RE: Kimbel Addition
2nd Construction Plan Review Comments
The City of Coppell has reviewed the referenced plans, the plans as submitted meet our
requirements
The City of Coppell requires three sets of final construction plans for its use; your office should
submit as many additional sets for stamping as is necessary for construction operations. All
contractors and subcontractors onsite must have a copy of the plans approved by the City of
Coppell.
All fees must be paid prior to release of this project for construction. The City charges a 2%
inspection fee for all private construction outside the building's footprint. This includes dirt
work, paving, storm drains, water lines, sewer lines, drainage pipes, etc. that are private. For all
installations in the public right-of-way or easement, the City charges a 4% fee. A check for
inspection fees made to the City of Coppell should be submitted to this office along with the
Construction Development Permit Application and a copy of the Construction Site Notice. For
your convenience a spreadsheet is attached to the permit application for use in calculating the
inspection fees. A copy of the contract(s) should be attached for verification purposes.
The Contractor is responsible for maintaining As-Builts and should provide you with any
changes that may occur. At the completion of the project please submit the As-Builts to this
office to guarantee a completed product.
If you have any questions, please contact this office at your convenience.