Loading...
Duke Lesley 3C-LR070908 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630.9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Report No.: 297379 Project No.: 0711530 Date of Service: 08/30/2007 Report Date: 09/08/2007 Project: Point West Office I Services: Straight Shaft Pier Inspection Report of Inspection D rille r: McKinney Drilling Pier Identification A /16 A /15.5 A /15 A /1 4.5 A /14 Pie r D i a mete r (i n) 2 4/F 1 2 4/F 1 2 4 /F 1 2 4/F 1 2 4/F 1 De p th 0 f Pie r Fro m Surface(ft) 44.00 46.20 45.90 46.00 43.00 D e p th 0 f Be a ri noS tra tu m Fro m S u rfa c e (ft) 33.00 35.80 35.60 35.30 32.00 Required P e ne tra tio n (ft) 10.00 10.00 10.00 10.00 10.00 Actual Penetration (ft)' 11 .00 10.40 10.30 10.70 11 .00 Condition of Bottom (wet/dry) Dry D rv D rv D rv Dry Plumb Within Tolerance (ves /no) Yes Yes Yes Yes Yes Casino Diameter(in)/Casino Lenoth (ft) 26/32.1 26/36 2 6 /3 6 2 6/3 6 2 6/3 2 .1 ,.I\II:!D1_bp. r () fR.!!.L~. 1..B_~.Ln fo r0!1Jl.. Ba r Size 6 / #6 6 / #6 .- 6 / #6 6 1#6 6 / #6 .. .d Len g th' o't Reln'fo rc i no S te e I (ft) - - -' 42.00 - -- 44.00 43.60 44.00 41.00 Tim e D rillino was Com oleted (am 10m) 9 :00 AM 9:55 AM 1 0 :45 A M 1 1 :47 AM 12:36 PM Time Concrete was Placed (am / n m) 10:30 AM 1 0 :4 5 AM 12:40 PM 1 :00 PM 2:00 PM Depth of Pier From Too 0 f Con c re te (ft) 42.42 44.62 44.32 44.42 41 .42 Elevation: Surface (ft).. 99.58 99.58 99.58 99.58 99.58 Elevation: Too of Pier (ft).. 98.00 98.00 98.00 98.00 98.00 Elevation: Bottom ofPier(ft).. 55.58 53.38 53.68 53.58 56.58 Elevation: To p of Be a rino Stratum (fl.\" 66.58 63.78 63.98 64.28 67.58 Bearino Stratum (description) G rav shale Note: See report # 297380 for Com pressive Strength Test S pecim ens. . Additional Penetration not requested unless noted. .'E levation by others LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 1 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Report No.: 297379 Project No.: 0711530 Date of Service: 08/30/2007 Report Date: 09/08/2007 Project: Point West Office I Services: Straight Shaft Pier Inspection D rille r: M cK inney D rillina Pie r Id e ntifica tio n A 11 3.5 A 113 A 112.5 PierDiameter(in) 2 4 IF 1 2 4 IF 1 2 4/F 1 Depth of Pier From Surface(ft) 47.60 43.00 46.30 Depth of Bearing Stratum Fro m Surface(ft) 36.00 32.60 35.60 ReQuired Penetration (ft) 10.00 10.00 10.00 A ctua I P e netra tio n (ft)" 1 1 .60 10.40 10.70 Condition of Bottom (wet I dry) D rv Dry Dry Plumb Within Tolerance (yes Ino) Yes Yes Yes Casing D iam eter (in) I C asina Lenath (ft) 26/36 2 6 13 2 .1 26/36 NumberofBars IReinforcina BarSize 6 1#6 6 1#6 6 1#6 Length of ReinforcinQ Steel (ft) 45.00 41.00 44.50 Time DrillinQ was Completed (am Ipm) 1 :30 PM 2 :2 5 PM 3:15 PM i1""e Cuul",..,te VIIa;s ;>Iaced (am Ipm) ~2:15~M ~:35 PM. . t-:t)-(t--P-M-- -. .- ----. - - - - Depth of Pier From Too of Concrete (ft) 46.02 41.42 44.72 E Ie va ti 0 n: S u rfa c e (ft)"" 99.58 99.58 99.58 E Ie va ti 0 n: Top 0 f Pie r (ft) ** 98.00 98.00 98.00 E Ie va tio n: Botto m of Pier (ft)** 51 .98 56.58 53.28 E Ie va ti 0 n : Top of Bearina Stratum (ft.)** 63.58 66.98 63.98 Bearing Stratum (description) G ra v s h a Ie Note: See report # 297380 for Compressive Strength Test Specimens. . Additional Penetration not requested unless noted. HE levation by others Technician: Denny Harris Started: 06:15am Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Finished: 04:30pm Rone Engineering p~~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, ltd. (CH/LB) Page 2 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Report No.: 297518 Project No.: 0711530 Date of Service: 08/31/2007 Report Date: 09/08/2007 Project: Point West Office I Services: Straight Shaft Pier Inspection Report of Inspection D rille r: M cK innev D rillinQ Pie r Id e ntifica tio n A 112 A 11 1 .5 A 11 1 A 110.5 A 110 PierDiameter(in) 2 4/F 1 2 4/F 1 2 4/F 1 2 4 IF 1 2 4/F 1 Depth of Pier From S urfa ce (ft) 47.30 44.00 47.00 44.60 46.60 Depth ofBearinQ Stratum Fro m S urfa ce (ft) 37.00 32.70 36.30 33.40 36.30 Reauired Penetration (ft) 10.00 10.00 10.00 1 0.00 10.00 Actual Penetration (ft)" 10.30 1 1 .30 10.70 1 1 .20 10.30 Condition of Bottom (wet I d rv) Dry Dry Dry D rv Dry Plumb Within Tolerance (ves Ino) Yes Yes Yes Yes Yes CasinQ Diameter(in)/Casina Lenath (ft) 26/36 2 6 13 2 .1 2 6/3 6 2 6 13 2 .1 26/36 fIJ.u mb ~r () f.l:l~ rs_l _Re:infIHc i!19 ~c~~~J_~e, 6 1#6 6 1#6 __~#6__ 6 1#6 6 1#6 ---- - ~--- -. ---"- -----.-..-..-- _...___T .____~ _ 'Length of Reinforcing Steel (ft) 45.20 42.00 45.40 - 42.90 45.60 Tim e Drilling was Completed (am I pm) 9 :3 5 AM 1 0 :36 AM 11:40AM 12:43 PM 1 :4 5 P M Tim e Concrete was Placed (am I pm) 11:30AM 12:00 PM 1 :50 P M 2:10 PM 3 :40 P M Depth of Pier From Too 0 f Con c re te (ft) 45.72 42.42 45.42 43.02 45.02 Elevation: Surface (ft).. 99.58 99.58 99.58 99.58 99.58 Elevation:Top of Pier (ft).. 98.00 98.00 98.00 98.00 98.00 Elevation: Bottom of Pier (ft).. 52.28 55.58 52.58 54.98 52.98 Elevation: Top of BearinQ Stratum (ft.)" 62.58 66.88 63.28 66.18 63.28 Bearina Stratum (description) Gravshale Not e: See re port # 297519 for Compressive Strength Test Specimens. . Additional Penetration not requested unless noted. uE levalion by others LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 1 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Report No.: 297518 Project No.: 0711530 Date of Service: 08/31/2007 Report Date: 09/08/2007 Project: Point West Office I Services: Straight Shaft Pier Inspection D rille r: McKinney D rillina Pie r Id e ntifica tio n B .9/9.9 E 19.9 PierDiameter(in) 2 4/F 1 2 4/F 1 De p th 0 f P ie r Fro m S u rfa c e (ft) 46.00 44.50 Depth of Bear in a Stratum From S u rfa c e (ft) 35.50 33.20 R e qui re d P e ne tra tio n (ft) 10.00 10.00 Actual Penetration (ft)- 10.50 1 1 .30 Condition of Bottom (wet I dry) Dry D rv Plumb Within Tolerance (ves Ino) Yes Yes Casing Diameter(in)/Casina Lenath (ft) 26/36 2 6/32 .1 N u m be r 0 f Bars IRe info rei n g BarSize 6 1#6 6 1#6 Length of Reinforcing S te e I (ft) 44.00 42.00 Time Drillino was Completed (am I pm) 3 :50 PM 2:50 PM I'r : m e Con c re te vv a s -p l.a c e 6 (a'm Inm) 4:45 PM 3:::i 0 P-M . ._u_.__._.__ --.--. -- . --.- -- Depth of Pier From Top 0 f Con c re te (ft) 44.42 42.92 Elevation: Surface (ft).. 99.58 99.58 Elevation: Top of Pier (ft)-- 98.00 98.00 Elevation: Bottom of Pier (ft).. 53.58 55.08 Elevation: Top ofBearino Stratum (ft.) .. 64.08 66.38 Bearing Stratum (d e scrip tio n) Grav shale Note: See report # 297519 fo r Com pre s s ive S t re n 9 t h Test S pecim ens. - Additional Penetration not requested unless noted. HE levation by others Technician: Denny Harris Started: 06:15am Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Finished: 05:30pm Rone Engineering p~ ~ K. Scott Watson, AET Project Manager LIMIT A nONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 2 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Report No.: 297757 Project No.: 0711530 Date of Service: 09/04/2007 Report Date: 09/08/2007 Project: Point West Office I Services: Straight Shaft Pier Inspection Report of Inspection D ri lie r: M cK innev D rillina Pie r Id e ntifica tio n C .9/9.9 E/9.8 E 19.3 PierDiameter(in) 2 4 IF 1 24 IF 1 24 IF 1 Depth of Pier From S u rfa c e (ft) 46.70 47.00 46.00 Depth of Bear in a Stratum From S u rfa c e (ft) 36.00 35.80 36.00 R e qui re d Penetration (ft) 10.00 10.00 10.00 Actual Penetration (ft)' 10.70 11 .20 10.00 Condition of Bottom (wet I d rv) Dry Dry D rv Plumb Within Tolerance (ve sIn 0 ) Yes Yes Yes Cas in q D i a mete r (i n) I Cas in aLe n a th (ft) 2 6 13 6 26/36 2 6/3 6 ~u rn b e r 0 f ,B a r~ " RE!jnl~rc:ii'-.9_!3 .a....r:. S l"z.f: n. 6 1#6 6 1#6 6 1#6 .--- --- ----- --- __. u..._._____ .,.--_...."....._--_..~ --~-,,--_.._---. .- --. - --,. ~-_._---,- Length of Reinforcina Steel (ft) 44.50 45.00 44.00 - Tim e DrillinQ was Completed lam 10m) 9 :2 5 AM 9 :5 0 AM 12:08 PM Tim e Con c re te was P la c e d (am I pm) 1 0 :40 AM 1 1 :00 AM 1 :20 PM Depth of Pier From Top 0 f Con c re te 1ft) 45.12 45.42 44.42 Elevation: Surface (ft)" 99.58 99.58 99.58 Elevation: Top of Pier (ft).. 98.00 98.00 98.00 Elevation: Bottom of Pier 1ft).. 52.88 52.58 53.58 Elevation: Top of Bear in a Stratum Ift.)" 63.58 63.78 63.58 BearinQ Stratum (description) Gravshale Note:See report# NA forCompresslve StrengthTestSpeclmens. 'Additional Penetration not requested unless noted. "Elevation by others Technician: Denny Harris Started: 06:15am Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Finished: 02:00pm Rone Engineering p~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specifiC samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 1 of 1 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Report No.: 297063 Project No.: 0711530 Date of Service: 08/28/2007 Report Date: 09/08/2007 Project: Point West Office I Services: Straight Shaft Pier Inspection Report of Inspection D rille r: M cK innev D rillina Pier Identification M 11 6.5 I M 117 M 11 7.5 L.9/17.9 K .3/18 Pier Diameter (in) 2 4/F 1 2 4/F 4 2 4/F 5 2 4 IF 5 2 4/F 1 Depth of Pier From S urfa ce (ft) 43.50 45.40 40.70 40.90 45.00 Depth of Bearing Stratum From Surface (ft) 32.00 31.00 31.40 32.80 34.90 Req uired Penetration (ft) 10.00 14.00 8.00 8.00 10.00 Actual Penetration (ft)" 11 .50 14.40 9.30 8.10 10.10 Condition of Bolt om (wet/dry) Dry Dry Dry D rv Dry Plumb Within Tolerance (ves I no) Yes Yes Yes Yes Yes Casing Diameter(in)/Casina Lenath (ft) 2 6/3 2 .1 26/30 26/36 26/36 26/36 .N ~m_~~Lof 13~~. t.!3~i~..!9!~i_r1JJ_I3~r_S_i.ze_____ ~t!...~___ 9 1#6 ~~~6_ 6 1#6 ~ Jt!.6_ . '_ _.,~-.. _._-- - ._h___" _.'_" Length of ReinforcllIQ Steel (ft) 41.70 43.10 37.60 40.30 ..2.00 Time Drillinq was Completed (am 10m) 8 :43 AM 9 :51 AM 10:58 AM 1 2 :25 P M 1 :1 5 PM Time Concrete was Placed (am Ipm) 1 0:25 AM 10:40 AM 1 :10 PM 1 :26 PM 2:55 PM Depth of Pier From Top of Concrete (ft) 41.92 43.82 38.45 38.65 42.75 Elevation: Surface (ft).. 99.58 99.58 99.58 99.58 99.58 Elevation: Top of Pier (ft).. 98.00 98.00 97.33 97.33 97.33 Elevation: Boltom of Pier (ft).. 56.08 54.18 58.88 58.68 54.58 E leva lion: Top of Bearina Stratum (ft.)" 67.58 68.58 68.18 66.78 64.68 Bearing Stratum (descriotion) Grav shale Note: See re port # 2 9 7 064 fo r Com p re s s i ve S tre n g th T est S p e c i men s . "Additional Penetration not requested unless noted. "Elevation by others LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 1 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Report No.: 297063 Project No.: 0711530 Date of Service: 08/28/2007 Report Date: 09/08/2007 Project: Point West Office I Services: Straight Shaft Pier Inspection D rille r: M cK innev D rillino Pie r Id e n ti fi c a ti 0 n J .2/18 G .2/1 8 PierDiameter(in) 2 4/F 1 2 4/F 1 D e p th 0 f Pie r F ro m S u rfa c e (ft) 39.60 42.50 Depth ofBearino Stratum Fro m Surface(ft) 29.00 31.40 R e qui re d P e ne tra tio n (ft) 10.00 10.00 Actual Penetration (ft)' 10.60 1 1 .1 0 Condition ofBotlom (wet I dry) Dry Dry Plumb Within Tolerance (ves Ino) Ves Ves Casino Diameter (in) ICasino Lenath 1ft) 26/30 2 6/3 2 .1 NumberofBars IReinforcina BarSize 6 1#6 6 1#6 Lenoth of Reinforcing Steel (ft) 37.50 40.00 Tim e Drilling was C om Dieted (am 10m) 2 :07 P M 3:00 PM .lJm ee.c C rlcre!O CoW 3 s Place a tam I pm) :3:10 PM 4:10 PM . _.~ -----. ----- _. ..- D e p th 0 f Pie r Fro m Too of Concrete (ft) 38.02 40.92 Elevation: Surface (ft)** 99.58 99.58 Elevation:Top of Pier (ft)** 98.00 98.00 Elevation: Bottom of Pier (ft)** 59.98 57.08 Elevation: Top of Bearina Stratum (ft.) ** 70.58 68.1 8 Bearinq Stratum (d e scrip tio n) Gravshale Note: See report # 297064 for Com pressive Strength Test S pecim ens. . Additional Penetration not requested unless noted. HE levalion by others Technician: Denny Harris Started: 06:15am Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Altn: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell Altn: Mr. Lee Stone 1-cc City of Coppell Altn: Mr. Larry Davis Finished: 05:30pm Rone Engineering p~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, LId. (CH/LB) Page 2 of 2 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Project: Point West Office I Services: Straight Shaft Pier Inspection Report of Inspection D rille r: M cK innev Drilling Pie r Id e ntifica tio n Pier D iam eter (in) Depth of Pier From Surface (ft) Depth of Bearing Stratum From Surface (ft) Required Penetration (ft) A ctua I P e netra tio n (ft)" Condition of Bottom (wet/dry) Plumb Within Tolerance (ves /no) Casing Diameter(in\/Casing Length (ft) NumberofBars /Reinforcing BarSize r':'-:-."""",;i;.--":."'.'~'-':':.'-~'- -:~-;;"'~~""'~"'---'--"'-'''''"--"-'~-'----''' -- . Length of Reinforclno Steel (ft) Time Drillino was Completed (am /pm) Time Concrete was Placed (am /pm) Depth of Pier From Top of Concrete (ft) Elevation: Surface (ft)** Elevation: Top of Pier (ft)"" Elevation: Bottom of Pier (ft)** Elevation: Top of Bearino Stratum (ft.)"" Bearing Stratum (description) E .1 /1 8 2 4 /F 1 41.00 30.00 1 0.00 1 1 .00 Dry Yes 2 6/3 0 6 / #6 - _.__.~._--- 39.30 8:25 AM 9:55 AM 39.42 99.58 98.00 5858 69.58 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Drilled Pier Inspection Report No.: 297225 Project No.: 0711530 Date of Service: 08/29/2007 Report Date: 09/08/2007 D .9/18 2 4 /F 1 42.40 31.60 10.00 10.80 Dry Yes B /17.9 2 4/F 5 38.80 29.00 8.00 9.80 Dry Yes K/9.8 L/15 2 4/F 1 2 4/F 1 46.80 43.00 36.30 32.30 10.00 10.00 10.50 10.70 Dry Dry Yes Yes 26 /3 6 2 6/3 2 .1 6/#6 6/#6 0-_' ._..._...__ .._ ___..._,._,___~_ 44.0U 41.00 11:40AM 12:30PM 1 :20 P M 1 :45 P M 45.22 41.42 99.58 99.58 98.00 98.00 52.78 56.58 63.28 67.28 Note: See report# 297226 for Compressive Strength TestSpecimens. " Add itio na I P e netra tio n not re quested unless no ted. ""E Ie va tio n by othe rs 2 6/3 2 .1 2 6/3 0 _.._~!.J!.E_ ~_ / # 6 ___ 40.00 38.00 9:30 AM 10:30 AM 10:15AM 11:35AM 40.15 36.55 99.58 99.58 97.33 97.33 57.18 60.78 67.98 70.58 Gray shale LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 1 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Report No.: 297225 Project No.: 0711530 Date of Service: 08/29/2007 Report Date: 09/08/2007 Project: Point West Office I Services: Straight Shaft Pier Inspection D rille r: McKinnev Drilling Pier Identification A /17.5 A /17 A /16.5 Pier Diameter (in) 2 4/F 5 2 4/F 4 2 4/F 1 Depth of Pier From S u rfa c e (ft) 40.00 47.50 47.20 Depth of Bearing Stratum Fro m S u rfa ce (ft) 30.00 32.00 36.00 R e quire d P e netra tio n (ft) 8.00 14.00 10.00 A ctua I P e ne tra tio n (ft)" 10.00 15.50 11 .20 Con d i ti 0 n 0 f Botto m (wet/dry) D rv D rv D rv Plumb Within Tolerance (ves / no) Yes Yes Yes Casina Diameter(in)/Casing Length (ft) 26/30 26/32 .1 26 /3 6 NumberofBars /Reinforcing BarSize 6 / #6 9 / #6 6 / #6 Length of Reinforcing Steel (ft) 37.00 44.60 45.00 Time Drilling was Completed (am tom) 1 :35 PM 2:40 PM 3:50 PM f":'11:'l Co,,:'rptp.wa:-; Pla'~"d (<'1m tpm) 3:2 5 P M 4:00 PM 4 :35-: f'-M- .,..-~~ ----,-- - ._-- _._~-f- D eo th 0 f Pie r Fro m Top 0 f Con c re te (ft) 37.75 45.92 45.62 Elevation: Surface (ft)" 9 9.58 99.58 99.58 Elevation: Top of Pier (ft).. 97.33 98.00 98.00 Elevation: Bottom of Pier (ft).. 59.58 52.08 52.38 Elevation: Top of Bearing Stratum (ft.)". 69.58 67.58 63.58 Bearina Stratum (description) Gravshale Note: See re port # 2 9 7226 fo r Com pre s s i ve S tre n g th T est S pee i men s . "Additional Penetration not requested unless noted. "Elevation by others Technician: Denny Harris Started: 06:15am Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Finished: 05:45pm Rone Engineering p~ .;:::; K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CHtLB) Page 2 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of In-Place Density Testing Report No.: 297273 Project No.: 0711530 Date of Service: 08/29/2007 Report Date: 09/08/2007 Project: Point West Office I Services: Perform In-Place Density Testing PROJECT DATA Contractor: Duke Construction, LP Test Method: ASTM 0-6938 Gauge: Troxler 3430 Gauge Serial No: 35518 Test Mode: DT Standard Counts Moisture Density Current: 735 Current: 2500 Previous: 729 Previous: 2514 MOISTURE DENSITY RELATIONS Maximum Moisture Density Project Requirements MID No. Description % (pet) Moisture Density 272998 Brown I Silty Clay wi Organics 22.5 96.5 Minimum +4 92-96 FIELD DENSITY TESTS Test Probe MID Moisture Wet Density Dry Density Density No Test Location Depth No. % (pet) (pet) (%max) Utility backfill 6" Sanitary sewer line, section B, 75' from north 6" 272998 28.7 118.3 91.9 95 end, l' below grade Utility backfill 2 6" Sanitary sewer line, section B, 75' from north 6" 272998 29.7 117.1 90.3 94 end, final Utility backfill 3 6" Sanitary sewer line, section B, 75' from south 6" 272998 28.7 117.0 90.9 94 end, 3' below grade Utility backfill 4 6" Sanitary sewer line, section B, 75' from south 6" 272998 29.1 116.6 90.3 94 end, 2' below grade Utility backftU 5 6" Sanitary sewer line, section B, 75' from south 6" 272998 30.9 116.6 89.1 92 end, l' below grade Utility backfill 6 6" Sanitary sewer line, section B, 75' from south 6" 272998 30.2 119.4 91.7 95 end, final Technician: Joe Jernigan Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Paul Byrne (1-ee copy) 1-ce City of Coppe" Attn: Mr. Lee Stone 1-cc City of Coppe" Attn: Mr. Larry Davis Started: 01 :OOpm Finished: 04:00pm Rone Engineering p~-~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 1 of 1 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (2141630-9745 Report of Concrete Compressive Strength Test Report No.: 297519 Project No.: 0711530 Date of Service: 08/31/2007 Report Date: 09/08/2007 Project: Point West Office I Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. := Contractor: Duke Construction, LP Concrete Supplier: Potter Concrete Plant: 01 Specification Requirements Strength: 3,000 psi @ 28 days Slump (in.): 5" - 7" Air (%): NA Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTfvl '-':'--;064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design 1.0.: 7751 PW Placement Date: 08/31/2007 Weather Conditions: Sunny Time Sampled: 02:00pm Temperature - Air: 960F Truck No: 119 Air Content: NA Overall Placement Location: Piers (see report #297518) Batch time: 01 :28pm Concrete: 960F Ticket No: 13879 Unit Weight (pet): NA Measured Slump (inches) 7.0 Sample Location: Pier A/1 0 REPORT OF TESTS Technician: Denny Harris Rone Engineering See Report 297518 for technician time~~ Report Distribution: . Orig: ~~~ ~op~~truction, LP (Dallas, TX) Altn: Mr. Paul Byrne ... .. ... . . ..... . . 1-cc Polter Concrete Altn: Mr. Ryan Skelly K S tt W t AET 1-cc City of Coppell Altn: Mr. Lee Stone . p c~ t ~ son, 1-cc City of Coppell Altn: Mr. Larry Davis roJec anager Cylinder Marked Date Set No. Tested 1 1 09/07/2007 1 2 09/28/2007 1 3 09/28/2007 4 10/26/2007 Age (days) 7 Diameter (in) 6.00 28 28 56 Concrete Compressive Cylinder 6" x 12" Maximum Load (Ibs) 88,440 Compressive Strength (psi) 3,130 Fracture Type Cone/Shear Area (in') 28.27 ~ LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 1 of 1 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Report No.: 295797 Project No.: 0711530 Date of Service: 08/16/2007 Report Date: 09/08/2007 Project: Point West Office I Services: Straight Shaft Pier Inspection Report of Inspection D rille r: McKinnev Drillina Pie r Id e ntifica tio n P 15.5 P 16.0 P 16.5 P 17.0 C 103 Pier Diameter (in) 24 24 24 24 24 De p th 0 f Pie r Fro m Surface(ft) 45.70 46.50 46.00 46.80 47.00 D eoth of Bearina Stratum Fro m S urfa ce (ft) 35.00 36.00 36.00 36.60 36.80 Required Penetration (ft) 10.00 10.00 10.00 10.00 10.00 Actual Penetration (ft). 10.70 10.50 10.00 10.20 10.20 Condition of Bottom (wet I dry) Dry D rv D rv D rv Dry Plumb Within Tolerance (ves Ino) Yes Yes Yes Yes Yes Casing Diameter(in)/Casina Lenath (ft) 2 6 13 5 2 6/3 6 2 6 13 6 26/36.6 26/36.8 ~~,-,~.~.~I. ~ L~~ ~. I R~_i n !9r.~i.n~.!3_ ~r S.i z e 6 1#6 6 1#6 -- 6 1#6 e..- ? .'!6_ 6 1#6 - ------.- u.__. ..__.....__. .___ Length of Reinforcina Steel (ft) 43.70 44.50 44.00 44.80 45.00 Time Drillina was Completed (am 10m) 10:24 AM 10:39AM 1 1 :03 A M 11:37AM 1 :40 P M Time Concrete was Placed (am Ipm) 11:39AM 1 1 :50 AM 12:12 PM 12:31 PM 2 :2 3 P M Depth of Pier From Too of Concrete (ft) 44.20 45.00 44.50 45.30 45.50 Elevation: Surface (ft).. 99.50 99.50 99.50 99.50 99.50 Elevation: Top of Pier (ft).. 98.00 98.00 98.00 98.00 98.00 E leva tio n: Bottom of Pier (ft).. 53.80 53.00 53.50 52.70 52.50 E leva tio n: Top of Bear in a Stratum (ft.)" 64.50 63.50 63.50 62.90 62.70 Bearina Stratum (descriotion) G ra v s h a Ie Note: See report # NA for Com pressive Strength Test Specimens. . Additional Penetration not requested unless noted. "Elevation by others LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (TMlLB) Page 1 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Report No.: 295797 Project No.: 0711530 Date of Service: 08/16/2007 Report Date: 09/08/2007 Project: Point West Office I Services: Straight Shaft Pier Inspection D rille r: M cK innev D rillina Pie r Id e n ti fi c a ti 0 n C 13.5 D 14 D 14.5 D 15 D 15.5 PierDiameter(in) 24 24 24 24 24 De p th 0 f Pie r Fro m Surface(ft) 48.00 47.00 47.00 46.20 46.40 Depth of BearinQ Stratum From S u rfa c e (ft) 37.60 36.50 36.50 36.00 36.00 Required Penetration (ft) 10.00 10.00 10.00 10.00 10.00 Actual Penetration (ft)* 10.40 10.50 10.50 10.20 10.40 Condition of Bottom (wet I drv) D rv Dry D rv D rv D rv Plumb Within Tolerance (ves Ino) Yes Yes Yes Yes Yes Casing Diameter(in)/Casino LenQth (ft) 26/37.6 26/36.5 26/36.5 2 6 13 6 2 613 6 NumberofBars IReinforcina BarSize 6 1#6 6 1#6 6 1#6 6 1#6 6 1#6 Length of Reinforcina Steel (ft) 46.00 45.00 45.00 44.20 44.40 Time Drilling was Comoleted (am Ipm) 1 :57 PM 2:15 PM 2:38 PM 3:45 PM 4:14 PM -T;me Conr.r~te:,!,as-"iaced (am Ipm) 2:55 PM 3:18 PM ::\':-S-5 -p IVl .:;j I PM -4-:4-8-P M De p th 0 f Pie r Fro m Too of Concrete (ft) 46.50 45.50 45.50 44.70 44.90 Elevation: Surface (ft).. 99.50 99.50 99.50 99.50 99.50 E Ie va ti 0 n: Top 0 f Pie r (ft) * * 98.00 98.00 98.00 98.00 98.00 Elevation: Bottom of Pier (ft).. 51 .50 52.50 52.50 53.30 53.10 Elevation: Too of Bear in a Stratum (ft.) * * 61 .90 63.00 63.00 63.50 63.50 Bearing Stratum (description) Gravshale Not e: See re port # NA for Com pressive Strength Test S pecim ens. . Additional Penetration not requested unless noted HE levation by others Technician: Gerry Graham Started: 05:45am Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Alln: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell Alln: Mr. Lee Stone 1-cc City of Coppell Alln: Mr. Larry Davis Finished: 05:45pm Rone Engineering p~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, LId. (TM/LB) Page 2 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Report No.: 296128 Project No.: 0711530 Date of Service: 08/20/2007 Report Date: 09/08/2007 Project: Point West Office I Services: Straight Shaft Pier Inspection Report of Inspection D rille r: M cK innev Pier Identification C /4 D /6.5 D /7 D 17.5 D 18 Pier Diameter (in) 24 24 24 24 24 Depth of Pier From Surface (ft) 47.00 47.70 47.30 46.30 46.00 Depth of Bearing Stratum From Surface (ft) 36.20 37.20 37.20 35.80 35.40 Required Penetration (ft) 10.00 10.00 10.00 10.00 10.00 Actual Penetration (ft)" 10.80 10.50 10.10 10.50 10.60 Condition of Bottom (wet/dry) D rv Dry D rv D rv Dry Plumb Within Tolerance (yes Ino) Yes Yes Yes Yes Yes Casing Diameter (in) I C asina Lenath (ft) 26/36.2 26/37.2 26/37.2 26/35.8 2 613 5 .4 NU,m ~e r,!?_f_B~s~ R e info rci.!1.!L.~,~L~ize 6 1#6 6 1 #6 6 1#6 6/#6 1----c-.6 l~~6_, Len a th- 0 f 'tZe-i ~'f~'rc-i n q Steel (ft) . .. .. .. .. .. ~~.~.~ .. .. 45.00 40 .1 0 46'.20 40.30 45.50 Time Drilling was Completed (am Ipm) 8:26 AM 8 :5 7 AM 9:30 AM 10:02 AM 10:19 AM Time Concrete was Placed (am 10m) 9 :40 AM 10:00AM 10:36AM 11:02AM 1 1 :20 A M Deoth of Pier From Top of Concrete (ft) 45.50 47.20 46.80 45.80 45.50 Elevation: Surface (ft)"" 99.50 99.50 99.50 99.50 99.50 Elevation:Top of Pier (ft).. 98.00 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (m"" 52.50 51.80 52.20 53.20 53.50 Elevation: Top of Bearina Stratum (ft.)"" 63.30 62.30 62.30 63.70 64.10 Bearing Stratum (descriotion) Gravshale Note:See report# NA forCompressive StrengthTestSpecimens. " Add itio n a I Pen e tra tio n not re que s te d u nle s s no te d. "E Ie va tio n by 0 the rs LIMITATIONS: The test results presented herein were prepared based upon the specifiC samples provided for testin9. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 1 of 3 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Report No.: 296128 Project No.: 0711530 Date of Service: 08/20/2007 Report Date: 09/08/2007 Project: Point West Office I Services: Straight Shaft Pier Inspection D rille r: M cK innev D rillina Pier Identification D 18.5 D 19 F .1/9 E /9 G 19 Pie r D i a mete r (i n) 24 24 24 24 24 Depth of Pier From S u rfa c e (ft) 48.20 48.70 48.50 48.30 48.00 Depth of Bear in a Stratum Fro m Surface(ft) 37.60 38.20 38.00 37.90 37.20 Required Penetration (ft) 10.00 10.00 10.00 10.00 10.00 Actual Penetration (ft)' 10.60 10.50 10.50 10.40 10.80 Condition of Bottom (wet/dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (ves Ino) Ves Ves Ves Ves Ves Casing Diameter(in)/Casing Lenath (ft) 26/37.6 26/38.2 2 6 13 8 26/37.9 26/37.2 NumberofBars IReinforcing BarSize 6 1#6 6 1#6 6 1#6 6 / #6 6 1#6 Length of Reinforcing Steel (ft) 47.10 47.80 45.50 46.30 46.00 Time Drilling was Comoleted (am 10m) 10:44 AM 11:10AM 11:30AM 1 1 :4 1 A M 12:10 PM Time COGcrete 'vas ['laced (am fpm):" 11-~7. A M 12~o-a PM 1 2 : 3 7 F>iIIt-"" I 1.:10 A rill .'" v. IV> Depth of Pier From Too of Concrete (ft) 47.70 48.20 46.00 46.80 46.50 Elevation: Surface (ft).. 99.50 99.50 99.50 99.50 99.50 Elevation:Top of Pier (ft).. 99.00 99.00 97.00 98.00 98.00 Elevation: Bottom o f Pie r (ft).. 51.30 50.80 51.00 51 .20 51.50 Elevation: Top of Bearing Stratum (ft.).. 61 .90 61.30 61.50 61.60 62.30 Bearing Stratum (description) Gravshale Note: See re port # NA for Compressive Strength Test Specimens. 'Additional Penetration not requested unless noted. HE levation by others LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/lB) Page 2 of 3 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of Drilled Pier Inspection Report No.: 296128 Project No.: 0711530 Date of Service: 08/20/2007 Report Date: 09/08/2007 Project: Point West Office I Services: Straight Shaft Pier Inspection D rille r: M cK inney D rillina Pie r Id e ntifica tio n G 16 G/7 G 18 PierDiameter(in) 24 24 24 De p th 0 f Pie r Fro m S urfa ce (ft) 46.90 47.20 47.60 Depth of Bear in a Stratum Fro m Surface(ft) 36.00 36.50 37.00 Required Penetration (ft) 10.00 10.00 10.00 Actual Penetration (ft). 10.90 10.70 10.60 Condition of Bottom (wet I dry) Dry Dry Dry Plumb Within Tolerance (yes Ino) Yes Yes Yes Casing Diameter(in)/Casing Length (ft) 2 6/3 6 26/36 .5 2 6/3 7 NumberofBars IReinforcing BarSize 6 1#6 6 1#6 6 1#6 Length of Reinforcina Steel (ft) 44.60 46.20 45.00 Time Drillina was Completed (am Ipm) 3:01 PM 3:39 PM 4:08 PM ~ J . -' . -f' fa ,; e d (a m I jJ"TlT')- ... _ - .- ------3':-4 -t P M- 4.14 PM 4.51 f> .-::- De p th 0 f Pie r Fro m Top of Concrete (ft) 45.40 45.70 46.10 Elevation: Surface (ft).. 99.50 99.50 99.50 Elevation:Top of Pier (ft).. 98.00 98.00 98.00 Elevation: Bottom of Pie r (ft).. 52.60 52.30 51.90 Elevation: Top of Bearina Stratum (ft.)" 63.50 63.00 62.50 Bearing Stratum (description) Grayshale Note: See report # NA for Compressive Strength Test Specimens. . Additional Penetration not requested unless noted. .. E Ie vation by oth ers Technician: Gerry Graham Started: 05:45am Report Distribution: Drig: Duke Construction, LP (Dallas, TX) Altn: Mr. Paul Byrne (1-ec copy) 1-cc City of Coppell Altn: Mr. Lee Stone 1-cc City of Coppell Altn: Mr. Larry Davis Finished: 05:45pm Rone Engineering p~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/lB) Page 3 of 3