Loading...
Kimbel Addn L8-12R-CS070919 THE.CiTY.OF - COPPELL September 19, 2007 Michael T. Doggett, P.E. Winkleman & Associates, Inc 6750 Hillcrest Plaza Dr. Suite 100 Dallas, TX 75230 RE: Kimbel Addition 2nd Construction Plan Review Comments The City of Coppell has reviewed the referenced plans, the plans as submitted meet our requirements The City of Coppell requires three sets of final construction plans for its use; your office should submit as many additional sets for stamping as is necessary for construction operations. All contractors and subcontractors onsite must have a copy of the plans approved by the City of Coppell. All fees must be paid prior to release of this project for construction. The City charges a 2% inspection fee for all private construction outside the building's footprint. This includes dirt work, paving, storm drains, water lines, sewer lines, drainage pipes, etc. that are private. For all installations in the public right-of-way or easement, the City charges a 4% fee. A check for inspection fees made to the City of Coppell should be submitted to this office along with the Construction Development Permit Application and a copy of the Construction Site Notice. For your convenience a spreadsheet is attached to the permit application for use in calculating the inspection fees. A copy of the contract(s) should be attached for verification purposes. The Contractor is responsible for maintaining As-Builts and should provide you with any changes that may occur. At the completion of the project please submit the As-Builts to this office to guarantee a completed product. If you have any questions, please contact this office at your convenience. .funcerely, Sr~7'" HT Graduate Engineer Office Phone: (972) 304-3679 Fax: (972) 304-3570 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/3043673