Duke Lesley 2A-LR070817
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of In-Place Density Testing
Report No.: 294618
Project No.: 0712932
Date of Service: 08/06/2007
Report Date: 08/17/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Perform In-Place Density Testing
PROJECT DATA
Contractor: Duke Construction, LP
Test Method: ASTM 0-6938
Gauge: Troxler 3430
Gauge Serial No: 35518
Test Mode: DT
Standard Counts
Moisture Density
Current: 734 Current: 2514
Previous: 738 Previous: 2527
MOISTURE DENSITY RELATIONS
MID No.
272998
Description
Brown I Silty Clay wI Organics
Moisture
%
Maximum
Density
(pet)
96.5
Project Requirements
Moisture Density
Optimum +4 95 min
22.5
FIELD DENSITY TESTS
Test Probe MID Moisture Wet Density Dry Density Density
No Test Location Depth No. % (pet) (pet) (%max)
-
Utility backfill
1 Storm drain SO-2, Station 8+30 6" 272998 23.1 116.3 94.5 98
Utility backfill
2 Storm drain SO-2, Station 12+30 6" 272998 24.5 116.8 93.8 97
Utility backfill
3 Storm drain SO-2, Station 14+00 6" 272998 24.7 116.0 93.0 96
Technician: Joe Jernigan Rone Engineering
See Report 294617 for technician time~~
Report Distribution: . .
0""0 D"ke C,",truoUoo. LP (D.,,",. TX) Att" Me p", Byrne , . . - - u -
(1-ec copy) . .
1-cc City of Coppell Attn: Mr. Lee Stone K. Scott Watson AET
1-cc City of Coppell Attn: Mr. Larry Davis Project Manager
~
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 1 of 1
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Pulverization/Gradation Testing
Report No.: 295766
Project No.: 0712932
Date of Service: 08/15/2007
Report Date: 08/17/2007
Project: Hemisphere's at Point West
Cappell, Texas
Services: Pulverization/Gradation Testing
Report of Tests
S p e c ific a tio n s :
passing
passing
1/2" sieve
#4 sieve
1 00%
60%
A B C D E
We ig h t Percent W e ig h t Percent
5 amp Ie Retained Passing Retained Passing
Location W e ig h t 1 1 /2 " S ie v e 1 1 /2 " S ie v e #4 S ie v e #4 S ie v e
1 Building pad, grid I in e s A .5/11 1 0 .4 0 100% 3.9 62.5 %
2 Building pad, grid lin e s B .5/11 1 0 .0 0 100 % 3.8 62.0%
3 Building pad, grid lines C .5/11 1 0 .0 0 1 00% 4.0 60.0 %
4 Building pad,grid Ii n e s D .5/11 1 0 . 7 0 1 00% 4.1 61 .6 %
5 Building pad, grid Ii n e s E .5/11 1 1 .0 0 1 00% 4.4 60.0 %
6 Building pad, grid Ii n e s F .5/11 1 0 .9 0 1 00% 4.2 61 .4 %
7 Building pad,grid Ii n e s G .5/11 1 2.5 0 1 00% 4.6 60.0 %
8 Building pad,grid Ii n e s H .5/11 1 1 .0 0 1 00% 4.3 60.9 %
9 Building pad, grid Ii n e s I. 5/11 1 0 .0 0 1 00% 3.7 63.0 %
1 0 Building pad,grid I in e s J .5/11 1 0 .0 0 1 00% 3.8 62.0 %
Technician: Joe Jernigan Rone Engineering
See Report 295765 for technician time~~
Report Distribution:
0"", 0", Co",'mctloo. LP (Da""'. TX) Att" M'. p", Byme . ........ .' '. .
(1-ec copy) .
1-cc City of Coppell Attn: Mr. Lee Stone K. Scott Watson AET
1-cc City of Coppell Attn: Mr. Larry Davis Project Manager
~
L1MITA nONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 1 of 1
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of In-Place Density Testing
Report No.: 294969
Project No.: 0712932
Date of Service: 08/08/2007
Report Date: 08/17/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Perform In-Place Density Testing
PROJECT DATA
Contractor: Duke Construction, LP
Test Method: ASTM D-6938
Gauge: Troxler 3430
Gauge Serial No: 35518
Test Mode: DT
Standard Counts
Moisture Density
Current: 737 Current: 2502
Previous: 732 Previous: 2508
MOISTURE DENSITY RELATIONS
Maximum
Moisture Density Project Requirements
MID No. Description % (pet) Moisture Density
294619 Lime Treated Brown 1 Silty Sandy Clay 32.7 87.0 Optimum +4 95 min
FIELD DENSITY TESTS
Test Probe MID Moisture Wet Density Dry Density Density
No Test Location Depth No. % (pet) (pet) (%max)
Subgrade
Building pad at grid line A.5/1 6" 294619 33.6 112.2 84.0 97
Subgrade
2 Building pad at grid line B.5/1 6" 294619 34.1 112.2 83.7 96
Subgrade
3 Building pad at grid line C.5/1 6" 294619 33.5 112.8 84.5 97
Subgrade
4 Building pad at grid line D.5/1 6" 294619 33.9 112.5 84.0 97
Subgrade
5 Building pad at grid line E.5/1 6" 294619 33.1 112.3 84.4 97
Subgrad&
6 Building pad at grid line F .5/1 6" 294619 33.7 111.9 83.7 96
Subgrade
7 Building pad at grid line G.5/1 6" 294619 32.8 114.6 86.3 99
Subgrade
8 Building pad at grid line H.5/1 6" 294619 33.8 114.3 85.4 98
Subgrade
9 Building pad at grid line 1.5/1 6" 294619 33.1 114.9 86.3 99
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 1 of 2
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of In-Place Density Testing
Report No.: 294969
Project No.: 0712932
Date of Service: 08/08/2007
Report Date: 08/17/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Perform In-Place Density Testing
FIELD DENSITY TESTS
Test Probe MID Moisture Wet Density Dry Density Density
No Test Location Depth No. % (pet) (pet) (% max)
Subgrade
10 Building pad at grid line J.5/1 6" 294619 33.9 114.6 85.6 98
Technician: Joe Jernigan Started: 11 :45am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Finished: 03:00pm Rone Engineering
p~~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KWIKW) Page 2 of 2
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of In-Place Density Testing
Report No.: 295765
Project No.: 0712932
Date of Service: 08/15/2007
Report Date: 08/17/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Perform In-Place Density Testing
PROJECT DATA
Contractor: Duke Construction, LP
Test Method: ASTM 0-6938
Gauge: Troxler 3430
Gauge Serial No: 35518
Test Mode: DT
Standard Counts
Moisture Density
Current: 739 Current: 2510
Previous: 738 Previous: 2554
MOISTURE DENSITY RELATIONS
Maximum
Moisture Density Project Requirements
MID No. Description % (pet) Moisture Density
294619 Lime Treated Brown I Silty Sandy Clay 32.7 87.0 Optimum +4 95 min
272998 Brown / Silty Clay wI Organics 22.5 96.5- Optimum +4- u-9S min- - -
FIELD DENSITY TESTS
Test Probe MID Moisture Wet Density Dry Density Density
No Test Location Depth No. % (pet) (pet) (%max)
Utility backfill
1 12" Water line W-1, Station 3+00, 3' below 6" 272998 24.3 116.8 94.0 97
grade
Utility backfill
2 12" Water line W-1, Station 3+00, l' below 6" 272998 24.0 116.6 94.0 97
grade
Utility backfill
3 12" Water line W-1, Station 3+00, final 6" 272998 24.7 117.7 94.4 98
Cap
4 Building pad, grid line A.5/11 6" 294619 33.0 111.7 84.0 97
Cap
5 Building pad, grid line B.5/11 6" 294619 34.0 111.9 83.5 96
Cap
6 Building pad, grid line C.5/11 6" 294619 33.2 114.3 85.8 99
Cap
7 Building pad, grid line D.5/11 6" 294619 32.9 114.2 85.9 99
Cap
8 Building pad, grid line E.5/11 6" 294619 33.8 114.4 85.5 98
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 1 of 2
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of In-Place Density Testing
Report No.: 295765
Project No.: 0712932
Date of Service: 08/15/2007
Report Date: 08/17/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Perform In-Place Density Testing
FIELD DENSITY TESTS
Test Probe MID Moisture Wet Density Dry Density Density
No Test Location Depth No. % (pct) (pct) (% max)
-
Cap
9 Building pad, grid line F.5/11 6" 294619 33.9 114.6 85.6 98
Cap
10 Building pad, grid line G.5/11 6" 294619 33.1 114.9 86.3 99
Cap
11 Building pad, grid line H.5/11 6" 294619 33.8 114.3 85.4 98
Cap
12 Building pad, grid line 1.5/11 6" 294619 32.9 114.8 86.4 99
Cap
""Tr" Building pad, grid line J.5f11 6" 29461 9 " 33.3 113.7 85.3 98
Technician: Joe Jernigan
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell AUn: Mr. Lee Stone
1-cc City of Coppell AUn: Mr. Larry Davis
Started: 10:30am Finished: 04:30pm
Rone Engineering
~$
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 2 of 2
Rone Engineering
...
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of In-Place Density Testing
Report No.: 294761
Project No.: 0712932
Date of Service: 08/07/2007
Report Date: 08/17/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Perform In-Place Density Testing
PROJECT DATA
Contractor: Duke Construction, LP
Test Method: ASTM 0-6938
Gauge: Troxler 3430
Gauge Serial No: 35518
Test Mode: DT
Standard Counts
Moisture Density
Current: 724 Current: 2508
Previous: 732 Previous: 2516
MOISTURE DENSITY RELATIONS
Maximum
Moisture Density Project Requirements
MID No. Description % (pet) Moisture Density
272998 Brown I Silty Clay wi Organics 22.5 96.5 Optimum +4 95 min
FIELD DENSITY TESTS
Test Probe MID Moisture Wet Density Dry Density Density
No Test Location Depth No. % (pet) (pet) (% max)
Utility backfill
12" Water line W-1, Station 39+00, 2' below 6" 272998 24.0 116.3 93.8 97
grade
Utility backfill
2 12" Water line W-1, Station 39+00, final 6" 272998 24.1 116.5 93.9 97
Utility backfill
3 12" Water line W-1, Station 36+00, 2' below 6" 272998 23.6 116.9 94.6 98
grade
Utility backfill
4 12" Water line W-1, Station 36+00, final 6" 272998 23.9 117.1 94.5 98
Utility backfill
5 12" Water line W-1, Station 33+00, 2' below 6" 272998 23.2 116.9 94.9 98
grade
Utility backfill
6 12" Water line W-1, Station 33+00, final 6" 272998 23.7 117.3 94.8 98
Technician: Joe Jernigan Started: 12:30pm
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Finished: 03:30pm Rone Engineering
P@~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 1 of 1
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of In-Place Density Testing
Report No.: 295045
Project No.: 0712932
Date of Service: 08/09/2007
Report Date: 08/17/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Perform In-Place Density Testing
PROJECT DATA
Contractor: Duke Construction, LP
Test Method: ASTM D-6938
Gauge: Troxler 3430
Gauge Serial No: 35518
Test Mode: DT
Standard Counts
Moisture Density
Current: 738 Current: 2507
Previous: 724 Previous: 2508
MOISTURE DENSITY RELATIONS
Maximum
Moisture Density Project Requirements
MID No. Description % (pct) Moisture Density
294619 Lime Treated Brown I Silty Sandy Clay 32.7 87.0 Optimum +7 95 min
FIELD DENSITY TESTS
Test Probe MID Moisture Wet Density Dry Density Density
No Test Location Depth No. % (pct) (pct) (%max)
Subgrade
1 Building pad at grid line A.5/5 6" 294619 33.0 111.7 84.0 97
Subgrade
2 Building pad at grid line B.5/5 6" 294619 34.0 111.9 83.5 96
Subgrade
3 Building pad at grid line C.5/5 6" 294619 33.2 114.3 85.8 99
Subgrade
4 Building pad at grid line 0.5/5 6" 294619 32.8 114.6 86.3 99
Subgrade
5 Building pad at grid line E.5/5 6" 294619 32.7 111.9 84.3 97
Subgrade
6 Building pad at grid line F.5/5 6" 294619 33.3 114.2 85.7 99
Technician: Joe Jernigan
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byme
(1-ec copy)
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Started: 01 :OOpm Finished: 04:00pm
Rone Engineering
P-~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 1 of 1
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Pulverization/Gradation Testing
Report No.: 294617
Project No.: 0712932
Date of Service: 08/06/2007
Report Date: 08/17/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Pulverization/Gradation Testing
Report of Tests
Specifications:
passing
passing
112" sieve
#4 sieve
100%
60%
A B C D E
Weight Percent We ig h t Percent
Sample Retained Passing Retained Passing
Location We ig h t 1 112 " S ie v e 1 1 /2 n S ie v e #4 S ie v e #4 S ie v e
1 Building pad,grid line L.5/2 1 0 .8 0 100% 4 .1 62.0 %
il u i i d i il-g pad, g,.:d iin e K .:;/~ , 'j i .5 'J ._~- 1-0 () % . -. 4.& 05.2 % "
L
3 Building pad, grid lineJ.5/2 1 1 .0 0 100% 4.3 65.4 %
4 Building pad, grid lin e H .5/2 1 1 .7 0 1 00% 4.6 60.6 %
5 Building pad, grid lin e G .5/2 1 2.0 0 100% 4.7 61 .6 %
6 Building pad, grid line F.5/2 1 2 .0 0 100% 4.5 62.5 %
7 Building pad, grid line D.5/2 1 1 .3 0 1 00% 4.4 61.0 %
8 Building pad, grid line C.5/2 1 0 .9 0 100% 4.1 62.3 %
9 Building pad, grid lin e B .5/2 1 1 .0 0 100% 4.0 63.6 %
1 0 Building pad, grid lin e A .5/2 1 1 .0 0 100 % 4.4 60.0 %
Technician: Joe Jernigan Started: 06:45am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Finished: 11 :30am
Rone Engineering
p~
:~
K. Scott Watson, AET
Project Manager
L1MITA nONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 1 of 1
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Pulverization/Gradation Testing
Report No.: 295603
Project No.: 0712932
Date of Service: 08/14/2007
Report Date: 08/17/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Pulverization/Gradation Testing
Report of Tests
Specifications:
passing
passing
1/2" sieve
#4 sieve
100%
60%
A B C D E
We ig h t Percent Weight Percent
Sam pie Retained Passing Retained Passing
Location W e ig h t 1 1/2 " S ie v e 1 1/2 " S ie v e #4 S ie v e #4 S ie v e
1 Building pad, grid Ii n eA. 5 19 1 2.6 0 1 00% 4.7 62.6 %
- - - - f 00 % -
2 Building pad, grid lineB.519 I L .Il - 0 4.4 63.3 %
3 Building pad,grid lineC.5.9 1 2.5 0 100% 4.8 61 .6 %
4 Building pad, grid I in e D .519 1 1 .8 0 1 00% 4.2 64.4 %
5 Building pad, grid Ii n e E .519 1 1 .9 0 1 00% 4.4 63.0 %
6 Building pad, grid Ii n e F .519 1 2.0 0 1 00% 4.6 61.6%
7 Building pad, grid line G .519 1 2 .0 0 1 00% 4.5 62.5 %
8 Building pad, grid lin e H .5/9 1 1 .5 0 1 00% 4.2 63.4 %
9 Build'ing pad, grid Ii n e I. 519 1 1 .5 0 1 00% 4.4 61.7%
1 0 Building pad, grid line J.519 1 1 .3 0 100% 4.3 61 .9 %
Technician: Joe Jernigan Started: 12:15pm
Report Distribution:
Orlg: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Finished: 04:30pm Rone Engineering
p~~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing, We assume no responsibility for variation in quality
(composition, appearance, etc,) or any other feature of similar subject matter provided by persons or conditions over which we have no contne!. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd.
(KW/KW) Page 1 of 1
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Pulverization/Gradation Testing
Report No.: 295410
Project No.: 0712932
Date of Service: 08/13/2007
Report Date: 08/17/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Pulverization/Gradation Testing
Report of Tests
Specifications:
passing
passing
1/2" sieve
#4 sieve
100%
60%
A B C 0 E
We ig h t Percent We ig h t Percent
Sam pie Retained Passing Retained Passing
Location W e ig h t 1 1 12 .. S ie v e 1 1 12 .. S ie v e #4 S ie v e #4 S ie v e
1 Building pad, grid I in e s F .5/7 1 1 .9 0 100 % 4.6 61 .3 %
-- - . - 100%- 4.3 Ii 2 .ll%
2 Building pad, grid Ii n e s G .5/7 1 1 .5 0 .
3 Building pad, grid Ii n e s H.5/7 1 1 .5 0 1 00% 4.4 61 .7%
4 Building pad,grid Ii n e s 1.5/7 1 1 .5 0 1 00% 4.2 63.4 %
5 Building pad, grid Ii n e s J.5/7 1 1 .1 0 1 00% 4.3 61 .2 %
Technician: Joe Jernigan Started: 11: 15am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Finished: 06:15pm Rone Engineering
p~~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, LId.
(KW/KW) Page 1 of 1
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Pulverization/Gradation Testing
Report No.: 295215
Project No.: 0712932
Date of Service: 08/10/2007
Report Date: 08/17/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Pulverization/Gradation Testing
Report of Tests
Specifications:
passing
passing
1/2" sieve
#4 sieve
100%
60%
A B C 0 E
We ig h t Percent W e ig h t Percent
Sam pIe Retained Passing Retained Passing
Location We ig h t 1 1 /2 " S ie v e 1 1/2 " S ie v e #4 S ie v e #4 S ie v e
1 Building pad, grid Ii n e s A .5/7 10.8 0 1 00% 4.2 61 .1 %
~ .- ~ ~ .-- -. 4.5
2 Building pad,grid Ii n e s C .5/7 1 1 .5 U 100% 60.8 %
3 Building pad,grid Ii n e s o .5/7 1 1 .1 0 1 00% 4.1 63.0 %
4 Building pad, grid Ii n e s E .5/7 1 1 .3 0 100 % 4.3 61 .9 %
5 Building pad,grid lin es F .5/7 1 1 .0 0 1 00% 4.1 63.6 %
Technician: Joe Jernigan Rone Engineering
See Report 295214 for technician time~ ~
Report Distribution: . .' ~ '. .
Ori9: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne . '. . . . .
(1~ec copy) . .
1-cc City of Coppell Attn: Mr. Lee Stone K. Scott Watson AET
1-cc City of Coppell Attn: Mr. Larry Davis Project Manager
~
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 1 of 1
Rone Engineering
T.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Pulverization/Gradation Testing
Report No.: 295046
Project No.: 0712932
Date of Service: 08/09/2007
Report Date: 08/17/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Pulverization/Gradation Testing
Report of Tests
Specifications:
passing
passing
1/2" sieve
#4 sieve
1 00%
60%
A B C D E
We ig h t Percent We ig h t Percent
Sam pie Retained Passing Retained Passing
Location W e ig h t 1 1 /2 " S ie v e 1 1 /2 " S ie y e #4 S Ie v e #4 S ie y e
1 Building pad, grid I in e s A.5/3 1 0 .6 0 100% 4.1 61 .3 %
2 BUldling p..a~ grid lines [J .5/3 1 () .2 0 _._..- 100%- 4.0 6-0;7% ---
3 Building pad,grid lin e s C .5/3 1 1 .0 0 100% 4.3 60.9 %
4 Building pad, grid lin e s o .5/3 1 1 .0 0 100% 4.1 62.7%
5 Building pad,grid lin e s E .5/3 1 1 .1 0 100% 4.3 61 .2 %
6 Building pad,grid lin e s F .5/3 1 0 .8 0 100% 4.1 62.0 %
7 Building pad,grid I in e s G .5/3 1 1 .5 0 100% 4.2 63.4 %
8 Building pad, grid I in e s H .5/3 1 1 .3 0 1 00% 4.2 62.8 %
9 Building pad, grid Ii n e s I. 5/3 1 1 .0 0 100% 4.2 61 .8 %
1 0 Building pad, grid Ii n e s J.5/3 1 0 .9 0 100% 4.1 62.3 %
Technician: Joe Jernigan Started: 10:00am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) AUn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell AUn: Mr. Lee Stone
1-cc City of Coppell AUn: Mr. Larry Davis
Finished: 12:45pm Rone Engineering
p~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 1 of 1
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of In-Place Density Testing
Report No.: 295411
Project No.: 0712932
Date of Service: 08/13/2007
Report Date: 08/17/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Perform In-Place Density Testing
PROJECT DATA
Contractor: Duke Construction, LP
Test Method: ASTM D-6938
Gauge: Troxler 3430
Gauge Serial No: 35518
Test Mode: DT
Standard Counts
Moisture Density
Current: NA Current: NA
Previous: NA Previous: NA
MOISTURE DENSITY RELATIONS
Maximum
Moisture Density Project Requirements
MID No. Description % (pet) Moisture Density
294619 Lime Treated Brown / Silty Sandy Clay 32.7 87.0 Optimum +4 95 min
L7299S" BrowIl TSllty Clay'w/Organics 22.5 96.5 Optimurn~ - 95min
FIELD DENSITY TESTS
Test Probe MID Moisture Wet Density Dry Density Density
No Test Location Depth No. % (pet) (pet) (% max)
Utility backfill
1 12" Water line W-1, Station 24+00, 2' below 6" 272998 25.1 118.8 95.0 98
grade
Utility backfill
2 12" Water line W-1, Station 24+00, final 6" 272998 25.0 118.4 94.7 98
Utility backfill
3 12" Water line W-1, Station 21 +00,2' below 6" 272998 24.3 118.2 95.1 99
grade
Utility backfill
4 12" Water line W-1, Station 21 +00, final 6" 272998 26.1 111'<.3 93.8 97
Utility backfill
5 12" Water line W-1, Station 18+00, 2' below 6" 272998 24.1 117.8 94.9 98
grade
Utility backfill
6 12" Water line W-1, Station 18+00, final 6" 272998 24.7 118.5 95.0 98
Utility backfill
7 12" Water line W-1 , Station 16+00, 2' below 6" 272998 24.9 118.5 94.9 98
grade
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 1 of 2
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of In-Place Density Testing
Report No.: 295411
Project No.: 0712932
Date of Service: 08/13/2007
Report Date: 08/17/2007
Project: Hemisphere's at Point West
Coppell, Texas
Services: Perform In-Place Density Testing
FIELD DENSITY TESTS
Test Probe MID Moisture Wet Density Dry Density Density
No Test Location Depth No. % (pet) (pet) (%max)
Utility backfill
8 12" Water line W-1, Station 16+00, final 6" 272998 25.1 117.1 93.6 97
Utility backfill
9 Building pad, grid line A.5/7 6" 294619 34.1 112.2 83.7 96
Utility backfill
10 Building pad, grid line B.5/7 6" 294619 33.5 112.8 84.5 97
Utility backfill
11 Building pad, grid line C.5/7 6" 294619 33.9 112.5 84.0 97
-~~- -tltHity-backfill ------- .._.~-- - -
12 Building pad, grid line D.5/7 6" 294619 33.1 112.3 84.4 97
Utility backfill
13 Building pad, grid line E.5/7 6" 294619 32.9 114.8 86.4 99
Utility backfill
14 Building pad, grid line F .5/7 6" 294619 33.3 113.7 85.3 98
Utility backfill
15 Building pad, grid line J.5/7 6" 294619 32.9 114.7 86.3 99
Utility backfill
16 Building pad, grid line H.5/7 6" 294619 33.4 115.7 86.7 100
Utility backfill
17 Building pad, grid line 1.5/7 6" 294619 33.0 111.7 84.0 97
Utility backfill
18 Building pad, grid line G.5/7 6" 294619 34.1 111.8 83.4 96
Utility backfill
19 Building pad, grid line H.5/7 6" 294619 33.2 114.3 85.8 99
Utility backfill
20 Building pad, grid line 1.5/7 6" 294619 33.7 111.9 83.7 96
Utility backfill
21 Building pad, grid line J.5/7 6" 294619 33.6 112.2 84.0 97
Technician: Joe Jernigan Rone Engineering
See Report 295410 for technician time~~
Report Distribution: . ... .. . . .
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne . ... . .. . ... .
(1-ec copy)
1-ee City of Coppell Attn: Mr. Lee Stone K. Scott Watson AET
1-ec City of Coppell AUn: Mr. Larry Davis Project Manager
~
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 2 of 2