Loading...
DR9001-CS 920210PACHECO KOCH Consulting Engineers, Inc. February 10, 1992 PK No: 1008-90.010 Mr. Larry Davis City of Coppell P.O. Box 478 Coppell, Texas 75019 BY:. Engineering Re: Connell Skaggs Addition Drainage Improvements Punch List Dear Mr. Davis: At your request, I have reviewed the construction of the box culvert and related improvements for the referenced site. The work appears to be substantially complete, with the exception of the following item: The area west of the Woodside Village shopping center requires some finish grading. I have reviewed the timing for completion of this grading with Mr. Danny Buckelew, Cullum Construction Company's subcontractor for the site. He stated that the areas were wet at the time of the finish grading of the remainder of the work area and that this regrading will be complete within two weeks of the date of this letter. Since this work is outside of any City easement, we are requesting the City accept the project at this time. If you have any questions please give me a call. Sincerely, Koch, Jr., P.E. JAK/tbj 1004-43 cc: Mr. Mark Connell, Connell Development Co. Mr. Phil Cullum, Cullum Construction Co. Mr. Danny Buckelew, Buckelew Construction Co. 9401LBI Freeway * Suite 300 * Dallas, Texas 75243 * (214) 235-3031 · Fax (214) 235-9544