Loading...
Duke Lesley 2A-LR070818 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of In-Place Density Testing Report No.: 295214 Project No.: 0712932 Date of Service: 08/10/2007 Report Date: 08/18/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Perform In-Place Density Testing PROJECT DATA Contractor: Duke Construction, LP Test Method: ASTM D-6938 Gauge: Troxler 3430 Gauge Serial No: 35518 Test Mode: DT Standard Counts Moisture Density Current: NA Current: NA Previous: NA Previous: NA MOISTURE DENSITY RELATIONS Maximum Moisture Density Project Requirements MID No. Description % (pet) Moisture Density 294619 Lime Treated Brown I Silty Sandy Clay 32.7 87.0 Optimum +4 95min 272998 Brown I Silty Clay wI Organics 22.5 96.5 Optimum +4 95min FIELD DENSITY TESTS Test Probe MID Moisture Wet Density Dry Density Density No Test Location Depth No. % (pet) (pet) (% max) Utility backfill 12" Water line W-1. Station 30+00, 2' below 6" 272998 24.1 117.5 94.7 98 grade Utility backfill 2 12" Water line W-1, Station 30+00, final 6" 272998 22.7 117.4 95.7 99 Utility backfill 3 12" Water line W-1, Station 27+00, 2' below 6" 272998 24.2 117.1 94.3 98 grade Utility backfill 4 12" Water line W-1, Station 27+00, final 6" 272998 24.8 116.9 93.7 97 Cap 5 Lime-treated cap, grid line 1.5/5 6" 294619 32.2* 115.5 87.4 101 Cap 6 Lime-treated cap, grid line J.5/5 6" 294619 31.1 * 114.6 87.4 101 Cap 7 Retest of test 5 6" 294619 33.1 114.9 86.3 99 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 1 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of In-Place Density Testing Report No.: 295849 Project No.: 0712932 Date of Service: 08/16/2007 Report Date: 08/18/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Perform In-Place Density Testing PROJECT DATA Contractor: Duke Construction, LP Test Method: ASTM D-6938 Gauge: Troxler 3430 Gauge Serial No: 35518 Test Mode: DT Standard Counts Moisture Density Current: 730 Current: 2494 Previous: 739 Previous: 2510 MOISTURE DENSITY RELATIONS Maximum Moisture Density Project Requirements MID No. Description % (pct) Moisture Density 294619 Lime Treated Brown 1 Silty Sandy Clay 32.7 87.0 Optimum +4 95 min 27?998 Brown.' Silty Clay wf Organics 22.5 - 96 .,'}_ _ . Optimum +4 95 min FIELD DENSITY TESTS Test Probe MID Moisture Wet Density Dry Density Density No Test Location Depth No. % (pet) (pet) (%max) - Cap Building pad, grid lines A.5/13 6" 294619 35.0 112.6 83.4 96 Cap 2 Building pad, grid lines B.5/13 6" 294619 35.1 113.2 83.8 96 Cap 3 Building pad, grid lines C.5/13 6" 294619 34.3 111.5 83.0 95 Cap 4 Building pad, grid lines 0.5/13 6" 294619 33.5 110.5 82.8 95 Cap 5 Building pad, grid lines E.5/13 6" 294619 32.8 111.4 83.9 96 Cap 6 Building pad, grid lines F.5/13 6" 294619 33.1 111.0 83.4 96 Cap 7 Building pad, grid lines G.5/13 6" 294619 33.0 112.1 84.3 97 Cap 8 Building pad, grid lines H.5/13 6" 294619 33.0 112.8 84.8 98 Cap 9 Building pad, grid lines 1.5/13 6" 294619 33.0 111.7 84.0 97 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMILB) Page 1 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of In-Place Density Testing Report No.: 295849 Project No.: 0712932 Date of Service: 08/16/2007 Report Date: 08/18/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Perform In-Place Density Testing FIELD DENSITY TESTS Test Probe MID Moisture Wet Density Dry Density Density No Test Location Depth No. % (pet) (pet) (%max) Cap 10 Building pad, grid lines J.5/13 6" 294619 32.9 114.8 86.4 99 Utility backfill 11 12" water line W-1, Station 3+00, 2' below 6" 272998 22.6 116.6 95.1 99 grade Utility backfill 12 12" water line W-1, Station 3+00, final 6" 272998 24.1 116.4 93.8 97 Utility backfill ____13 12~ water line W-1, Station 0+50, 2' below 6" 272998 23.7 116.3 94.0 97 grade - Utility backfill 14 12" water line W-1 , Station 0+50, final 6" 272998 22.9 116.4 94.7 98 Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Brian Pierce (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Rone Engineering See R'port 295848 fo,f"ho"'oo f;mo pp ~ K. Scott Watson, AET Project Manager Technician: Joe Jernigan LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/LB) Page 2 of 2 Rone Engineering ... 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Cancellation Report No.: 295799 Project No.: 0712932 Date of Service: 08/16/2007 Report Date: 08/18/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Drilled Pier Inspection Cancellation Report of Cancellation On this date a Rone Engineering Services, Ltd. representative arrived on site as scheduled. Upon arrival, our representative was informed that testing/inspection was cancelled for the day. Technician: Alejandro Avendano Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Brian Pierce (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Started: 06:15am Finished: 08:00am Rone Engineering p~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar SUbject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMILB) Page 1 of 1