Loading...
Duke Lesley-LR070910 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freldrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 296073 Project No.: 0612510 Date of Service: 08/18/2007 Report Date: 09/10/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Contractor: Concrete Supplier: Lacy Plant: On site Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 6" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA Mix Design I.D.: 5194 Placement Date: 08/18/2007 Weather Conditions: Cloudy Time Sampled: 07:20am Temperature - Air: 770F Truck No: NA Air Content: 5.7% Overall Placement Location: Paving, eastbound and westbound Dividend St., Station 34+70 to 34+00, below) Batch time: 07: 15am Concrete: 710F Ticket No: NA Unit Weight (pcf): NA Measured Slump (inches) 5.75 (cont. Sample Location: Dividend, eastbound lane, Station 34+20 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (In2) (Ibs) (psi) Type 1 1 08/21/2007 3 6.00 28.27 79,770 2,820 Unbonded Cap 1 2 08/25/2007 7 6.00 28.27 87,620 3,100 Unbonded Cap 1 3 09/15/2007 28 1 4 09/15/2007 28 Remarks: Cont: eastbound turn lane, Station 22+50 to 19+85, 25+75 to 28+25,32+25 to 34+00,35+75 to 37+28,39+00 to 4+05 LIMITATIONS: The test results presented herein were prepared based upon the specific samplll6 provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LBILB) Page 1 of 3 Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freldrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of Concrete Compressive Strength Test Report No.: 296073 Project No.: 0612510 Date of Service: 08/18/2007 Report Date: 09/10/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: Lacy Plant: On site Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 6" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design I.D.: 5194 Placement Date: 08/18/2007 Weather Conditions: Clear Time Sampled: 08:45am Temperature - Air: 790F Truck No: NA Air Content: 4.6% Overall Placement Location: Paving, eastbound and westbound Dividend St., Station 34+70 to 34+00, below) Measured Slump (inches) 2.75 Batch time: 08:40am Concrete: 760F Ticket No: NA Unit Weight (pet): NA (cont. Sample Location: Station 23+00 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (in) (in") (Ibs) (psi) Type 2 1 08/21/2007 3 6.00 28.27 88,290 3,120 Unbonded Cap 2 2 08/25/2007 7 6.00 28.27 91,340 3,230 Unbonded Cap 2 3 09/15/2007 28 2 4 09/15/2007 28 Remarks: Cont: eastbound turn lane, Station 22+50 to 19+85, 25+75 to 28+25,32+25 to 34+00,35+75 to 37+28,39+00 to 4+05 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 2 of 3 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freldrlch, Ste 195, Austin, TX 78744 Corporate Phone: (214)630-9745 Report of Concrete Compressive Strength Test Report No.: 296073 Project No.: 0612510 Date of Service: 08/18/2007 Report Date: 09/10/2007 Project: Lesley Infrastructure Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA Contractor: Concrete Supplier: Lacy Plant: On site Specification Requirements Strength: 3,600 psi @ 28 days Slump (in.): 6" maximum Air (%): 3% - 6% Test Method: ASTM C-172 ASTM C-31 (except 10.1.2) ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 Mix Design 1.0.: 5194 Placement Date: 08/18/2007 Weather Conditions: Cloudy Time Sampled: 10:55am Temperature - Air: 840F Truck No: NA Air Content: 4.1 % Overall Placement Location: Paving, eastbound and westbound Dividend St., Station 34+70 to 34+00, below) Measured Slump (inches) 1.75 Batch time: 10:50am Concrete: 780F Ticket No: NA Unit Weight (pet): NA (cont. Sample Location: Station 36+00 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Cylinder Maximum Compressive Marked Date Age Diameter Area Load Strength Fracture Set No. Tested (days) (In) (in2) (Ibs) (psi) Type 3 1 08/21/2007 3 6.00 28.27 98,630 3,490 Unbonded Cap 3 2 08/25/2007 7 6.00 28.27 103,920 3,680 Unbonded Cap 3 3 09/15/2007 28 3 4 09/15/2007 28 Remarks: Cont: eastbound turn lane, Station 22+50 to 19+85, 25+75 to 28+25,32+25 to 34+00,35+75 to 37+28,39+00 to 4+05 Started: 06: 15am Finished: 11 :30am Technician: Ryan Rawlinson Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Altn: Mr. Alex Bennelt PE (1-ec copy) 1-cc City of Coppell Altn: Mr. Lee Stone 1-cc City of Coppell Altn: Mr. Larry Davis Rone Engineering ~~ ~ K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (LB/LB) Page 3 of 3