Report of Concrete Compressive Strength Test
Report No.: 295199
Project No.: 0612510
Date of Service: 08/10/2007
Report Date: 08/20/2007
Project: Lesley Infrastructure
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor:
Concrete Supplier: Lacy
Plant: On site
Specification Requirements
Strength: 3,600 psi @ 28 days
Slump (in.): 4" maximum
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design 1.0.: 5194
Placement Date: 08/10/2007
Weather Conditions: Clear
Time Sampled: 06:15am
Temperature - Air: 810F
Truck No: NA
Air Content: 4.2%
Overall Placement Location:
Paving for Dividend Street, Stations 19+00 to 39+50, eastbound lane
Measured
Slump
(inches)
1.0
Batch time: 06: 1 Oam
Concrete: 850F
Ticket No: NA
Unit Weight (pcf): NA
Sample Location:
Station 19+54
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
1 1 08/17/2007 7 6.00 28.27 101,500 3,590 Unbonded Cap
1 2 09/07/2007 28 6.00 28.27 116,570 4,120 Cone/Split
1 3 09/07/2007 28 6.00 28.27 118,590 4,190 Cone/Shear
Average 4,160
4 08/14/2007 4 6.00 28.27 94,980 3,360 Unbonded Cap
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(LB/LB) Page 1 of 9
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 295199
Project No.: 0612510
Date of Service: 08/10/2007
Report Date: 08/20/2007
Project: Lesley Infrastructure
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor:
Concrete Supplier: Lacy
Plant: On site
Specification Requirements
Strength: 3,600 psi @ 28 days
Slump (in.): 4" maximum
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
,ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design 1.0.: 5194
Placement Date: 08/10/2007
Weather Conditions: Clear
Time Sampled: 07:15am
Temperature - Air: 850F
Truck No: NA
Air Content: 3.9%
Overall Placement Location:
Paving for Dividend Street, Stations 19+00 to 39+50, eastbound lane
Measured
Slump
(inches)
0.75
Batch time: 07: 1 Oam
Concrete: 890F
Ticket No: NA
Unit Weight (pet): NA
Sample Location:
Station 20+85
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
2 1 08/17/2007 7 6.00 28.27 97,090 3,430 Unbonded Cap
2 2 09/07/2007 28 6.00 28.27 115,920 4,100 Shear
2 3 09/07/2007 28 6.00 28.27 121 , 170 4,290 Cone/Split
Average 4,190
2 4 08/14/2007 4 6.00 28.27 82,040 2,900 Unbonded Cap
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(LBfLB) Page 2 of 9
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 295199
Project No.: 0612510
Date of Service: 08/10/2007
Report Date: 08/20/2007
Project: Lesley Infrastructure
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor:
Concrete Supplier: Lacy
Plant: On site
Specification Requirements
Strength: 3,600 psi @ 28 days
Slump (in.): 4" maximum
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design I.D.: 5194
Placement Date: 08/10/2007
Weather Conditions: Clear
Time Sampled: 07:45am
Temperature - Air: 860F
Truck No: NA
Air Content: 4.6%
Overall Placement Location:
Paving for Dividend Street, Stations 19+00 to 39+50, eastbound lane
Measured
Slump
(inches)
1.25
Batch time: 07:40am
Concrete: 890F
Ticket No: NA
Unit Weight (pet): NA
Sample Location:
Station 22+50
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
3 1 08/17/2007 7 6.00 28.27 93,160 3,290 Unbonded Cap
3 2 09/07/2007 28 6.00 28.27 111 ,760 3,950 Cone/Split
3 3 09/07/2007 28 6.00 28.27 115,270 4,080 Shear
Average 4,010
3 4 08/14/2007 4 6.00 28.27 90,550 3,200 Unbonded Cap
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(LB/LB) Page 3 of 9
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 295199
Project No.: 0612510
Date of Service: 08/10/2007
Report Date: 08/20/2007
Project: Lesley Infrastructure
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor:
Concrete Supplier: Lacy
Plant: On site
Specification Requirements
Strength: 3,600 psi @ 28 days
Slump (in.): 4" maximum
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design 1.0.: 5194
Placement Date: 08/10/2007
Weather Conditions: Clear
Time Sampled: 08:45am
Temperature - Air: 880F
Truck No: NA
Air Content: 4.3%
Overall Placement Location:
Paving for Dividend Street, Stations 19+00 to 39+50, eastbound lane
Measured
Slump
(inches)
1.0
Batch time: 08:40am
Concrete: 910F
Ticket No: NA
Unit Weight (pet): NA
Sample Location:
Station 25+50
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
4 1 08/17/2007 7 6.00 28.27 89,700 3,170 Unbonded Cap
4 2 09/07/2007 28 6.00 28.27 111,040 3,930 Cone/Split
4 3 09/07/2007 28 6.00 28.27 108,610 3,840 Cone/Split
Average 3,880
4 4 08/14/2007 4 6.00 28.27 82,970 2,930 Unbonded Cap
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(LB/LB) Page 4 of 9
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 295199
Project No.: 0612510
Date of Service: 08/10/2007
Report Date: 08/20/2007
Project: Lesley Infrastructure
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor:
Concrete Supplier: Lacy
Plant: On site
Specification Requirements
Strength: 3,600 psi @ 28 days
Slump (in.): 4" maximum
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-l 064
ASTM C-138
ASTM C-39
Mix Design 1.0.: 5194
Placement Date: 08/10/2007
Weather Conditions: Clear
Time Sampled: 09:35am
Temperature - Air: 890F
Truck No: NA
Air Content: 4.0%
Overall Placement Location:
Paving for Dividend Street, Stations 19+00 to 39+50, eastbound lane
Measured
Slump
(inches)
1.25
Batch time: 09:30am
Concrete: 920F
Ticket No: NA
Unit Weight (pet): NA
Sample Location:
Station 27+75
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
5 1 08/17/2007 7 6.00 28.27 91,790 3,250 Unbonded Cap
5 2 09/07/2007 28 6.00 28.27 119,430 4,220 Cone/Split
5 3 09/07/2007 28 6.00 28.27 109,950 3,890 Shear
Average 4,060
5 4 08/14/2007 4 6.00 28.27 90,450 3,200 Unbonded Cap
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(LB/LB) Page 5 of 9
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 295199
Project No.: 0612510
Date of Service: 08/10/2007
Report Date: 08/20/2007
Project: Lesley Infrastructure
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor:
Concrete Supplier: Lacy
Plant: On site
Specification Requirements
Strength: 3,600 psi @ 28 days
Slump (in.): 4" maximum
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-'i064
ASTM C-138
ASTM C-39
Mix Design 1.0.: 5194
Placement Date: 08/10/2007
Weather Conditions: Clear
Time Sampled: 10:15am
Temperature - Air: 900F
Truck No: NA
Air Content: 4.4%
Overall Placement Location:
Paving for Dividend Street, Stations 19+00 to 39+50, eastbound lane
Measured
Slump
(inches)
1.25
Batch time: 10:10am
Concrete: 930F
Ticket No: NA
Unit Weight (pet): NA
Sample Location:
Station 30+00
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
6 1 08/17/2007 7 6.00 28.27 94,620 3,350 Unbonded Cap
6 2 09/07/2007 28 6.00 28.27 108,460 3,840 Cone/Shear
6 3 09/07/2007 28 6.00 28.27 108,470 3,840 Cone/Split
Average 3,840
6 4 08/14/2007 4 6.00 28.27 80,240 2,840 Unbonded Cap
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(LB/LB) Page 6 of 9
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 295199
Project No.: 0612510
Date of Service: 08/10/2007
Report Date: 08/20/2007
Project: Lesley Infrastructure
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor:
Concrete Supplier: Lacy
Plant: On site
Specification Requirements
Strength: 3,600 psi @ 28 days
Slump (in.): 4" maximum
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
Mix Design 1.0.: 5194
Placement Date: 08/10/2007
Weather Conditions: Clear
Time Sampled: 11 :25am
Temperature - Air: 940F
Truck No: NA
Air Content: 4.4%
Overall Placement Location:
Paving for Dividend Street, Stations 19+00 to 39+50, eastbound lane
Measured
Slump
(inches)
1.25
Batch time: 11 :20am
Concrete: 960F
Ticket No: NA
Unit Weight (pcf): NA
Sample Location:
Station 32+25
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in2) (Ibs) (psi) Type
7 1 08/17/2007 7 6.00 28.27 95,950 3,390 Unbonded Cap
7 2 09/07/2007 28 6.00 28.27 115,680 4,090 Cone/Split
7 3 09/07/2007 28 6.00 28.27 111,380 3,940 Cone/Split
Average 4,020
7 4 08/14/2007 4 6.00 28.27 88,860 3,140 Unbonded Cap
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(LB/LB) Page 7 of 9
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 295199
Project No.: 0612510
Date of Service: 08/10/2007
Report Date: 08/20/2007
Project: Lesley Infrastructure
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor:
Concrete Supplier: Lacy
P~nt Ons~
Specification Requirements
Strength: 3,600 psi @ 28 days
Slump (in.): 4" maximum
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
.ASTII~ C..10b4
ASTM C-138
ASTM C-39
Mix Design I.D.: 5194
Placement Date: 08/10/2007
Weather Conditions: Clear
Time Sampled: 12:15pm
Temperature - Air: 960F
Truck No: NA
Air Content: 4.7%
Overall Placement Location:
Paving for Dividend Street, Stations 19+00 to 39+50, eastbound lane
Measured
Slump
(inches)
1.5
Batch time: 12:10pm
Concrete: 990F
Ticket No: NA
Unit Weight (pet): NA
Sample Location:
Station 35+00
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
8 1 08/17/2007 7 6.00 28.27 98,150 3,470 Unbonded Cap
8 2 09/07/2007 28 6.00 28.27 110,640 3,910 Shear
8 3 09/07/2007 28 6.00 28.27 111,820 3,950 Cone/Split
Average 3,930
8 4 08/14/2007 4 6.00 28.27 89,390 3,160 Unbonded Cap
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(LB/LB) Page 8 of 9
Rone Engineering
.
Client:
Duke Construction, LP
14241 Dallas Pkwy, Ste 1000
Dallas, TX 75254-2936
8908 Ambassador Row, Dallas, TX 75247
7701 W Little York, Ste 600, Houston, TX 77040
4421 Freidrich, Ste 195, Austin, TX 78744
Corporate Phone: (214) 630-9745
Report of Concrete Compressive Strength Test
Report No.: 295199
Project No.: 0612510
Date of Service: 08/10/2007
Report Date: 08/20/2007
Project: Lesley Infrastructure
Services: Obtain samples of fresh concrete at the placement locations, perform required testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
Contractor:
Concrete Supplier: Lacy
Plant: On site
Specification Requirements
Strength: 3,600 psi @ 28 days
Slump (in.): 4" maximum
Air (%): 3% - 6%
Test Method: ASTM C-172
ASTM C-31 (except 10.1.2)
ASTM C-143
ASTM C-231
ASTM C-1 064
ASTM C-138
ASTM C-39
Mix Design 1.0.: 5194
Placement Date: 08/10/2007
Weather Conditions: Clear
Time Sampled: 01 :OOpm
Temperature - Air: 970F
Truck No: NA
Air Content: 4.4%
Overall Placement Location:
Paving for Dividend Street, Stations 19+00 to 39+50, eastbound lane
Measured
Slump
(inches)
1.5
Batch time: 12:55pm
Concrete: 990F
Ticket No: NA
Unit Weight (pet): NA
Sample Location:
Station 37+50
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
Cylinder Maximum Compressive
Marked Date Age Diameter Area Load Strength Fracture
Set No. Tested (days) (in) (in') (Ibs) (psi) Type
9 1 08/17/2007 7 6.00 28.27 78,540 2,780 Unbonded Cap
9 2 09/07/2007 28 6.00 28.27 98,000 3,470 Shear
9 3 09/07/2007 28 6.00 28.27 108,250 3,830 Cone/Split
Average 3,650
9 4 08/14/2007 4 6.00 28.27 78,500 2,780 Unbonded Cap
Technician: Ryan Rawlinson
Report Distribution:
Orig: Duke Construction, LP (Dallas, TX)
Attn: Mr. Alex Bennett PE (1-ec copy)
1-cc City of Coppell Attn: Mr. Larry Davis
1-ec Lacy Construction Attn: Mr. Kevin Briles
1-cc City of Coppell Attn: Mr. Lee Stone
Started: 05:15am Finished: 03:15pm Rone Engineering
p~.~
K. Scott Watson, AET
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
(lB/lB) Page 9 of 9