Loading...
Duke Lesley-LR070817 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Lime Depth Checks Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report No.: 294933 Project No.: 0612510 Date of Service: 08/08/2007 Report Date: 08/17/2007 Project: Lesley Infrastructure Services: Lime Depth Check Report of Tests A c tu a IDe p th R e quire d Item Location (Inches) De p th (In c h e s ) 1 Dividend, eastbound la n e, S ta ti 0 n 1+00 7.00 6.00 2 D i v ide n d, e a S tb 0 un d lane, Station 4+00 7.00 6.00 3 Dividend, eastbound lane, Station 7+00 7.00 6.00 4 Dividend, eastbound lane, Station 10+00 6.25 6.00 5 Dividend, eastbound lane, Station 13+00 6.50 6.00 6 Dividend, eastbound la n e, S ta ti 0 n 16+00 6.00 6.00 7 Dividend, eastbound lane, Station 19+00 6.00 6.00 8 Dividend, eastbound lane, Station 22+00 6.25 6.00 9 Dividend, eastbound lane, Station 25+00 8.00 6.00 10 Dividend, eastbound lane, Station 28+00 7.75 6.00 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar sUbject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/LB) Page 1 of 3 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Lime Depth Checks Report No.: 294933 Project No.: 0612510 Date of Service: 08/08/2007 Report Date: 08/17/2007 Project: Lesley Infrastructure Services: Lime Depth Check A c tu a IDe p th R e quire d Item Location (Inches) Depth (Inches) 1 1 D i vi den d, e a s tb 0 un d lane, Station 31+00 7.00 6.00 12 D i vi den d, e a s tb 0 un d lane, Station 34+00 7.00 6.00 13 Dividend, eastbound lane, Station 37+00 6.50 6.00 14 Dividend, eastbound lane, Station 40+00 6.00 6.00 15 Dividend, eastbound lane, Station 43+00 6.00 6.00 16 D ivid e~9~astb 0 und lane, Station 45+00 6.00 6.00 -- 1 7 Dividend, eastbound lane, Station 48+00 6.00 6.00 1 8 Point West, Station 1 +00 6.50 6,00 19 Point West, Station 4+00 6.25 6.00 20 Point West, Station 7+00 7.00 6.00 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMILB) Page 2 of 3 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Lime Depth Checks Report No.: 294933 Project No.: 0612510 Date of Service: 08/08/2007 Report Date: 08/17/2007 Project: Lesley Infrastructure Services: Lime Depth Check A c tu a IDe p th Required Item Location (Inches) De p th (In c he s) 21 Point West, Station 10+00 7.25 6.00 22 Point West, Station 13+00 7.00 6.00 23 C en te r 0 f north tu rn la n e 6.50 6.00 24 C enter of south turn lane 6.50 6.00 L-__ Technician: Joe Jernigan Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Started: 09:30am Finished: 12:30pm Rone Engineering P-~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/LB) Page 3 of 3 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 295024 Project No.: 0612510 Date of Service: 08/09/2007 Report Date: 08/17/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: Lacy Plant: On site Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 4" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 5194 Placement Date: 08/09/2007 Weather Conditions: Clear Time Sampled: 07:15am Temperature - Air: 790F Truck No: NA Air Content: 3.8% Overall Placement Location: Paving for Dividend Street, Station 0+00 to 19+00, eastbound lane Measured Slump (inches) 1.0 Batch time: 07:05am Concrete: 760F Ticket No: NA Unit Weight (pct): NA Sample Location: Station 1 +25 REPORT OF TESTS Cylinder Marked Date Age Set No. Tested (days) 1 1 08/16/2007 7 2 09/06/2007 28 3 09/06/2007 28 4 08/14/2007 5 Diameter (in) 6.00 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 83,610 Compressive Strength (psi) 2,960 Fracture Type Unbonded Cap Area (in') 28.27 6.00 28.27 75,950 2,690 Unbonded Cap LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 1 of 9 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 B90B Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 7B744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 295024 Project No.: 0612510 Date of Service: 08/09/2007 Report Date: 08/17/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: Lacy Plant: On site Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 4" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 5194 Placement Date: 08/09/2007 Weather Conditions: Clear Time Sampled: 08:10am Temperature - Air: 840F Truck No: NA Air Content: 3.6% Overall Placement Location: Paving for Dividend Street, Station 0+00 to 19+00, eastbound lane Measured Slump (inches) 0.75 Batch time: 08:00am Concrete: 800F Ticket No: NA Unit Weight (pcf): NA Sample location: Station 2+50 REPORT OF TESTS Cylinder Marked Date Age Set No. Tested (days) 2 1 08/16/2007 7 2 2 09/06/2007 28 2 3 09/06/2007 28 2 4 08/14/2007 5 Diameter (in) 6.00 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 88,620 Compressive Strength (psi) 3,130 Fracture Type Un bonded Cap Area (in') 28.27 6.00 28.27 84,020 2,970 Unbonded Cap LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 2 of 9 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 295024 Project No.: 0612510 Date of Service: 08/09/2007 Report Date: 08/17/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: Lacy Plant: On site Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 4" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 Mix Design I.D.: 5194 Placement Date: 08/09/2007 Weather Conditions: Clear Time Sampled: 08:45am Temperature - Air: 850F Truck No: NA Air Content: 3.2% Overall Placement Location: Paving for Dividend Street, Station 0+00 to 19+00, eastbound lane Measured Slump (inches) 0.25 Batch time: 08:40am Concrete: 840F Ticket No: NA Unit Weight (pcf): NA Sample Location: Station 3+75 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 90,760 Cylinder Marked Date Age Set No. Tested (days) 3 1 08/16/2007 7 3 2 09/06/2007 28 3 3 09/06/2007 28 3 4 08/14/2007 5 Diameter (in) 6.00 Area (in2) 28.27 Compressive Strength (psi) 3,210 Fracture Type Unbonded Cap 6.00 28.27 81,080 2,870 Unbonded Cap LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 3 of 9 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214)630-9745 Report of Concrete Compressive Strength Test Report No.: 295024 Project No.: 0612510 Date of Service: 08/09/2007 Report Date: 08/17/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: Lacy Plant: On site Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 4" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 Batch time: 09: 1 Oam Concrete: 870F Ticket No: NA Unit Weight (pcf): NA Measured Slump (inches) 0.75 Mix Design I.D.: 5194 Placement Date: 08/09/2007 Weather Conditions: Clear Time Sampled: 09: 15am Temperature - Air: 880F Truck No: NA Air Content: 3.5% Overall Placement Location: Paving for Dividend Street, Station 0+00 to 19+00, eastbound lane Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 102,510 Area (in') 28.27 6.00 28.27 88,340 Sample Location: Station 5+80 REPORT OF TESTS Cylinder Marked Date Age Set No. Tested (days) 4 1 08/16/2007 7 4 2 09/06/2007 28 4 3 09/06/2007 28 4 4 08/14/2007 5 Diameter (in) 6.00 Compressive Strength (psi) 3,630 Fracture Type Unbonded Cap 3,120 Unbonded Cap LIMITATION S: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar sUbject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 4 of 9 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 295024 Project No.: 0612510 Date ot Service: 08/09/2007 Report Date: 08/17/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: Lacy Plant: On site Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 4" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 5194 Placement Date: 08/09/2007 Weather Conditions: Clear Time Sampled: 1 0:45am Temperature - Air: 880F Truck No: NA Air Content: 3.8% Overall Placement Location: Paving for Dividend Street, Station 0+00 to 19+00, eastbound lane Measured Slump (inches) 0.75 Batch time: 1 0:40am Concrete: 920F Ticket No: NA Unit Weight (pet): NA Sample Location: Station 9+00 REPORT OF TESTS Cylinder Marked Date Age Set No. Tested (days) 5 1 08/16/2007 7 5 2 09/06/2007 28 5 3 09/06/2007 28 5 4 08/14/2007 5 Diameter (in) 6.00 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 87,900 Compressive Strength (psi) 3,110 Fracture Type Unbonded Cap Area (in') 28.27 6.00 28.27 80,630 2,850 Unbonded Cap LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LBILB) Page 5 of 9 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 295024 Project No.: 0612510 Date of Service: 08/09/2007 Report Date: 08/17/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: Lacy Plant: On site Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 4" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 5194 Placement Date: 08/09/2007 Weather Conditions: Clear Time Sampled: 12:00p~ Temperature - Air: 930F Truck No: NA Air Content: 4.3% Overall Placement Location: Paving for Dividend Street, Station 0+00 to 19+00, eastbound lane Measured Slump (inches) 1.0 Batch time: 11 :50am Concrete: 950F Ticket No: NA Unit Weight (pcf): NA Sample Location: Station 11 +85 REPORT OF TESTS Cylinder Marked Date Age Set No. Tested (days) 6 1 08/16/2007 7 6 2 09/06/2007 28 6 3 09/06/2007 28 6 4 08/14/2007 5 Diameter (in) 6.00 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 82,370 Compressive Strength (psi) 2,910 Fracture Type Unbonded Cap Area (in2) 28.27 6.00 28.27 80,320 2,840 Unbonded Cap LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LBfLB) Page 6 of 9 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 295024 Project No.: 0612510 Date of Service: 08/09/2007 Report Date: 08/17/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: Lacy Plant: On site Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 4" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 Mix Design I.D.: 5194 Placement Date: 08/09/2007 Weather Conditions: Clear Time Sampled: 12:50pm Temperature - Air: 930F Truck No: NA Air Content: 4.7% Overall Placement Location: Paving for Dividend Street, Station 0+00 to 19+00, eastbound lane Measured Slump (inches) 1.25 Batch time: 12:40pm Concrete: 940F Ticket No: NA Unit Weight (pcf): NA Sample Location: Station 13+50 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 55,510 Cylinder Marked Date Age Set No. Tested (days) 7 1 08/16/2007 7 7 2 09/06/2007 28 7 3 09/06/2007 28 7 4 08/14/2007 5 Diameter (in) 6.00 Area (in') 28.27 Compressive Strength (psi) 1,960 Fracture Type Unbonded Cap 6.00 28.27 59,240 2,100 Unbonded Cap LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 7 of 9 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 6906 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630.9745 Report of Concrete Compressive Strength Test Report No.: 295024 Project No.: 0612510 Date of Service: 08/09/2007 Report Date: 08/17/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: Lacy Plant: On site Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 4" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 Mix Design I.D.: 5194 Placement Date: 08/09/2007 Weather Conditions: Clear Time Sampled: 01 :40pm Temperature - Air: 960F Truck No: NA Air Content: 4.2% Overall Placement Location: Paving for Dividend Street, Station 0+00 to 19+00, eastbound lane Measured Slump (inches) 1.0 Batch time: 01 :35pm Concrete: 960F Ticket No: NA Unit Weight (pet): NA Sample Location: Station 15+25 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 76,380 Cylinder Marked Date Age Set No. Tested (days) 8 1 08/16/2007 7 8 2 09/06/2007 28 8 3 09/06/2007 28 8 4 08/14/2007 5 Diameter (in) 6.00 Area (in') 28.27 Compressive Strength (psi) 2,700 Fracture Type Unbonded Cap 6.00 28.27 73,520 2,600 Unbonded Cap LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 6 of 9 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 295024 Project No.: 0612510 Date of Service: 08/09/2007 Report Date: 08/17/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: Lacy Plant: On site Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 4" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 5194 Placement Date: 08/09/2007 Weather Conditions: Clear Time Sampled: 02:10pm Temperature - Air: 960F Truck No: NA Air Content: 4.1% Overall Placement Location: Paving for Dividend Street, Station 0+00 to 19+00, eastbound lane Measured Slump (inches) 1.25 Batch time: 02:00pm Concrete: 1000F Ticket No: NA Unit Weight (pet): NA Sample Location: Station 16+50 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 9 1 08/16/2007 7 6.00 28.27 84,670 2,990 Unbonded Cap 9 2 09/06/2007 28 9 3 09/06/2007 28 9 4 08/14/2007 C 6.00 28.27 85,820 @ Unbonded Cap Technician: Ryan Rawlinson Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Started: 06:00am Finished: 03:45pm Rone Engineering /*~.~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd. (LB/LB) Page 9 of 9 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214)630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Lime Depth Checks Report No.: 295602 Project No.: 0612510 Date of Service: 08/14/2007 Report Date: 08/17/2007 Project: Lesley Infrastructure Services: Lime Depth Check Report of Tests A c tu a IDe p th R e quire d Item Location (Inches) o e p th (In c h e s ) 1 Dividend, westbound lane, Station 37+00 6.50 6.00 2 D i v ide n d , W e s tb 0 un d lane, Station 40+00 6.25 6.00 3 Dividend, westbound lane, Station 43+00 6.25 6.00 4 Dividend, westbound la n e, S ta ti 0 n 46 + 0 0 6.00 6.00 5 o i vi den d , we s tb 0 un d lane, Station 48+50 6.00 6.00 Technician: Joe Jernigan Rone Engineering See Report 295601 focteOh"",>ot;mep ~ ~ K. Scott Watson, AET Project Manager Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMlLB) Page 1 of 1 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Reinforcing Steel Inspection Report No.: 294958 Project No.: 0612510 Date of Service: 08/08/2007 Report Date: 08/17/2007 Project: Lesley Infrastructure Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Steel for paving, west lane, Dividend Drive, Station 1+50 to 34+00 Items Inspected Conforming Non Items Ins peeled. Conforming Non Item s Ins peeled: Conforming Non Conforming Co nfo rm ing Co nfo rm ing P lacing Drawings 8 ar Lenglh Column Ties Properly Approved x and Shape x T led and Spaced NA Bar Size x Proper Bar P lacem ent x Stirrup Spacing NA Bar Grade x Pro perly Tied x Stirrup Type NA ~. Bars Clean x Dowel Bars in Place x Lapped Splices x Form Clean x Pro per 8 ar Suppa r1s x Co mer Bars NA Numberof Bars x ProperCover x Mechanical Splices NA Discrepancies / Comments: No apparent discrepancies were noted at the locations listed above. Technician: Tommy Chapa Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Started: 04:00pm Finished: 05:15pm Rone Engineering p-~..~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMILB) Page 1 of 1 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Reinforcing Steel Inspection Report No.: 295493 Project No.: 0612510 Date of Service: 08/11/2007 Report Date: 08/17/2007 Project: Lesley Infrastructure Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Northbound turn lane into Beltline Road Item s Inspected Conforming Non Item sins peeted: Co nfo rm ing Non Item sins peeted: Conforming Non Confonming Conforming Conforming P lacing Drawings Bar Length Column Ties Properly Approved x and Shape NA Tied and Spaced NA Bar Size x Proper Bar Placement x Stirrup Spacing NA Bar Grade x Pro perly Tied x Stirrup Type NA _..- Bars Clean x Dowel Bars in Place x Lapped Splices x Form Clean x PrnperBarSupports x Co mer Bars NA Numberof Bars x ProperCover x Mechanical Splices NA Discrepancies / Comments: 1. Remove trash from forms. 2. Chairs needed. Discrepancies noted above were corrected prior to concrete placement. Technician: Ryan Rawlinson Report Distribution: Orig: Duke Construction, LP (Dallas, DC) Attn: Mr. Alex Bennett PE (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppel! Attn: Mr. Larry Davis Started: 05: 15am Finished: 06:00am Rone Engineering p~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, LId. (TM/LB) Page 1 of 1 Rone Engineering .. 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Reinforcing Steel Inspection Report No.: 295111 Project No.: 0612510 Date of Service: 08/09/2007 Report Date: 08/17/2007 Project: Lesley Infrastructure Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Steel for paving, west lane of Dividend Drive, Station 34+86.83 to 42+98.71 Head wall over box culvert, Station 0+48.89, line B Items Inspected" Co nforming Non Items Inspected Co nfo rm ing Non Item s Ins peeled: Confo rrn ing Non Conforming Conforming Co nfo rm ing P lacing Drawings Bar Length Column Ties Properly Approved x and Shape x T led and Spaced NA Bar Size x P fO per B ar P lacem ent x Storrup Spacing NA B F!r Grade x PraperlyTied x Storrup Type NA -- -...-.--- Bars Clean x Do wel Bars in Place x Lapped Splices x Form Clean x P ra per Bar Suppa rts x Corner 8 ars x N um ber of Bars x ProperCover x Mechanical Splices NA Discrepancies I Comments: No apparent discrepancies were noted at the locations listed above. Technician: Tommy Chapa Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-cc City of Coppel! AUn: Mr. Lee Stone 1-cc City of Coppel! AUn: Mr. Larry Davis Started: 02:30pm Finished: 04:00pm Rone Engineering /~~.~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/LB) Page 1 of 1 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Lime Depth Checks Report No.: 295409 Project No.: 0612510 Date of Service: 08/13/2007 Report Date: 08/17/2007 Project: Lesley Infrastructure Services: Lime Depth Check Report of Tests A c tu a IDe p th Required Item Location (Inches) De p th (In c h e s) 1 Dividend, westbound lane, Station 1+00 6.25 6.00 2 D i v ide n d , we s tb 0 un d lane, Station 4+00 6.25 6.00 3 Dividend, westbound lane, Station 7+00 6.50 6.00 4 Dividend, westbound lane, Station 10+00 6.00 6.00 : 5 Dividend, westbound lane, Station 13+00 6.00 6.00 6 Dividend, westbound la ne, S ta ti 0 n 16+00 6.00 6.00 7 Dividend, westbound la ne, Statio n 19+00 6.50 6.00 8 Dividend, westbound la ne, Station 22+00 6.75 6.00 9 Dividend, westbound lane, Station 25+00 6.25 6.00 10 Dividend, westbound lane, Station 28+00 6.00 6.00 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMfLB) Page 1 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Lime Depth Checks Report No.: 295409 Project No.: 0612510 Date of Service: 08/13/2007 Report Date: 08/17/2007 Project: Lesley Infrastructure Services: Lime Depth Check A c tu a IDe p th Required Item Location (Inches) Depth (Inches) 1 1 Dividend, westbound la n e, S ta ti 0 n 3 1 + 0 0 6.00 6.00 1 2 Dividend, westbound la n e, S ta ti 0 n 34 + 00 6.00 6.00 Technician: Joe Jernigan Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Started: 10:00am Finished: 12:00pm Rone Engineering P-~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/LB) Page 2 of 2