Loading...
Duke Lesley-LR070831 (2) Rone Engineering . Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Project: Lesley Infrastructure Services: Perform In-Place Density Testing 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Report of In-Place Density Testing Report No.: 296651 Project No.: 0612510 Date of Service: 08/23/2007 Report Date: 08/31/2007 PROJECT DATA Contractor: Test Method: ASTM 0-6938 Gauge: Troxler 3430 Gauge Serial No: 35518 Test Mode: DT Standard Counts Moisture Density Current: 729 Current: 2515 Previous: 728 Previous: 2501 MOISTURE DENSITY RELATIONS MID No. 272998 Description Brown / Silty Clay w/ Organics Test No Test Location Backfill Pull box, Station 3+50, east side, final Backfill 2 Pull box, Station 3+50, west side, final Backfill 3 Pull box, Station 6+00, north side, final Backfill 4 Pull box, Station 6+00, south side, final Backfill 5 Pull box, Station 19+54, east side, final Backfill 6 Pull box, Station 19+54, west side, final Backfill 7 Pull box, Station 24+25, north side, final Backfill 8 Pull box, Station 24+25, south side, final Backfill 9 Pull box, Station 37+60, east side, final Backfill 10 Pull box, Station 37+60, west side, final Maximum Moisture Density Project Requirements % (pet) Moisture Density 22.5 96.5 Optimum +4 95 min FIELD DENSITY TESTS Probe MID Moisture Wet Density Dry Density Density Depth No. % (pet) (pet) (% max) 6" 272998 23.8 116.0 93.7 97 6" 272998 24.3 116.3 93.6 97 6" 272998 24.5 115.9 93.1 97 6" 272998 23.8 116.0 93.7 97 6" 272998 24.8 114.9 92.1 95 6" 272998 24.1 116.4 93.8 97 6" 272998 22.6 116.1 94.7 98 6" 272998 25.8 116.2 92.4 96 6" 272998 23.1 116.3 94.5 98 6" 272998 24.5 116.8 93.8 97 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 1 of 2 Rone Engineering . 8908 Ambassador Row, Dallas, TX 75247 7701 W Little York, Ste 600, Houston, TX 77040 4421 Freidrich, Ste 195, Austin, TX 78744 Corporate Phone: (214) 630-9745 Client: Duke Construction, LP 14241 Dallas Pkwy, Ste 1000 Dallas, TX 75254-2936 Report of In-Place Density Testing Report No.: 296651 Project No.: 0612510 Date of Service: 08/23/2007 Report Date: 08/31/2007 Project: Lesley Infrastructure Services: Perform In-Place Density Testing FIELD DENSITY TESTS Test Probe MID Moisture Wet Density Dry Density Density No Test Location Depth No. % (pct) (pct) (% max) Backfill 11 Pull box, Station 49+00, north side, final 6" 272998 24.7 116.0 93.0 96 Backfill 12 Pull box, Station 49+00, south side, final 6" 272998 24.2 115.9 93.3 97 Backfill 13 Switch gear, Station 13+00, east side, final 6" 272998 23.1 117.9 95.8 99 Backfill 14 Switch gear, Station 13+00, west side, final 6" 272998 24.7 117.5 94.2 98 Backfill 15 Switch gear, Station 33+46. north ~irl~, fin::!1 ~" 272998 22.9 11'7.2 -------95.4- - - 99 Backfill 16 Switch gear, Station 33+46, south side, final 6" 272998 24.0 116.3 93.8 97 Backfill 17 Switch gear, Station 38+00, east side, final 6" 272998 24.1 116.5 93.9 97 Backfill 18 Switch gear, Station 38+00, west side, final 6" 272998 23.6 116.9 94.6 98 Backfill 19 Switch gear, Station 41 +66, north side, final 6" 272998 23.9 117.1 94.5 98 Backfill 20 Switch gear, Station 41 +66, south side, final 6" 272998 23.2 116.9 94.9 98 Backfill 21 Switch gear, Station 41 +00, east side, final 6" 272998 23.7 117.3 94.8 98 Backfill 22 Switch gear, Station 41 +00, west side, final 6" 272998 24.9 1169 93.6 97 Technician: Joe Jernigan Report Distribution: Orig: Duke Construction, LP (Dallas, TX) Attn: Mr. Alex Bennett PE (1-ec copy) 1-ec Lacy Construction Attn: Mr. Kevin Briles 1-cc City of Coppell Attn: Mr. Lee Stone 1-cc City of Coppell Attn: Mr. Larry Davis Started: 09:00am Finished: 11 :30am Rone Engineering ,~.;::;> K. Scott Watson, AET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (CH/LB) Page 2 of 2