Duke Lesley 3C-LR070830
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 295656
Project No.: 0711530
Date of Service: 08/15/2007
Report Date: 08/30/2007
Project: Point West Office I
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete Ltd.
Plant: 01
Specification Requirements
Strength: 3,000 psi @ 28 days
Slump (in.): 5" - 7"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 7751 PW
Placement Date: 08/15/2007
Weather Conditions: NA
Time Sampled: 03:34pm
Temperature - Air:
Truck No: 13E
Air Content: NA
Overall Placement Location:
Piers (see pier report #295655)
Measured
Slump
(inches)
Batch time: 03: 18pm
Concrete:
Ticket No: 13078
Unit Weight (pcf): NA
Sample Location:
Pier JIB
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 08/22/2007 7 6.00 28.27 75,480 2,670 Unbonded Cap
2 09/12/2007 28
3 09/12/2007 28
4 10/10/2007 56
Technician: Gerry Graham Rone Engineering
See Report 295655 for technician time~~
Report Distribution:
Ori"~: ~:p~;truct;O". LP (0,,,",. TX) Att" Me. P,"' Byme .d' . _:=-- ,
1-cc Potter Concrete Attn: Mr. Ryan Skelly K. Scott Watson, AET
1-cc City of Coppell Attn: Mr. Lee Stone p . t M
.' roJec anager
1-cc City of Coppell Attn: Mr. Larry DaVIS
~
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(KW/KW) Page 1 of 1
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 295655
Project No.: 0711530
Date of Service: 08/15/2007
Report Date: 08/30/2007
Project: Point West Office I
Services: Straight Shaft Pier Inspection
Report of Inspection
D rille r: M cK innev D rillinCl
Pie r Id e n ti fi c a ti 0 n G 13 J/3 G 14 J 14 I G 15
PierDiameter(in) 24 24 24 24 24
Depth of Pier From Surface (ft) 52.00 54.50 52.50 51 .80 52.00
Depth ofBearinCl Stratum Fro m Surface(ft) 41.60 43.80 42.20 41 .50 41.50
Required Penetration (ft) 1 0.00 1 0.00 10.00 1 0.00 10.00
A ctua I P e ne tra tio n (ft)" 10.40 1 0.70 10.30 10.30 10.50
Condition of Bottom (wet/dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (ves Ino) Yes Yes Yes Yes Yes
C asina Diameter (in) I C asinCl Lenath (ft) 26 I 41 .6 26/43.8 26/42.2 26/41.5 26/41.5
NumberofBars IReinforcing BarSize 6 1#6 6 1#6 6 1#6 6 1#6 6 1#6
Length of Reinforcina Steel (ft) 50.00 52.50 50.50 49.80 39.50
Time Drillina was Completed (am Ipm) 8 :2 2 AM 8:58 AM 9:16 AM 9 :46 AM 11:42AM
Time Concrete was Placed (am Ipm) 11:14AM 11:58AM 1 :01 PM 1 : 1 1 PM 1 :43 P M
Depth of Pier From Top of Concrete (ft) 50.50 53.00 51 .00 50.30 50.50
Elevation: Surface (ft)"" 99.50 99.50 99.50 99.50 99.50
Elevation: Top of Pier (ft).. 98.00 98.00 98.00 98.00 98.00
Elevation: Bottom of Pier (ft).. 47.50 45.00 47.00 47.70 47.50
Elevation: Top of Bearina Stratum (ft.)" " 57.90 55.70 57.30 58.00 58.00
BearinCl Stratum (d e s criptio n) GravShale
Note:See report# 295656 forCompressive StrengthTestSpecimens.
"Additional Penetration not requested unless noted. "Elevation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no controL Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TMIKW) Page 1 of 2
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 295655
Project No.: 0711530
Date of Service: 08/15/2007
Report Date: 08/30/2007
Project: Point West Office I
Services: Straight Shaft Pier Inspection
D rille r: McKinney Drilling
Pier Identification J/5 J/6 J/7 J/8 J/9
PierDiameter(in\ 24 24 24 24 24
DepthofPierFrom Surface(ft) 49.00 48.00 48.60 48.60 47.00
Depth of Bear in a Stratum Fro m Surface(ft) 38.60 37.50 38.40 38.40 36.20
Required Penetration (ft) 1 0.00 10.00 10.00 10.00 1 0.00
Actual Penetration (ft)* 1 0.40 10.50 1 0.20 10.20 10.80
Condition of Bottom (wet/drv\ D rv D rv D rv D rv D rv
Plumb Within Tolerance (ves Ino) Yes Yes Yes Yes Yes
Casinq Diameter(in\/Casina Lenqth (ft) 26/38.6 26/37.5 26 138.4 26/38.4 26 136.2
NumberofBars IReinforcina BarSize 6 1#6 6 1 #6 6 1 #6 6 1#6 6 1 #6
Lenqth of Reinforcina Steel (ft) 47.00 46.00 46.60 46.60 45.00
Tim e D ri IIi n a was Com 0 Ie te d (a m I pm \ 12:16 PM 1 :01 PM 1:40PM 2 :52 P M 3:17 PM
Tim e Con c re te was P la c e d (a miD m ) 2 :00 P M 2:24PM 2:35 PM 3 :34 P M 4:08 PM
Depth of Pier From Too of Concrete (ft) 47.50 46.50 47.10 47.10 44.50
Elevation: Surface (ft).. 99.50 99.50 99.50 99.50 99.50
Elevation: Too of Pier (ft)" 9 8.00 98.00 98.00 98.00 97.00
Elevation: Bottom of Pier (ft)** 50.50 51 .50 50.90 50.90 52.50
Elevation: Too of Bear in a Stratum (ft.)" 6 0.90 62.00 61 .10 61 .1 0 63.30
Bearina Stratum (descriotion) G ra v S h a Ie
Note: See re port # 295656 for Com pressive Strength Test S pecim ens.
* Additional Penetration not requested unless noted. HE levation by others
Technician: Gerry Graham Started: 05:45am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Finished: 05:45pm Rone Engineering
p~
~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/KW) Page 2 of 2
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 295522
Project No.: 0711530
Date of Service: 08/14/2007
Report Date: 08/30/2007
Project: Point West Office I
Services: Straight Shaft Pier Inspection
Report of Inspection
D rille r: M cK innev D rillinQ
Pier Identification C 10 1 C 11 .4 C 12 C 12.5 G 102
Pier Diameter (in) 24 24 24 24 24
Depth of Pier From Surface (ft) 46.50 46.70 50.40 50.80 55.00
D e p th 0 f Be a ri n aStra tu m Fro m S u rfa ce (ft) 38.00 38.10 36.00 40.10 36.10
R e quire d P e netratio n (ft) 8.00 8.00 14.00 10.00 1 8.00
Actual Penetration (ft). 8.50 8.60 14.40 10.70 1 8.90
Condition of Bottom (wet/dry) D rv Dry Dry Dry Dry
Plumb Within Tolerance (ves Ino) Yes Yes Yes Yes Yes
CasinQ Diameter(in)/CasinQ Lenqth (ft) 26/38 26/38.1 26 136.0 26/40.1 26/36.1
NumberofBars IReinforcing BarSize 6 1#6 6 1#6 6 1#6 6 1#6 6 1#6
Lenath of Reinforcina Steel (ft) 4391 44.01 48.00 48.50 52.80
Time Drillina was Completed (am Ipm) 8 :31 AM 8:55 AM 9;18am 9:37 AM 11:51 AM
Time Concrete was Placed (am Ipm) 9:27 AM 10:00 AM 10;53am 11:40AM 12:32 PM
D e p th 0 f Pie r Fro m Top 0 f Con c re te (ft) 44.50 44.70 48.90 49.30 53.50
Elevation. Surface (to" 99.50 99.50 99.50 99.50 99.50
Elevation: Top of Pier (ft).. 97.50 97.50 98.00 98.00 98.00
Elevation: Bottom of Pier (ft).. 53.00 52.80 49.10 48.70 44.50
Elevation: Top of Bear in a Stratum (ft.)" 61 .50 61.40 63.50 59.40 63.40
BearinQ Stratum (description) G ra V S h a Ie
Note:See report# 295523 forCompressive StrengthTestSpecimens.
. Additional Penetration not requested unless noted. "Elevation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/KW) Page 1 of 3
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 295522
Project No.: 0711530
Date of Service: 08/14/2007
Report Date: 08/30/2007
Project: Point West Office I
Services: Straight Shaft Pier Inspection
D rille r: M cK inney Drilling
Pier Identification J /0 2 P /1 .4 P /02 P /2.5 P /3
PierDiameterlin) 24 24 24 24 24
Deoth of Pier From Surface 1ft) 52.20 46.50 50.20 48.00 46.60
Deoth of Bear in a Stratum Fro m Surface 1ft) 35.60 38.30 35.80 37.20 36.40
Reauired Penetration (ft) 16.00 8.00 14.00 10.00 10.00
Actual Penetration (ft)' 16.60 8.20 14.40 10.80 10.20
Condition of Bottom Iwet / dry) D rv Dry D rv D rv Dry
Plumb Within Tolerance Ives /no) Yes Yes Yes Yes Yes
Casina Diameter(in)/Casina Lenath (ft) 26/35.6 26/38.3 26 / 35.8 26 / 37.2 26/36.4
NumberofBars /Reinforcina BarSize 6 / # 6 6 / #6 6 / #6 6 / # 6 6 / #6
Lenath of Reinforcina Steel (ft) 51 .30 45.50 48.30 46.00 44.50
Tim e D ri IIi n a was Com n Ie te d (a m / 0 m ) 12 :22 PM 12:58 PM 1 :10 PM 1 :29 P M 2 :58 PM
Tim e Con c re te was P la c e d I am/om) 1 :14 PM 2:04 PM 3 :39 PM 3 :5 8 P M 4:12 PM
Deoth of Pier From Too of Concrete (ft) 51 .70 44.50 48.70 46.50 45.10
Elevation: Surface (ft).. 99.50 99.50 99.50 99.50 99.50
E Ie va ti 0 n: Too 0 f Pie r 1ft).. 99.00 9750 98.00 98.00 98.00
Elevation: Bottom of Pier 1ft).. 47.30 53.00 49.30 51 .50 52.90
Elevation: Too of Bear in a Stratum (ft.)" 63.90 61.20 63.70 62.30 63.10
Bearina Stratum Idescriotion) Grav Shale
Note: See report # 295523 for Com pressive Strength Test Specimens.
'Additional Penetration not requested unless noted. "E levation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/KW) Page 2 of 3
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 295522
Project No.: 0711530
Date of Service: 08/14/2007
Report Date: 08/30/2007
Project: Point West Office I
Services: Straight Shaft Pier Inspection
D rille r: M cK inne y Drilling
Pie rid e ntifica tio n P /3.5 P /4 P /4.5 P /5 P /5.5
Pier Diameter (in) 24 24 24 24 24
Depth of Pier From Surface (ft) 47.50 47.50 47.70 46.70 46.50
D e p th 0 f B e a ri n g S tra tu m Fro m S urfa ce (ft) 37.1 0 37.00 36.00 36.40 36.00
R e qui re d P e ne tra tio n (ft) 1 0.00 10.00 10.00 1 0.00 10.00
A ctua I P e ne tra tio n (ft)' 1 0.40 10.50 1 1 .70 1 0.30 1 0.50
Condition of Bottom (wet/dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes /no) Yes Yes Yes Yes Yes
Casing D i a mete r (i n) / Cas in g Len g th (ft) 26/37 .1 26 /37 26 26 26
NumberofBars /Reinforcing BarSize 6 / # 6 6 / #6 6 / # 6 6 / # 6 6 / #6
Length of Reinforcing Steel (ft) 45.50 44.40 46.00 44.80 44.50
Time Drilling was Completed (am / pm) 3 :1 2 PM 3 :46 P M 5 :05 PM 5 :20 P M 6 :0 9 PM
Time Concrete was Placed (am /pm) 4 :3 5 PM 5 :31 PM 5:48 PM 6 :3 2 P M 6 :49 P M
De p th 0 f P ie r Fro m Top 0 f Con c re te (ft) 46.00 46.00 46.20 45.20 45.00
Elevation: Surface (ft).. 99.50 99.50 99.50 99.50 99.50
Elevation: Top of Pier (ft).. 98.00 98.00 98.00 98.00 98.00
Elevation: Botto m of Pier (ft).. 52.00 52.00 51 .80 52.80 53.00
Elevation: Top 0 f Be a ri n g S tra tu m (ft.) .. 62.40 62.50 63.50 63.1 0 63.50
Bearing Stratum (d e s c ri p ti 0 n) G ra y S h a Ie
Note' See re port # 295523 for Com pressive Strength Test S pecim ens.
'Additional Penetration not requested unless noted. HE levation by others
Technician: Gerry Graham Started: 05:45am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Alln: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell Alln: Mr. Lee Stone
1-cc City of Coppell Alln: Mr. Larry Davis
Finished: 07:30pm Rone Engineering
~~~
K. Scott Watson, AET
Project Manager
LIMITATIONS The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, LId
(TM/KW) Page 3 of 3
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 295390
Project No.: 0711530
Date of Service: 08/13/2007
Report Date: 08/30/2007
Project: Point West Office I
Services: Straight Shaft Pier Inspection
Report of Inspection
D rille r: McKinney Drillinq
Pier Identification P 10 1 LlO 1 K 101 G .9/0 1 E .7/01
Pier Diameter (in) 24 24 24 24 24
Depth of Pier From Surface (ft) 50.00 4750 46.30 47.50 49.20
Depth of Bear in a Stratum Fro m S u rfa c e (ft) 40.80 36.20 36.00 36.80 39.00
Required Penetration (ft) 8.00 10.00 10.00 10.00 10.00
Actual Penetration (ft)' 9.20 1 1 .30 10.30 10.70 10.20
Condition of Bottom (wet/dry) Dry Dry Dry Dry Dry
P I u m b Wit hi n Tole ran c e (yes I no) Yes Yes Yes Yes Yes
Casinq Diameter(in)/Casinq Lenqth (ft) 26/40.8 26 I 36.2 26/36.0 26/36.8 26/39.
NumberofBars IReinforcing BarSize 6 1#6 6 1#6 6 1#6 6 1#6 6 1#6
Length ofReinforcina Steel (ft) 47.40 44.80 43.90 45.50 47.10
Time Drillina was Completed (am Ipm) 9 :0 1 AM 9:17 AM 9 :56 AM 11:12AM 12:32 PM
Time Concrete was Placed (am Ipm) 11:10AM 9:17 AM 9 :56 AM 11:12AM 12:32 PM
Depth of Pier From Top of Concrete ( ft) 47.80 46.00 44.80 46.00 47.70
E leva tio n: Surface (ft).. 99.50 99.50 99.50 99.50 99.50
Elevation: To p of Pie r (ft).. 97.30 98.00 98.00 98.00 98.00
Elevation: Bottom of Pier (ft).. 49.50 52.00 53.20 52.00 50.30
Elevation: Top of Bear in a Stratum (ft.)' , 58.70 63.30 63.50 62.70 60.50
Bearinq Stratum (description) G rav Shale
Note:See report# 295391 forCompressive StrengthTestSpecimens.
'Additional Penetration not requested unless noted. "Elevation by others
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/KW) Page 1 of 2
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Drilled Pier Inspection
Report No.: 295390
Project No.: 0711530
Date of Service: 08/13/2007
Report Date: 08/30/2007
Project: Point West Office I
Services: Straight Shaft Pier Inspection
D rille r: M cK inne y Drilling
Pier Identification D .8/01
PierDiameter(in) 24
D eo th 0 f P ie r Fro m Surface(ft) 50.00
Deoth ofBearino Stratum Fro m S u rfa c e (ft) 39.30
Reauired Penetration (ft) 10.00
A ctua I P e ne tra lio n (ft)' 10.70
Condition of Bottom (wet/dry) Dry
Plumb Within Tolerance (yes Ino) Yes
Casino Diameter(in)/Casino Lenoth (ft) 26/39.3
NumberofBars IReinforcino BarSize 6 1#6
Lenath of Reinforcina Steel (ft) 47.00
Time Drillina was Comoleted (am 10m) 1 :07 PM
Time Concrete was Placed (am 10m) 6 :20 PM
D eo th 0 f P ie r Fro m Too 0 f Con c re te (ft) 48.00
E Ie va ti 0 n: S urfa ce (ft)" 9 9.50
Elevation: Too of Pier (ft)** 97.50
Elevation: Botto m of P ie r (ft)** 49.50
Elevation: Too of Bear in a Stratum (ft.)** 60.20
Bearina Stratum (descriotion) G ra v S h a Ie
N ole See report # 295391 fo reo m pre s s ive S t re n 9 t h T est S pee i men s .
* Additional Penetration not requested unless noted .*E levation by others
Technician: Gerry Graham Started: 05:45am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell AUn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Finished: 07:00pm Rone Engineering
p~~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/KW) Page 2 of 2
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 295523
Project No.: 0711530
Date of Service: 08/14/2007
Report Date: 08/30/2007
Project: Point West Office I
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Potter Concrete
Plant: On site
Specification Requirements
Strength: 3,000 psi @ 28 days
Slump (in.): 5" - 7"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design I.D.: 7751 PW
Placement Date: 08/14/2007
Weather Conditions: Warm, clear
Time Sampled: 09:09am Batch time: 08:45am
Temperature - Air: 880F Concrete: 920F
Truck No: 110 Ticket No: NA
Air Content: NA Unit Weight (pcf): NA
Overall Placement Location:
Exterior foundation cased piers (see report #295522)
Measured
Slump
(inches)
5.75
Sample Location:
Pier C/01
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Maximum
Load
(Ibs)
93,040
Cylinder
Marked Date
Set No. Tested
1 1 08/21/2007
1 2 09/11/2007
1 3 09/11/2007
1 4 10/09/2007
Age
(days)
7
Diameter
(in)
6.00
28
28
56
Remarks: Water added at site: 25 gallons
Technician: Gerry Graham
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc Potter Concrete Attn: Mr. Ryan Skelly
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Area
(in2)
28.27
Compressive
Strength
(psi)
3,290
Fracture
Type
Unbonded Cap
Rone Engineering
p~.~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/KW) Page 1 of 1
Rone Engineering
.
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
Report of Water Injection Inspection
Report No.: 296900
Project No.: 0711530
Date of Service: 08/27/2007
Report Date: 08/30/2007
Project: Point West Office I
Services: Water Injection Observation
Report of Inspection
Description I Explanation
1. Specific gravity of lime was checked and found to be between 1.14 and 1.17
2. Lime slurry was continuously agitated
3. Surfactant was added to each load
4. The injection pressure was kept between 50 to 100 psi at point of injection
5. Intervals of 12" were achieved during injection process until refusal
6. Total depth of injection - 12'
7. Max. spacing of injection probes was recorded to be 5'
8. Free water on surface
9. Square feet injected on this date
10. Location of injection
NA
NA
---,--
Yes
Yes
Yes
Yes
Yes
IiiOO
144,000
Remarks: See attached for sketch of injected area, pass number for each area, and dimension of injection area.
Technician: Doug Mathies Started: 06:45am
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne
(1-ec copy)
1-cc City of Coppell Attn: Mr. Lee Stone
1-cc City of Coppell Attn: Mr. Larry Davis
Finished: 05:15pm Rone Engineering
P-dd- ~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(TM/LB) Page 1 of 1
i
I
I
i
i
I
i
I
~
I i
\}I
I
I
I
I
i
I
!
I
I
,
i
- 1
I
,
I
I
i
!
i
i
i
i
I
I
I
i
i
i
- i
i
!
i
I
I
I
I
i
I
I
I
I
I
I
!
i
I
I
i "
z.'.(~
"'.
j,J;J~ JJ,
,},,-L,..b J, ~""
i-~~ Jt.Jt.i
~lli ~t:t
tf~ 'i ~t
~i ttJ- ~
J- 1)., J, u.-J,
V .1, 4-J- Jt f
llt ~ J ~ -J, .J/
{ & ~ ~ *
11. \II \.it "\1,1
~ J/w \it
.v /l\ ,.,.. Ai' /f
fT' 'J" I'fo /II 1\
;: /fIJ~~
t7'111\11
J /JI /f' -1- ~
.-1 /I' 1 l' /f\
-1' -1' - .,. .1f\
-11 -1' l' ~ '1'-
/fI /f' J 11 '1-
r '71 l' -1' 11\ l'
1if1-~ 11';:~
If. l' /ft 11 ;' l'
11 l' /]I l' 1
1'1 1 l'
~
\i\
'-'1
<J)
-..:::::
'"
~
'^
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Com pressive Strength Test
Report No.: 295798
Project No.: 0711530
Date of Service: 08/16/2007
Report Date: 08/30/2007
Project: Point West Office I
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
Contractor: Duke Construction, LP
Concrete Supplier: Redi-Mix
Plant: 136
Specification Requirements
Strength: 3,000 psi @ 28 days
Slump (in.): 5" - 7"
Air (%): NA
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
Mix Design 1.0.: 830J1521
Placement Date: 08/16/2007
Weather Conditions: Clear
Time Sampled: 11 :32am
Temperature - Air: 930F
Truck No: 1039
Air Content: NA
Overall Placement Location:
Piers (see report #295797)
Batch time: 10:50am
Concrete: 950F
Ticket No: 13694307
Unit Weight (pcf): NA
Measured
Slump
(inches)
5.75
Sample Location:
Pier P/5.5
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 08/23/2007 7 6.00 28.27 92,550 3,270 Unbonded Cap
1 2 09/13/2007 28
1 3 09/13/2007 28
1 4 10/11/2007 56
Remarks: Water added at site: 10 gallons
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Alln: Mr. Brian Pierce (1-cc copy)
1-cc City of Coppell Alln: Mr. Lee Stone
1-cc City of Coppell Alln: Mr. Larry Davis
Rone Engineering
SOOReport295797focteoho",oo"mep ~ ~
K. Scott Watson, AET
Project Manager
Technician: Gerry Graham
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(LB/LB) Page 1 of 1