Loading...
Vista Point 2R-CS070917 THE.CiTY.OF September 17, 2007 COPPELL "l/~~~.~~.':!\~...r:*..~~.~./l~S"!'~~ /' /~i'" /-"//:;t~ \) J: ~"--., . "'uP " .\' II t:/ . \ l\ Jimmy Parrott Bullard Construction P.o. Box 575 Addison, TX 75001 Fax: 972/661-8985 RE: Vista Point II, Lot 2R Block A Final Acceptance Conditions Dear Mr. Parrott: On July 2, 2007 a walk-through inspection was conducted for the referenced project. It appears that all punchlist items have been completed. An error was discovered in our records regarding the letter sent to you on July 26, stating that the two year maintenance bonds and as-built drawings were received from the contractor. At this time, the remaining requirements for sign-off on the CO must be supplied. They are as follows: 1. Provide a maintenance bond from a registered surety for 50% of the contract value of work performed in the public right-of-way and easements for a 2-year period beginning on the date of final acceptance. 2. Provide record drawings of the public improvements from the engineer to be submitted to City of Coppell Engineering Department. As-builts consist of I set full size paper copy, 1 set full size mylar and CD with Autocad.dwg files. Once these items have been received, reviewed and accepted, I will sign off on the CO and send a final acceptance letter. If you have any questions, please call me at 972/ 304-3679. Sinc~4 (1/1/6 ())gp Rick O'Dell Construction Inspector Office Phone: 972/304-7090 Fax: 972/304-3570 cc: Kenneth M. Griffin, P.E., Director of Engineering & Public Works Glenn Hollowell, P.E., Assistant Director of Public Works Greg Jones, Chief Building Official Tim Oates, Fire Marshal Steven M. Heilbrun, Pacheco Koch, Fax: 972/235-9544 Attachment 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 CITY OF COPPELL ENGINEERING DEPARTMENT ,...e CITY OP corrELL "Qpo~~~ . ~~. 1,4"~~O . " " ' " Record-DrawinQ Content and Submittal Requirements As required by Section XV of the City of Coppell Subdivision Regulations, signed and sealed Record-drawings (As-built plans) must be submitted by the Engineer of a project before final acceptance of the public improvements can be granted. Public Improvements include, but are not limited to: Paving (in and out of the R OW.), water lines, sanitary sewer lines, storm sewer lines, sidewalks, ramps and other accessible routes, stamped concrete and engineered retaining walls. For the purpose of this document, the terms "As-built" and "Record-drawing" shall be considered interchangeable and synonymous. Section XV of the City of Coppell Subdivision Regulations reads as follows: SUBDIVISION REGULATIONS. CITY OF COPPELL, TEXAS SECTION XV - AS-BUILT PLANS SECTION XV - AS-BUlL T PLANS Prior to final acceptance by the City of the public improvements in the subdivision, the Engineer for the Developer shaJI submit to the Engineering Department a reproducible mylar set of drawings and two (2) sets of blue line prinl3 of paving, drainage, waler, sanitary sewer and ()ther improvements showing all changes made in the plans during construction and containing on each sheet an "As-BuUt" stamp bearing the signature of the Engineer and the date. If the design of the improvements was computer generated, a diskette shall be subm itred containing all improvements in an AutoCad format that can be transferred to the City's data base. END OF SECTION P.gelof4 CITY OF COPPELL ENGINEERING DEPARTMENT Record-Drawing Submittal Procedures 1 Upon substantial completion of the Civil improvements of the Project, as determined by a City of Cappel! Engineering inspector, the construction plans documenting any and all contractor changes or deviations from the plans as originally approved should be returned to the Project Engineer for revision. 2. The Project Engineer shall revise the construction plans to reflect the "as- constructed" state of the Project. These revised plans shall bear the Project Engineer's seal, signature, date and "As-Built" or "Record-Drawing" stamp on each sheet. 3. One 2411x36" (D-size) paper copy of the "Record-Drawing" construction plans shall be delivered to the City of Coppell Engineering Department for review. Upon review completion, one of the following will occur: a. The Project Engineer will be notified that the Record- Drawings are acceptable with no comments b The Project Engineer will be notified that the Record- Drawings contain City of Coppell Engineering Department comments. The construction plans will be returned to the Project Engineer for revision and re-submittal for final approval. 4 At such time that the Record-Drawings are deemed acceptable by the City of Coppell Engineering Department, the Project Engineer shall submit the following items to the Engineering Department a Two sets of Architectural D-size Record-Drawings on paper. b. One set of Architectural D-size Record-Drawings on mylar. Page 2 0 r 4 CITY OF COPPELL ENGINEERING DEPARTMENT C. One CD containing the electronic files of the Record-Drawings in AutoCad dwg format, release 14 or later version Ensure that any X-ref layers or linked images are included 5 Completion of steps 1-4 will result in the Record-Drawing submittal portion of the final acceptance process being satisfied. Common Record-Drawing Submittal Pitfalls The City of Coppell Engineering Department will make every effort to assist in the successful submittal of engineering Record-Drawings. It is understood that every project has its share of complications: however, the following "reasons" for incorrect or non-existent Record-Drawings are unacceptable: . The drawings were sent to the "City", (Submittals must be sent to the Engineering Department accompanied by a submittal letter). . The drawings were sent to the architect. (Submittals must be sent to the Engineering Department accompanied by a submittal letter). . The drawings were sent to the owner. (Submittals must be sent to the Engineering Department accompanied by a submittal letter). . The drawings were sent to the contractor. (Submittals must be sent to the Engineering Department accompanied by a submittal letter). . Record-drawings were not in the contract. (Record-Drawings must be submitted and approved before acceptance of a project). . The project is on private property. (Even a project which is constructed entirely on private property can contain elements which fall within the jurisdiction of the Engineering Department, i e." Public utility taps/tie-ins, paving, accessibility, utility conflicts, easements and R. O. W.). . "We gave them to somebody." (This is where the submittal letter comes in handy It would show to what department the drawings were delivered and who Signed for them) PageJof4 CITY OF COPPELL ENGINEERING DEPARTMENT Summary Record-Drawings are essential to the maintenance of the City's municipal infrastructure database. Public works departments, developers, contractors, consulting engineers, government agencies, police and fire departments, educators and citizens all depend on Record-drawing information Accurate and complete data is essential to reducing errors, mis-information and utility disruptions. Thank you in advance for your cooperation. City of Coppell Engineering Department 255 Parkway Blvd. Coppell, TX 75019 972/304-3679 enqineerinq@ci.coppell.tx.us wwwclcoppell.txus Page 4 of4