Loading...
Duke Lesley 3C-LR070913 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 P Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: On site Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" - 7" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 L,~Tr\jl C~106.4 ASTM C-138 ASTM C-39 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test ~ Report No.: 295523 ~1'~1I ~rOject No.: 0711530 c,. ate of Service: 08/14/2007 o eport Date: 09/13/2007 e location erform required testing, cast compressive strength samples and bring ordance with applicable standards. PROJECT DATA Mix Design I.D.: 7751PW Placement Date: 08/14/2007 Weather Conditions: Warm, clear Time Sampled: 09:09am Batch time: 08:45am Temperature - Air: 880F Concrete: 920F Truck No: 110 Ticket No: NA Air Content: NA Unit Weight (pet): NA Overall Placement Location: Exterior foundation cased piers (see report #295522) Measured Slump (inches) 5.75 Sample Location: Pier C/01 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in') (Ibs) (psi) Type 1 1 08/21/2007 7 6.00 28.27 93,040 3,290 Unbonded Cap 1 2 09/11/2007 28 6.00 28.27 112,430 3,980 Cone/Shear 1 3 09/11/2007 28 6.00 28.27 108,670 3,840 Cone/Split Average 3,910 1 4 10/09/2007 56 Remarks: Water added at site: 25 gallons Technician: Gerry Graham Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc Potter Concrete Attn: Mr. Ryan Skelly 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Rone Engineering p~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in Quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TM/KW) Page 1 of 1