Loading...
Duke Lesley 2A-LR070906 Project: Hemisphere's at Point West ~o Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): NA Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 1U.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 296910 Project No.: 0712932 Date of Service: 08/27/2007 Report Date: 09/06/2007 I. fl Y'; PROJECT DATA Mix Design I.D.: 7751 PW Placement Date: 08/27/2007 Weather Conditions: Partly cloudy Time Sampled: 03:43am Batch time: 03:20am Temperature - Air: 1000F Concrete: 950F Truck No: 120 Ticket No: 13210 Air Content: NA Unit Weight (pet): NA Overall Placement Location: --Piers (see report #296909) Measured Slump (inches) 6.75 Sample Location: Pier E/12 REPORT OF TESTS Cylinder Marked Date Set No. Tested 2 1 09/03/2007 2 2 09/03/2007 2 3 09/24/2007 2 4 09/24/2007 2 5 10/22/2007 Age (days) 7 7 Diameter (in) 6.00 6.00 28 28 56 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 91,650 92,990 Average Compressive Strength (psi) 3,240 3,290 3,270 Fracture Type Unbonded Cap Unbonded Cap Area (in') 28.27 28.27 Technician: Chris Harbour Rone Engineering See Report 296909 for technician time~~ Report Distribution: ,.' ". -------.... Origo D,ke Co",'mctioo, LP (0.11", lX) Moo Me P,"' Byme '. .. . ." .- _-.~- - .~ (1-ec copy) ',.' .- 1-cc Potter Concrete Attn: Mr. Ryan Skelly K. Scott Watson AET 1-cc City of Coppell Attn: Mr. Lee Stone p . t M ' 1-cc City of Coppell Attn: Mr. Larry Davis roJec anager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/LB) Page 2 of 2 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 296910 Project No.: 0712932 Date of Service: 08/27/2007 Report Date: 09/06/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): NA Air (%): NA Test Method: ASTM C-172 AS TM C-31 (except 10. -: .2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7751 PW Placement Date: 08/27/2007 Weather Conditions: Clear Time Sampled: 1 0:40am Temperature - Air: 980F Truck No: 120 Air Content: NA Overall Placement Location: Piers (see report #296909) Batch time: 1 0:20am Concrete: 920F Ticket No: 13196 Unit Weight (pcf): NA Measured Slump (inches) 5.5 Sample Location: Pier F/11 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 1 1 09/03/2007 7 6.00 28.27 87,630 3,100 Unbonded Cap 1 2 09/03/2007 7 6.00 28.27 85,840 3,040 Unbonded Cap Average 3,070 3 09/24/2007 28 4 09/24/2007 28 5 10/22/2007 56 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar SUbject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/LB) Page 1 of 2 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 297067 Project No.: 0712932 Date of Service: 08/28/2007 Report Date: 09/06/2007 Project: Hemisphere's at Point West Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): NA Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ;\STM C.231-- ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 7751 PW Placement Date: 08/28/2007 Weather Conditions: Partly cloudy Time Sampled: 03:40pm Batch time: 03:06pm Temperature - Air: 990F Concrete: 920F Truck No: 101 Ticket No: 13229 Air Content: NA Unit Weight (pet): NA Overall Placement Location: Piers (see report #297066) Measured Slump (inches) 6.5 Sample Location: Pier J/13 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 1 1 09/04/2007 7 6.00 28.27 80,830 2,860 Shear 1 2 09/04/2007 7 6.00 28.27 84,730 3,000 Shear Average 2,930 3 09/25/2007 28 4 09/25/2007 28 5 10/23/2007 56 Technician: Chris Harbour Rone Engineering See Report 297066 for technician time~~ Report Distribution: . . . . ~ 0"9' ~".':~ ;;;,:~t'"cti,", LP (0'''",. TX) Atl" Me, p", Byme " . ' , '. ',_ ~ 1-cc Potter Concrete Attn: Mr. Ryan Skelly K. Scott Watson, AET 1-cc City of Coppell Attn: Mr. Lee Stone. Pro'eet Manager 1-cc City of Coppell Attn: Mr. Larry DaVIS J LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/LB) Page 1 of 1