Loading...
Gateway BP(3.1)-LR070830 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 Report of Reinforcing Steel Inspection Report No.: 296496 Project No.: 0712786 Date of Service: 08/22/2007 Report Date: 08/30/2007 Project: Gateway Business Center Coppell, Texas Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Paving, area G, part 1, osuth of building 2 and leave outs for building 1. Item s Inspected Co nfo rm ing Non Item 5 Ins pected: Co nfo rm ing Non Item s Inspected: Conforming Non Conforming Conforming Co nlo rm ing P lacing Drawings Bar Length Column Ties Properly Appro ved x and Shape x Tied and Spaced NA Bar Size x Proper Bar Placement o_ x Stirrup Spacing NA ~- --- --- ...._" ---,,---"'-"'-r" ... "-.-.. Bar Grade x Pro perly Tied x stirrup Type NA Bars Clean x Dowel Bars in Place x Lapped Splices x Form Clean x Pro per Bar Suppa rts x Corner Bars NA NumberofBars x ProperCover x Mechanical Splices NA Discrepancies I Comments: No apparent discrepancies were noted at the locations listed above, LIMITATIONS The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no cDntrDI. Our letters and reports are for the exclusive use of the clients tD whom they are addressed and shall not be reproduced except in full withDut the written approval Df Rone Engineering Services, Ltd. (TM/LB) Page 1 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 Report of Reinforcing Steel Inspection Report No.: 296990 Project No.: 0712786 Date of Service: 08/27/2007 Report Date: 08/30/2007 Project: Gateway Business Center Coppell, Texas Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Paving, parking lot, southwest section, southwest of building 2. Item s Ins peeled co nfo rm Ing Non Items Inspected: Co nfo rm ing Non Item sIns peeted' Conforming Non Conforming Co nfo rm ing Co nfo rm ing Placing Drawings Bar Length ColumnTies Properly Appro ved x and Shape x Tied and Spaced NA Bar Size x Proper Bar P lac,:,!,_~_ x Stirrup Spacin9.. NA --_.. -- -- _>.. ---_.-~._.. ..-- .- -.. ._------- _.u__ -- ~--_. _._- _. -----:- --"-'..-'.-.'-' ,~_." I . BarGrade x Pro perty Tied x Stirrup Type NA Bars Clean x Dowel Bars in Place x Lapped Splices x Form Clean x Proper Bar Suppa rts x Co mer Bars NA Numberaf Bars x ProperCover x Mechanical Splices NA Discrepancies / Comments: No apparent discrepancies were noted at the locations listed above. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMlLB) Page 1 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 Report of Structural Steel Inspection Report No.: 606737 Project No.: 0712786 Date of Service: 08/22/2007 Report Date: 08/30/2007 Project: Gateway Business Center Cappell, Texas Services: Structural Steel Inspection Report of Inspection Structural Fram ing Location: 2nd floor fram ing, visual weld and bolt tension verification, partial inspection, building 1, grid lines 1.19/A-E. I r.... n: ;; Ii :w t ! (' ,-. j~ ~ ~i :l n t I A W ~ n 1 1 Code - .. " , - , I - . .~.... -'7 " -...~ ... .. ...--.....-..,.. - .~. ...., Bolt Tension Verification: Beam to Beam x x x Bolt Tension Verification: Beam to C 0 I u m n x x x Bolt Tension Verification: Girder to Colum n Weld Profile x x x x WQT's Structu ral Visual Touch-Up Paint Verification AI!=: C J~h S "'!"':'" Com m ents: LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMILB) Page 1 of 4 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 Report of Structural Steel Inspection Report No.: 606737 Project No.: 0712786 Date of Service: 08/22/2007 Report Date: 08/30/2007 Project: Gateway Business Center Coppell, Texas Services: Structural Steel Inspection L 0 c a ti 0 n' Bar J 0 is ts Perimeter angle, buildings 1 and 2, visual weld verification. Non Cod e Com p lia nt Compliant AWS D 1 .1 S J I Job Specs Joist Seat Bearina Visual Weld Verification x x x Horizontal Bridaina D iaaonal B ridaina Botto m C h 0 rd S ta b iliza tio n JoistSoacina '-F' el+mtne:'f:'tiO-or-q e !\ n q If.: '<i~j e ili 1"v'-~tr'n;crii1rn ----- ..- --~-- - , ' ,- . - Xc _._- ^~ ---_.- - W Q T's S tructura I Visual Touch-Up Paint Verification, BarJoist Welds at S tru c tu ra I F 100 r F ra m in a Ass e m b Iy Comments:Perimeterangle notwelded atallrequired locations. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/LB) Page 2 of 4 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 Report of Structural Steel Inspection Report No.: 606737 Project No.: 0712786 Date of Service: 08/22/2007 Report Date: 08/30/2007 Project: Gateway Business Center Cappel I, Texas Services: Structural Steel Inspection She e IDe c k A Ita c h men 110 S Iru c tu ra IF ra m in g Location: Building 1, roof deck weld and Tek screw verification, grid lines 1-19/A-E deck weld and Tek screw verification. qrid lines 1-17/A-E Building 2, roof Non C ode C om pliant C omoliant AW S D 1 .3 S D i Job Specs Vis u a I Veri fi c a Ii 0 n P u d d Ie W e Id s x x x x VisualVerification P ow der A cluated V isua I V e rifica tio n Pneum a Ii c V isua I V e rifica lio n T e k Sere w s at Sid e Lap s x x x Sheet D e c k M e c h ani cally Faslened with Self Tap pin g Sere w s - , , " I U e L d ~ -> Wi e (; il d (I i C d 11y L rj III p e: J .. , S he e t D e c k Inle rio r A tta chm e nl Pattern x x x x S he e t D e c k P e rim e te r A tta c h m en t P a lie rn x x x x N e Is 0 n S tu d Verification W Q T's She e I S te e I Comments:Welds missing, incomplete fusion and Tek screws nol installed al side laps at various locations. Block outareas not inspected atthis lim e. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/LB) Page 3 of 4