Loading...
Duke Lesley-LR070829 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 295715 Project No.: 0612510 Date of Service: 08/15/2007 Report Date: 08/29/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Concrete Supplier: Southern Star Plant: 105 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 3" - 5" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ,....3Trvi C . i 064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 4607BA Placement Date: 08/15/2007 Weather Conditions: Clear Time Sampled: 03:30pm Temperature - Air: 1000F Truck No: 2042 Air Content: NA Overall Placement Location: Traffic signal bases T1 and T2 Batch time: 03:02pm Concrete: 940F Ticket No: 1060322 Unit Weight (pcf): NA Measured Slump (inches) 4.25 Sample Location: Same as above REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 08/22/2007 7 6.00 28.27 113,320 4,010 Unbonded Cap 1 2 09/12/2007 28 1 3 09/12/2007 28 4 10/10/2007 56 Remarks: Water added at site: 5 gallons Rone Engineering See Repo" 295677 jm tectm;dao umep~ ~ K. Scott Watson, AET Project Manager Technician: Ryan Rawlinson Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Alln: Mr. Alex Bennell PE (1-ec copy) 1-cc City of Coppell Alln: Mr. Lee Stone 1-cc City of Coppel! Alln: Mr. Larry Davis LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (KW/KW) Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 295902 Project No.: 0612510 Date of Service: 08/16/2007 Report Date: 08/29/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: Southern Star Plant: 110 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 3" - 5" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 -",: '; - .1 ,"",,~ ,i ,\0:.d oJ ::.JV!-~ ASTM C-138 ASTM C-39 Mix Design 1.0.: 9607BA Placement Date: 08/16/2007 Weather Conditions: Clear Time Sampled: 04:30pm Temperature - Air: 930F Truck No: 712 Air Content: NA Overall Placement Location: Structural concrete poured for traffic signal base at T3 and T4 Measured Slump (inches) 4.25 Batch time: 03:41 pm Concrete: 890F Ticket No: 1061825 Unit Weight (pcf): NA Sample Location: Same as above REPORT OF TESTS Cylinder Marked Date Set No. Tested 1 1 08/23/2007 2 09/13/2007 3 09/13/2007 1 4 10/11/2007 Age (days) 7 Diameter (in) 6.00 28 28 56 Remarks: Water added at site: 5 gallons Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 140,320 Compressive Strength (psi) 4,960 Fracture Type Unbonded Cap Area (in2) 28.27 Rone Engineering s'" Report 295814 "" teoho;cioo umep~ ~ K, Scott Watson, AET Project Manager Technician: Ryan Rawlinson Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/LB) Page 1 of 1 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 296269 Project No.: 0612510 Date of Service: 08/21/2007 Report Date: 08/29/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: Lacy Plant: Onsite Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 6" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Batch time: 09:25am Concrete: 790F Ticket No: NA Unit Weight (pet): NA Measured Slump (inches) 5.5 Mix Design I.D.: 5194 Placement Date: 08/21/2007 Weather Conditions: Clear Time Sampled: 09:30am Temperature - Air: 850F Truck No: NA Air Content: 5.6% Overall Placement Location: Paving, Dividend Street median sta 41 + 25 - 43+00; Approach from Beltline to Dividend Street Sample Location: 5' east, 30' south into approach REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 1 1 08/24/2007 3 6.00 28.27 75,210 2,660 Unbonded Cap 1 2 08/28/2007 7 6.00 28.27 89,850 3,180 Unbonded Cap 1 3 09/18/2007 28 1 4 09/18/2007 28 Rone Engineering p-p~ Started: 06:30am Finished: 10:45am Technician: Ryan Rawlinson Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Alln: Mr. Alex Bennell PE (1-ec copy) 1-ec Lacy Construction Alln: Mr. Kevin Briles 1-cc City of Coppell Alln: Mr. Lee Stone 1-cc City of Coppell Alln: Mr. Larry Davis K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (DMlKW) Page 1 of 1