Loading...
Duke Lesley 2A-LR070822 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 295658 Project No.: 0712932 Date of Service: 08/15/2007 Report Date: 08/22/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" - 7" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7751PW Placement Date: 08/15/2007 Weather Conditions: Sunny Time Sampled: 02:52pm Temperature - Air: 1000F Truck No: 132 Air Content: NA Overall Placement Location: Drilled piers K/5, H/3 and C/3 Batch time: 02: 16pm Concrete: 980F Ticket No: 13075 Unit Weight (pet): NA Measured Slump (inches) 6.0 Sample Location: Same as above REPORT OF TESTS Technician: Alejandro Avendano Rone Engineering See Report 295657 for technician time~~ Report Distribution: '. . . Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne ... '.. ..' ...... ..' (1-ec copy) .- 1-cc Potter Concrete Attn: Mr. Ryan Skelly K S tt w t AET 1 C'ty f C II Att M L St . co a son, -cc I 0 oppe n: r. ee one. Project Manager 1-cc City of Coppell Attn: Mr. Larry DaVIS Cylinder Marked Date Set No. Tested 1 1 08/22/2007 1 2 09/12/2007 1 3 09/12/2007 1 4 10/10/2007 Age (days) 7 Diameter (in) 6.00 28 28 56 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 75,250 Compressive Strength (psi) 2,660 Fracture Type Unbonded Cap Area (in2) 28.27 ..~ LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 1 of 1 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of In-Place Density Testing Report No.: 296087 Project No.: 0712932 Date of Service: 08/17/2007 Report Date: 08/22/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Perform In-Place Density Testing PROJECT DATA Contractor: Duke Construction, LP Test Method: ASTM D-6938 Gauge: Troxler 3430 Gauge Serial No: 35518 Test Mode: DT Standard Counts Moisture Density Current: 736 Current: 2508 Previous: 730 Previous: 2494 MOISTURE DENSITY RELATIONS Maximum Moisture Density Project Requirements MID No. Description % (pet) Moisture Density 294619 Lime Treated Brown 1 Silty Sandy Clay 32.7 87.0 Optimum +4 95 min FIELD DENSITY TESTS Test Probe MID Moisture Wet Density Dry Density Density No Test Location Depth No. % (pet) (pet) (%max) Cap Building pad at grid line A.5/17 6" 294619 34.0 111.9 83.5 96 Cap 2 Building pad at grid line B.5/17 6" 294619 33.2 114.3 85.8 99 Cap 3 Building pad at grid line C.5/17 6" 294619 32.7 112.7 84.9 98 Cap 4 Building pad at grid line D.5/17 6" 294619 33.0 112.8 84.8 98 Cap 5 Building pad at grid line E.5/17 6" 294619 33.0 111.7 84.0 97 Cap 6 Building pad at grid line F .5/17 6" 294619 33.0 110.5 83.1 96 Cap 7 Building pad at grid line G.5/17 6" 294619 32.7 110.8 83.5 96 Cap 8 Building pad at grid line H.5/17 6" 294619 35.7 110.2 81.2 93* Cap 9 Building pad at grid line 1.5/17 6" 294619 33.1 114.9 86.3 99 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LBILB) Page 1 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of In-Place Density Testing Report No.: 296087 Project No.: 0712932 Date of Service: 08/17/2007 Report Date: 08/22/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Perform In-Place Density Testing FIELD DENSITY TESTS Test Probe MID Moisture Wet Density Dry Density Density No Test Location Depth No. % (pet) (pet) (% max) Cap 10 Building pad at grid line J.5/17 6" 294619 33.8 114.3 85.4 98 Cap 11 Building pad at grid line A.5/19 6" 294619 32.8 111.4 83.9 96 Cap 12 Building pad at grid line B.5/19 6" 294619 32.9 111.0 83.5 96 Cap 13 Building pad at grid line C.5/19 6" 294619 33.0 111.3 83.7 96 Cap 14 Building pad at grid line 0.5/19 6" 294619 33.4 111.5 83.6 96 Cap 15 Building pad at grid line E.5/19 6" 294619 33.7 111.9 83.7 96 Cap 16 Building pad at grid line F.5/19 6" 294619 33.0 111.7 84.0 97 Cap 17 Building pad at grid line G.5/19 6" 294619 32.8 114.6 86.3 99 Cap 18 Building pad at grid line H.5/19 6" 294619 32.9 114.2 85.9 99 Cap 19 Building pad at grid line 1.5/19 6" 294619 33.8 114.4 85.5 98 Cap 20 Building pad at grid line J.5/19 6" 294619 33.9 114.6 85.6 98 Cap 21 Retest of test 8 6" 294619 33.1 111.0 83.4 96 An asterisk (*) appears next to results which do NOT meet the project specifications. Technician: Joe Jernigan Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Brian Pierce (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Started: 09:15am Finished: 04:45pm Rone Engineering p~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd. (LBfLB) Page 2 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Pulverization/Gradation Testing Report No.: 296186 Project No.: 0712932 Date of Service: 08/20/2007 Report Date: 08/22/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Pulverization/Gradation Testing Report of Tests 1 00% 60% Specifications: passing passing 112" sieve #4 sieve A B C D E We ig h t Percent W e ig h t Percent Sam pie Retained Passing Retained Passing Location We ig h t 1 1 12 " S ie v e 1 1 12 " S ie v e #4 S ie v e #4 S ie v e 1 Building pad, grid lin e A.5121 1 1 .6 0 1 00% 4.5 61.2 % 2 Building pad, grid IineB.5121 1 1 .0 0 1 00% 4.1 62.7% 3 Building pad, grid lineC.5121 1 1 .4 0 1 00% 4.2 63.1 % 4 Building pad, grid I in e 0.5121 1 0 .9 0 1 00% 4.1 62.3 % 5 Building pad, grid Ii n e E .5121 1 1 .3 0 1 00% 4.3 61.9 % 6 Building pad,grid Ii n e F .5121 1 1 .0 0 1 00% 4.2 61 .8 % 7 Building pad, grid I in e G .5121 1 1 .0 0 1 00% 4.3 60.9 % 8 Building pad, grid I in e H .5121 1 1 .3 0 1 00% 4.4 61 .0 % 9 Building pad, grid Ii n e I. 5121 1 1 .0 0 100% 4.2 61 .8 % 1 0 Building pad, grid line J.5121 1 1 .2 0 100% 4.4 60.7% Technician: Joe Jernigan Report Distribution: Orig: Duke Construction, LP (Dallas, TX) AUn: Mr. Brian Pierce (1-ec copy) 1-cc City of Coppell AUn: Mr. Lee Stone 1-cc City of Coppell AUn: Mr. Larry Davis Started: 02:15pm Finished: 05:15pm Rone Engineering p-p~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMlLB) Page 1 of 1