Loading...
Gateway BP(3.1)-LR070829 Rone Engineering . Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 295839 Project No.: 0712786 Date of Service: 08/16/2007 Report Date: 08/29/2007 Project: Gateway Business Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Constructors & Associates Concrete Supplier: Redi-Mix Plant: 136 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 3" - 5" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 A.ST~~ C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 33551501 Placement Date: 08/16/2007 Weather Conditions: Clear, warm Time Sampled: 11: 15am Batch time: 10:34am Temperature - Air: 900F Concrete: 920F Truck No: NA Ticket No: 13694305 Air Content: 1.4% Unit Weight (pcf): NA Overall Placement Location: Leave outs, building 1, grid lines Al1-2, Al5-9, E/1-5, A-E/1 Measured Slump (inches) 4.5 Sample Location: Leave out, building 1, grid line Al7.5 REPORT OF TESTS Concrete Compressive Cylinder 5" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 1 1 08/23/2007 7 6.00 28.27 111 ,170 3,930 Unbonded Cap 2 09/13/2007 28 3 09/13/2007 28 4 10/11/2007 56 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/LB) Page 1 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214)630-9745 Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 Report of Reinforcing Steel Inspection Report No.: 296178 Project No.: 0712786 Date of Service: 08/20/2007 Report Date: 08/29/2007 Project: Gateway Business Center Coppell, Texas Services: Reinforcing Steel Inspection Report of Inspection Locations and Items Inspected: Grade beams, south side of building 1, grid lines 7.5-10.0, F and building 2, grade beam. Item sins pected: Conforming Non Items Inspected: Co nfo rrn ing Non Items Inspected: Co nfo rm ing Non Conforming Co nfo rm ing Conforming Placing 0 rawings Bar Length Column Ties Properly Appro ved x and Shape x Tied and Spaced NA Bar Size x -f-.- p~per_!?.~~e":'':'2t x Stirrup Spacing x -- -. .,-- ------- -- --- ---. .-.-r--...-.-----~T"'.. ...-....~..-.---..-- '-"-"~'---' , BarGrade x Pro perly Tied x Stirrup Type x Bars Clean x Dowel Bars in Place x Lapped Splices x Form Clean x Proper B ar Suppa rts x Corner Bars NA N urn ber of Bars x ProperCover x Mechanical Splices NA Discrepancies / Comments: 1. Remove loose debris from placement area. 2. Tie down reinforcing steel at various locations. 3. Adjust steel to prevent burning (touching). Discrepancies noted above were corrected prior to concrete placement. LIMITATIONS The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMfLB) Page 1 of 2 Rone Engineering . Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 296270 Project No.: 0712786 Date of Service: 08/21/2007 Report Date: 08/29/2007 Project: Gateway Business Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Constructors & Associates Concrete Supplier: Redi Mix Plant: 88 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 5% Test Method: ASTM C-172 ,\_'; JVl C-.J: ts;(cept r, ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 23601524 Placement Date: 08/21/2007 Weather Conditions: Clear Time Sampled: 04:00am Temperature - Air: 750F Truck No: 1310 Air Content: 5.0% Overall Placement Location: Batch time: 03:01 am Concrete: 830F Ticket No: 88053366 Unit Weight (pcf): NA Measured Slump (inches) 6.0 , " .._/ : )r1';.'Ing, j ;;.;;rtr: ;;I!. :J~gl~~C~, .2J', :51" ....~':;..:,,: 1.:' tj,;L ceg!"'~e~, L.'-.." 2:' \J/C~l; ~1rl.:.~.:...':t 'g:~ac~ntJ plan south Sample Location: Same as above REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 1 1 08/24/2007 3 6.00 28.27 65,640 2,320 Unbonded Cap 1 2 08/28/2007 7 6.00 28.27 81,110 2,870 Unbonded Cap 1 3 09/18/2007 28 4 10/16/2007 56 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar SUbject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 1 of 6 Rone Engineering . Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 296270 Project No.: 0712786 Date of Service: 08/21/2007 Report Date: 08/29/2007 Project: Gateway Business Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Constructors & Associates Concrete Supplier: Redi Mix Plant: 88 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 5% Test Method: ASTM C-172 f\ST"fv1 <:::-31 (Bxcel-ll iG. 1.2.) ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 23601524 Placement Date: 08/21/2007 Weather Conditions: Clear Time Sampled: 05:00am Temperature - Air: 790F Truck No: 1219 Air Content: 5.3% Overall Placement Location: t-'avfhg--;-::o~n jl1-{1ea"~e6, .!..5, j f 'Ji:)::! to /1.2 oe1"lr~'lS, 2~' t' \'-T~(.:pg (;2.0-.[ graotrrg:- plan south Batch time: 04: 16am Concrete: 870F Ticket No: 88053374 Unit Weight (pet): NA Measured Slump (inches) 5.5 Sample Location: Same as above REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 2 1 08/24/2007 3 6.00 28.27 67,270 2,380 Unbonded Cap 2 2 08/28/2007 7 6.00 28.27 81,360 2,880 Unbonded Cap 2 3 09/18/2007 28 2 4 10/16/2007 56 LIMITATIONS The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 2 of 6 Rone Engineering . Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 296270 Project No.: 0712786 Date of Service: 08/21/2007 Report Date: 08/29/2007 Project: Gateway Business Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Constructors & Associates Concrete Supplier: Redi Mix Plant: 88 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 5% Test Method: ASTM C-172 -. :<\5; IV1 (: j 1 \.exC8pll0. (2")--~ ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 23601524 Placement Date: 08/21/2007 Weather Conditions: Clear Time Sampled: 06:00am Temperature - Air: 780F Truck No: 1260 Air Content: 5.0% Overall Placement Location: Batch time: 05:23am Concrete: 870F Ticket No: 88053382 Unit Weight (pcf): NA Measured Slump (inches) 5.0 -t":J'J:hg,n0ftn ~\- .::c~Tc::it", LJ., j 1 ,; v"iGt..l iv /I~ aeg-reoE, .i.-:1' -S':-jNest:-pg' i-.r-~-.u-T grad111g---- pian south Sample Location: Same as above REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 3 1 08/24/2007 3 6.00 28.27 72,660 2,570 Unbonded Cap 3 2 08/28/2007 7 6.00 28.27 88,830 3,140 Unbonded Cap 3 3 09/18/2007 28 3 4 10/16/2007 56 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (lB/lB) Page 3 of 6 Rone Engineering . Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 296270 Project No.: 0712786 Date of Service: 08/21/2007 Report Date: 08/29/2007 Project: Gateway Business Center Cappell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Constructors & Associates Concrete Supplier: Redi Mix Plant: 88 Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 4" - 6" Air (%): 3% - 5% Test Method: ASTM C-172 ,\51":\1:-(, 3! \r:;-~€p"t 'iQ.--(~2). ASTM C-143 ASTM C-231 ASTM C-1 064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 23601524 Placement Date: 08/21/2007 Weather Conditions: Clear Time Sampled: 1 0:40am Temperature - Air: 810F Truck No: 1342 Air Content: 5.3% Overall Placement Location: Batch time: 09:48am Concrete: 900F Ticket No: 88053415 Unit Weight (pet): NA Measured Slump (inches) 5.5 -F.J'Jlng, ; ;orfil:jl}{:Jcgrce5, ~~S-,-~'! SiJe-::f ie '~...:: -j2'gTcbC, --,!.<j' :5: '.9cst~ W'::L::;(:rt1rtaCi~g- '~- ---- pian south Sample Location: Same as above REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in2) (Ibs) (psi) Type 4 1 08/24/2007 3 6.00 28.27 71,250 2,520 Unbonded Cap 4 2 08/28/2007 7 6.00 28.27 89,920 3,180 Unbonded Cap 4 3 09/18/2007 28 4 4 10/16/2007 56 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 4 of 6 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Transwestern Commercial Services 5001 Spring Valley Dallas, TX 75244 Report of Concrete Compressive Strength Test Report No.: 296270 Project No.: 0712786 Date of Service: 08/21/2007 Report Date: 08/29/2007 Project: Gateway Business Center Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Remarks: Water added at site: 15 gallons LIMiTATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 5 of 6