Loading...
Duke Lesley 3C-LR070824 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Report No.: 296399 Project No.: 0711530 Date of Service: 08/22/2007 Report Date: 08/24/2007 Project: Point West Office I Services: Straight Shaft Pier Inspection D rille r: McKinney Drilling Pier Identification F /1 2 F /1 3 PierDiameterlin\ 2 4/F 2 24 /F 2 De 0 th 0 f P ie r Fro m Surface 1ft) 52.00 48.70 Deoth of Bear in a Stratum Fro m Surface(ft) 3400 31 .00 Rea u i re d Pen e tra ti 0 n (ft) 16.00 16.00 Actual Penetration (ft)- 18.00 17.70 Condition of Bottom (wet/dry) D rv D rv P lu m b With i n Tole ra n c e (ye s / no) Yes Yes Casina Diameter(in)/Casina Lenath (ft) 26/36 26136 NumberofBars IReinforcina BarSize 6 1 # 6 6 / #6 Lenath of Reinforcina Steel (ft) 50.10 47.80 Time Drillina was Comoleted (am /om) 3 :47 P M 4:08 PM Time Concrete was Placed (am 10m \ 4 :3 5 PM 5:45 PM Deoth of Pier From Top of Concrete (ft) 51 .42 48.12 Elevation:Surface (ft).. 99.58 99.58 Elevation:Too ofPier(ft)** 99.00 99.00 Elevation: Bottom ofPier(ft)** 47.58 50.88 Elevation: Too ofBearinQ Stratum Ift.)** 65.58 68.58 Bearina Stratum (descriotion) Grayshale N ole See re porI # 296400 for Com pressive Strength Test Specim ens. . Additional Penetration not requested unless noted. HE levalion by others Technician: Denny Harris Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Alln: Mr. Brian Pierce (1-cc copy) 1-cc City of Coppell Alln: Mr. Lee Stone 1-cc City of Coppell Alln: Mr. Larry Davis Started: 06:15am Finished: 06:45pm Rone Engineering p-~.~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 2 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Report No.: 296399 Project No.: 0711530 Date of Service: 08/22/2007 Report Date: 08/24/2007 Project: Point West Office I Services: Straight Shaft Pier Inspection Report of Inspection D rille r: M cK innev D rillina Pier Identification H 114 H 115 H 116 H 117 F 11 1 Pier Diameter (in) 24/F 2 2 4/F 2 24 IF 3 2 4/F 3 2 4/F 2 Depth of Pier From Surface (ft) 48.80 48.20 49.90 50.50 51 .70 Depth of Bear in a Stratum From S urfa ce (ft) 32.80 32.00 31.60 31 .00 35.00 R e qui re d Pen e tra ti 0 n (ft) 16.00 16.00 18.00 18.00 16.00 Actual Penetration (ft)' 16.00 16.20 18.30 19.50 16.70 Condition of Bottom (wet I dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes I no) Yes Yes Yes Yes Yes Casina Diameter (in) ICasina Lenath (ft) 26/32 26/30 2 6 13 2 2 613 2 26/36 NumberofBars IReinforcing BarSize 6 1#6 6 1#6 6 1#6 6 1#6 6 1#6 Length of Reinforcing Steel (ft) 47.00 47.90 49.20 49.30 50.90 Time DrillinQ was Completed (am Ipm) 8 :3 7 AM 11:55AM 1 2 :56 PM 1 :47 P M 3:24 PM Time Concrete was Placed (am Ipm) 10:25AM 12:45 PM 1 :26 PM 2:20 PM 4:28 PM Depth of Pier From Top of Concrete (ft) 48.22 4762 49.32 49.92 51 .12 Elevation: Surface (fO" 99.58 99.58 99.58 99.58 99.58 Elevation: Top of Pier (ft)" 99.00 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (ft).. 50.78 51 .38 49.68 49.08 47.88 Elevation: Top ofBearinQ Stratum (ft.)" 66.78 6758 67.98 68.58 64.58 Bearina Stratum (description) G ray shale Note:See report# 296400 forCompressive StrengthTestSpecimens. 'Additional Penetration not requested unless noted. "Elevation by others LIMITATIONS The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 1 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Water Injection Inspection Report No.: 296396 Project No.: 0711530 Date of Service: 08/22/2007 Report Date: 08/24/2007 Project: Point West Office I Services: Water Injection Observation Report of Inspection Description I Explanation 1. Specific gravity of lime was checked and found to be between 1.14 and 1.17 NA 2. Lime slurry was continuously agitated n~__ nn 3. Surfactant was added to each load Yes 4. The injection pressure was kept between 50 to 100 psi at point of injection Yes 5. Intervals of 12" were achieved during injection process until refusal Yes 6. Total depth of injection -12' Yes 7. Max. spacing of injection probes was recorded to be 5' iJrn 8. Free water on surface .. .-iii'~ f~. 9. Square feet injected on this date (Injected on 1 st, 2nd and 3rd passes) . /----:I14,000 .5JL!L. . 10. Location of injection C -,./ ...-' Remarks: See attached for sketch of injected area, pass number for each area, and dimension of injection area. Technician: Donald Palterson Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Altn: Mr. Brian Pierce (1-cc copy) 1-cc City of Coppell Altn: Mr. Lee Stone 1-cc City of Coppell Altn: Mr. Larry Davis Started: 06:15am Finished: 04:45pm Rone Engineering P-dZ3f ~ K. Scott Watson, AET Project Manager LIMIT A nONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/LB) Page 1 of 1 t'- Cl "":::" 'In -:f'"'"I:;'"-- rlCJr::~ VI t- c:::l 0\ t-t-t- I l.-l~L...lCl Pt-<~G or'" .;; _"" 9 ~~~a 's:\g~;; >~ _::l ,. ,.... 't(") c c: .... ==>I. - s::<g.....p:; \..0 \..::) c:::r Q ~ ~ .:; -;;;. :;:;Ctl~ ~cr.J_~E' ...::J '-' - Q Z::jU -<~..:: <::l " <J 0-1: C"\:t:";j <::l;::i<i . .... ~:=. rl Mrl Orl t-..... r- z 0 j=( Z ~ Cd 0 ~ l=( F<. ... Z u 0 A ~ ~ ~ ~ <./) C> lf1 g .~. Z ~ f=\ l==': D ~ -:::r ~ OJ t: J==O k C!) <D b .= '01.>> b W Q,) b o rr: o z o Z H A d p s:Q o Z U) OJ ~ P-< :z: o k f--< U ~ %~ K 5a'O' r' l .i '! ! - .,-:;10 ,I l~ '=l ' I I .1 ~1L I ','I - I ~I ',-::: ,,"':J ." .,~~' 1';i ,,~.:~ I I .. ~ -= ." JJ . :i ":~ ~ ";!~~ [IU"c+i ~. R8..'j I,',>.:,; ~ I ~ .\..:.....1 t.' '. "s ; ~ . "<' ,~11 t,: .... "'.I~ l ,llleU I! f I,~~?,~ I i ~~.: "'~ >::0?7:.::;:;:::::-:'".:-X..'..:.....;.!"'...,.:.....,."..,...,............._...1.', :...:: ',' '''"'7'' ~ j : : ~"..~j ,',-"r ',:. :.'.~:...: :~J-;."":~; .:.....:;~~. .'-. I 1 i ~," '(ll" iU,'1J,ii;I-ni'"", "H",I'i",I,"I"l"J,r.,.oti;";"fl';~'","", ,"~;":,,,,;; , .' .', .>,.;--/ /~, ". -~='1{---~-- ~"V;:; .~!~"'~'~~~~A Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 293359 Project No.: 0713041 Date of Service: 07/25/2007 Report Date: 08/24/2007 Project: Grand Lakes II - Building Grand Prairie, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" maximum Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 9337 Placement Date: 07/25/2007 Weather Conditions: Sunny, light wind Time Sampled: 10:10am Batch time: 09:44am Temperature - Air: 850F Concrete: 900F Truck No: 139 Ticket No: 23164 Air Content: NA Unit Weight (pet): NA Overall Placement Location: See Driller report Measured Slump (inches) 5.5 Sample Location: Gridlines: B/16, Bf18 - Bf23, Cf22, C/23, 0/13 - 0/18, E/21 , Ef22 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 1 1 08/01/2007 7 6.00 28.27 86,620 3,060 Unbonded Cap 1 2 08/22/2007 28 6.00 28.27 120,240 4,250 Unbonded Cap 1 3 08/22/2007 28 6.00 28.27 122,980 4,350 Unbonded Cap Average 4,300 4 09/19/2007 56 Technician: Jimmy Scott Rone Engineering ~~:,o~"~:.~~~~~~~;oo, LP (0.11.., TX) "'to R,port 29:1358 fo< ""'0;0" !;m,. .. ~ .... LB~. '.' ..... . Att"M,.D,,;dM;II,,(l~"'py) ~~ ~ 1-ec Rone Engineering Services, Ltd. Attn: Mr. Larry Bracken K. Scott Watson, AET 1-ec Potter Concrete Alln: Mr. Brent Cox Project Manager LIMITATIONS The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar sUbject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LBILB) Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TJ( 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 293425 Project No.: 0711530 Date of Service: 07/25/2007 Report Date: 08/24/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 1 1 08/01/2007 7 6.00 28.27 90,220 3,190 Unbonded Cap 2 08/22/2007 28 6.00 28.27 119,980 Unbonded Cap 3 08/22/2007 28 6.00 28.27 116,720 Unbonded Cap Average 4 09/19/2007 56 Contractor: Duke Construction, LP Concrete Supplier: LMC Plant: 7 Specification Requirements Strength: 4,200 psi @ 28 days Slump (in.): 3" - 5" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 1701 Placement Date: 07/25/2007 Weather Conditions: Sunny Time Sampled: 03:15pm Temperature - Air: 940F Truck No: 1124 Air Content: NA Overall Placement Location: Manhole structure walls, cast in place junction box Measured Slump (inches) 4.0 Batch time: 02:09pm Concrete: 960F Ticket No: 7180288 Unit Weight (pcf): NA Sample Location: Station 0+73.22 * Does not comply with specified strength Remarks: Water added at site: 5 gallons Technician: Denny Harris See Report 293364 for technician time Report Distribution: Orig: Duke Construction, LP (Dallas, TX) AUn: Mr. Brian Pierce (1-cc copy) 1-cc City of Coppell AUn: Mr. Lee Stone 1-cc City of Coppell AUn: Mr. Larry Davis K. Scott Watson, AET Project Manager LIMITATIONS The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 1 of 1