619 33.4 115.7 86.7 100 Technician: Joe Jernigan Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Brian Pierce (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Started: 11 :30am Finished: 02:00pm Rone Engineering p~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LBILB) Page 2 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214)630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of In-Place Density Testing Report No.: 296187 Project No.: 0712932 Date of Service: 08/20/2007 Report Date: 08/24/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Perform In-Place Density Testing PROJECT DATA Contractor: Duke Construction, LP Test Method: ASTM 0-6938 Gauge: Troxler 3430 Gauge Serial No: 35518 Test Mode: DT Standard Counts Moisture Density Current: 732 Current: 2512 Previous: 736 Previous: 2508 MOISTURE DENSITY RELATIONS Maximum Moisture Density Project Requirements MID No. Description % (pet) Moisture Density 294619 Lime Treated Brown 1 Silty Sandy Clay 32.7 87.0 Optimum +4 95min FIELD DENSITY TESTS Test Probe MID Moisture Wet Density Dry Density Density No Test Location Depth No. % (pet) (pet) (% max) Cap Building pad at grid line A.5/21 6" 294619 35.5 113.8 84.0 97 Cap 2 Building pad at grid line B.5/21 6" 294619 33.5 112.7 84.4 97 Cap 3 Building pad at grid line C.5/21 6" 294619 35.2 113.3 83.8 96 Cap 4 Building pad at grid line D.5/21 6" 294619 34.7 113.4 84.2 97 Cap 5 Building pad at grid line E.5/21 6" 294619 33.5 113.5 85.0 98 Cap 6 Building pad at grid line F.5/21 6" 294619 35.6 114.0 84.1 97 Cap 7 Building pad at grid line G.5/21 6" 294619 35.3 113.1 83.6 96 Cap 8 Building pad at grid line H.5/21 6" 294619 33.2 114.4 85.9 99 Cap 9 Building pad at grid line 1.5/21 6" 294619 33.0 111.7 84.0 97 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 1 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of In-Place Density Testing Report No.: 296187 Project No.: 0712932 Date of Service: 08/20/2007 Report Date: 08/24/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Perform In-Place Density Testing FIELD DENSITY TESTS Test Probe MID Moisture Wet Density Dry Density Density No Test Location Depth No. % (pet) (pet) (%max) Cap 10 Building pad at grid line J.5/21 6" 294619 34.0 111.9 83.5 96 Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Brian Pierce (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Rone Engineering s" R'port 296186 focl,"'";oao t;~ P-~ ~ K. Scoll Watson, AET Project Manager Technician: Joe Jernigan LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 2 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Pulverization/Gradation Testing Report No.: 296317 Project No.: 0712932 Date of Service: 08/21/2007 Report Date: 08/24/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Pulverization/Gradation Testing Report of Tests S p e c ific a tio n s : passing passing 112" sieve #4 sieve 1 00% 60% A B C 0 E W e ig h t Percent We ig h t Percent Sam pie Retained Passing Retained Passing Location W e ig h t 1 112" Sieve 1 112 " S ie v e #4 S ie v e #4 S ie v e 1 Building pad,grid Ii n e s A .5/2 3 1 1 .1 0 1 00% 4.2 62.1 % 2 Building pad,grid Ii n e s B .5/23 1 0 .2 0 1 00% 4.0 60.7% 3 Building pad, grid Ii n e s C .5123 1 0 .5 0 100% 4 .1 60.9 % 4 Building pad,grid Ii n e s D .5/23 1 0 .9 0 100% 4.2 61 .4 % 5 Building pad,grid Ii n e s E .5/23 1 1 .0 0 1 00% 4.3 60.9 % 6 Building pad, grid lines F .5/23 1 0 .4 0 1 00% 4.1 60.5 % 7 Building pad, grid Ii n e s G .5123 1 0 .5 0 1 00% 4.2 60.0 % 8 Building pad,grid lin es H .5/23 1 0 .5 0 1 00% 4.0 61 .9 % 9 Building pad,grid Ii n e s I. 5/23 1 1 .0 0 1 00% 4.3 60.9 % 1 0 Building pad,grid lin e s J .5/2 3 1 0 .8 0 1 00% 4.2 61 .1 % Technician: Joe Jernigan Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Brian Pierce (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Started: 02:30pm Finished: 05:45pm Rone Engineering p@-~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMfLB) Page 1 of 1 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Rone Engineering - Report of Concrete Compressive Strength Tes1 Report No.: 295534 Project No.: 0712932 Date of Service: 08/14/2007 Report Date: 08/24/2007 Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Client: Hemisphere's at Point West as Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring sampleE back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Measured Slump (inches) 6.0 Mix Design 1.0.: 7751 PW Placement Date: 08/14/2007 Weat:~er Conditions: Clear Time Sampled: 12:15pm Temperature - Air: 1000F Truck No: 104 Air Content: NA Overall Placement Location: Drilled piers 812, C/2, D/2, E/2, F/2, G/2, 1<13, H/2, J/2, 1<12 \ Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" - 7" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Batch time: 11 :41 am Concrete: 960F Ticket No: 13053 Unit Weight (pet): NA Sample Location: Grid lines A/1, H/2, G/2 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 73,650 Compressive Strength (psi) 2,600 Cylinder Marked Date Set No. Tested - - 1 1 08/21/2007 1 2 09/11/2007 1 3 09/11/2007 1 4 10/09/2007 Fracture Type Unbonded Cap Area (in') 28.27 Diameter (in) 6.00 Age (days) 7 n/~ 28 28 56 Technician: Alejandro Avendano See Report 295533 for technician time Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Brian Pierce (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis 111t/~1 LIMITATIONS: The lest results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB) Page 1 of 1